Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016A388 + (11:01:10, 7 January 2025)
- HNP-98-056, Requests That Encl Revised TS Bases Section 4.0.2 Which Clarifies Guidance Related to Safely Performing Surveillance Testing at Power Be Ref in Response to GL 91-04 + (11:01:11, 7 January 2025)
- ML18016A383 + (11:01:14, 7 January 2025)
- HNP-98-047, Submits Response to List of Recommended Actions That Should Be Taken by Util to Ensure Continued Safety of Auxiliary Reservoir Dam + (11:01:15, 7 January 2025)
- ML18016A379 + (11:01:17, 7 January 2025)
- IR 05000400/1997013 + (11:01:18, 7 January 2025)
- HNP-98-039, Forwards Response to GL 97-06, Degradation of SG Internals + (11:01:19, 7 January 2025)
- ML18016A374 + (11:01:22, 7 January 2025)
- ML18016A373 + (11:01:23, 7 January 2025)
- HNP-98-044, Forwards Rev 32 to PLP-201, Emergency Plan, IAW 10CFR50, App E.Changes Incorporated by Rev Includes Three Listed Categories + (11:01:24, 7 January 2025)
- ML18016A371 + (11:01:24, 7 January 2025)
- ML18016A354 + (11:01:27, 7 January 2025)
- ML18016A364 + (11:01:27, 7 January 2025)
- HNP-98-035, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-13.Corrective Actions:Justification for Continued Operation Was Generated Along W/Associated Engineering Evaluation + (11:01:28, 7 January 2025)
- HNP-98-033, Monthly Operating Rept for Feb 1998 for Shnpp + (11:01:30, 7 January 2025)
- ML18016A350 + (11:01:32, 7 January 2025)
- HNP-98-036, Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months + (11:01:33, 7 January 2025)
- ML18016A348 + (11:01:33, 7 January 2025)
- HNP-98-031, Responds to NRC GL 97-05, Steam Generator Tube Insp Techniques, for Harris Nuclear Plant + (11:01:35, 7 January 2025)
- 05000400/LER-1997-021-02, Forwards LER 97-021-02,describing Addl Condition Identified During on-going TS Surveillance Procedure Review Project.Rev Includes Update to CAs + (11:01:39, 7 January 2025)
- ML18016A341 + (11:01:40, 7 January 2025)
- ML18016A339 + (11:01:45, 7 January 2025)
- ML18016A338 + (11:01:47, 7 January 2025)
- ML18016A337 + (11:01:48, 7 January 2025)
- ML18016A333 + (11:01:49, 7 January 2025)
- ML18016A332 + (11:01:50, 7 January 2025)
- IR 05000400/1997012 + (11:01:51, 7 January 2025)
- HNP-98-030, 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr + (11:01:52, 7 January 2025)
- 05000400/LER-1998-003, :on 980129,failure to Perform Shutdown Margin Calculation Required by TS Surveillance Requirements Occurred.Caused by Ambiguity in TS 3.1.3.1.c.Procedures Revised + (11:01:55, 7 January 2025)
- ML18016A328 + (11:01:56, 7 January 2025)
- ML18016A327 + (11:01:57, 7 January 2025)
- ML18016A326 + (11:01:58, 7 January 2025)
- ML18016A323 + (11:02:00, 7 January 2025)
- ML18016A322 + (11:02:01, 7 January 2025)
- ML18016A319 + (11:02:03, 7 January 2025)
- HNP-98-018, Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant + (11:02:04, 7 January 2025)
- HNP-98-016, Provides Proprietary Notification That Reactor Operator Licensed on Plant Reassigned from Position for Which Util Previously Certified Need for Reactor Operator License.Encl Withheld (Ref 10CFR2.790(a)(6)) + (11:02:05, 7 January 2025)
- 05000400/LER-1998-001, :on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01 + (11:02:08, 7 January 2025)
- ML18016A312 + (11:02:10, 7 January 2025)
- HNP-98-007, Forwards Listed Info in Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (11:02:11, 7 January 2025)
- ML18016A305 + (11:02:13, 7 January 2025)
- ML18016A308 + (11:02:13, 7 January 2025)
- HNP-98-011, Forwards Rev 0 to Procedure HNP-IST-002, Shearon Harris Nuclear Power Plant,Ist Program Plan - 2nd Interval. Plan Describes Tests Required to Verify Operational Readiness of Class 1,2 & 3 Pumps & Valves + (11:02:14, 7 January 2025)
- HNP-98-013, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-12.Corrective Actions:Temporary Interim Action Will Remain in Place Until Specific Procedural Requirements Are Implemented + (11:02:16, 7 January 2025)
- ML18016A298 + (11:02:24, 7 January 2025)
- ML18016A296 + (11:02:25, 7 January 2025)
- ML18016A293 + (11:02:26, 7 January 2025)
- HNP-98-012, Forwards Listed Emergency Planning Info in Response to NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info. W/O Encl + (11:02:27, 7 January 2025)
- ML18016A291 + (11:02:27, 7 January 2025)
- HNP-98-010, Forwards Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. Plan Describes Exams & Schedules for Performing ASME Code Insps of Class 1,2 & 3 Components & Supports + (11:02:29, 7 January 2025)
- IR 05000400/1997010 + (11:02:31, 7 January 2025)