HNP-98-033, Monthly Operating Rept for Feb 1998 for Shnpp
| ML18016A351 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/28/1998 |
| From: | Donahue J, Shannon Rogers CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HNP-98-033, HNP-98-33, NUDOCS 9803240173 | |
| Download: ML18016A351 (7) | |
Text
CATEGORY 1 REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME
- a AUTHOR AFFILIATION ROGERS,.S'.
Carolina Power E Light Co.
DONAHUE,J.W.
Carolina Power
&. Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000400
SUBJECT:
Monthly operating rept for Feb 1998 for SHNP
.W/980313.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I
ENCL I
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 E
RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL:
6 FILE CENTE EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME FLANDERS,S AEOD/SPD/RRAB OC/DBA/PAD NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 0
Y D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
l f
~ P I
wk I
Carolina Power R Ught Cotnpany Harris Nuclear Plant PO Box 165 New Hill NC 27562 MAR 1 3 1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Serial: HNP-98-033 SHEARON HARMSNUCLEARPOWER PLANT DOCKETNO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report ofoperating statistics and shutdown experience for the month of February 1998 is provided.
Sincerely, J. W. Donahue Director of Site Operations Harris Plant SGR Enclosure c:
Mr. J. B. Brady - NRC Senior Resident Inspector
~
Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator
~ a )
9803240i73 980228 PDR ADOCK 05000400 R
PDR r,~gjj t~
tM State Road 1134 New Hill NC
4 4
1 I
I tI
Enclosure to Serial HNP-98-033 Sheet I of2 CP&L CO.
RUN DATE 03/02/98 RUN TIME 11:44:58 PLANT PERFORMANCE DATA SYSTEM OPERATZNG DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36-000 OPERATXNG STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.
UNIT NAME:
HARRIS UNIT 1 2.
REPORTING PERIOD:
FEBRUARY 98 3.
L1CENSED THERMAL POWER (MWT):
2775 4.
NAMEPLATE RAT1NG (GROSS MWE):
950.9 5.
DESIGN ELECTRICAL RATING (NET MWE):
900.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
t4AX DEPENDABLE CAPACITY (NET MWE):
860.0
- 8. IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS 3 THRU 7)
SZNCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10.
REASONS FOR RESTRICTION IF ANY:
THIS MONTH YR TO DATE CUMUL ATZVE 11.
HOURS IN REPORTXNG PERIOD 12.
NUMBER OF HOURS REACTOR CRXTICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN (MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS 672.00 672.00
.00 672.00
.00 1860324.48 626612.00 588880.00 100.00 100.00 101.90 97.37
.00 (TYPES'ATEN'4945.00 79725.71
.00 78909.54
.00 211754606.76 70502758.00 65766750.00 83.11 83.11 80.54 76.96 3.34 1416. 00 1416.00
.00 1416.00
.00 3919829.58 1320954.00 1241445. 00 100.00 100.00 101. 94
- 97. 41
.00 AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 1.16 -
9
I p
"~
I
~ '
Enclosure to Serial: HNP-98-033 Sheet 2 of2 CPGL CO.
RUN DATE 03/02/98 RUN TIME 11:44:57 PLANT PERFORMANCE DATA SYSTEM APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE 1
RPD39-000 FEBRUARY 1998 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15 16 881 880 877 877 879 880 881 879 881 879 872 873 879 880 880 876 17 18 19 20 21 22 23 25 26 27 28 866 871 876 876 878 879 879 872 873 877 872 865