Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P517 + (20:01:01, 7 December 2024)
- L-99-055, Forwards Disk Containing Annual Exposure Rept for 1998. Attachment 1 Is Description of File Structure of Transmitted Data.Without Disk + (20:01:02, 7 December 2024)
- ML20205P515 + (20:01:02, 7 December 2024)
- AECM-88-0211, Forwards Updated Svc List for Util Correspondence & Requests That WT Cottle Be Primary Addressee + (20:01:03, 7 December 2024)
- ML20205P512 + (20:01:04, 7 December 2024)
- ML20205P509 + (20:01:04, 7 December 2024)
- ML20205P508 + (20:01:05, 7 December 2024)
- ML20205P505 + (20:01:07, 7 December 2024)
- 05000336/LER-1986-002-01, :on 860417,C-E Investigation Determined That Acceptance Criteria Nonconservative for Meeting RCS Flow Limiting Condition for Operation.Caused by Procedural Inadequacy.Procedural Change Made + (20:01:10, 7 December 2024)
- ML20205P503 + (20:01:11, 7 December 2024)
- NLS8800476, Application for Amend to License DPR-46,deleting 1,000 Psig Pressure Permissive from MSIV Closure Scram Trip Setting & Making Miscellaneous Editorial Corrections.Fee Paid + (20:01:12, 7 December 2024)
- ML20205P497 + (20:01:14, 7 December 2024)
- ML20205P498 + (20:01:14, 7 December 2024)
- ML20205P496 + (20:01:15, 7 December 2024)
- ML20205P495 + (20:01:16, 7 December 2024)
- ML20205P494 + (20:01:16, 7 December 2024)
- ML20205P493 + (20:01:17, 7 December 2024)
- ML20205P492 + (20:01:17, 7 December 2024)
- 05000354/LER-1986-005-01, :on 860416,during Fuel Load,Discovered Filtration,Recirculation,Ventilation Sys Inoperable.Caused by Personnel Error.Review of Addl Training Requirements Initiated + (20:01:19, 7 December 2024)
- ML20205P490 + (20:01:20, 7 December 2024)
- ML20205P488 + (20:01:24, 7 December 2024)
- ML20205P487 + (20:01:25, 7 December 2024)
- ML20205P484 + (20:02:48, 7 December 2024)
- ML20205P483 + (20:02:50, 7 December 2024)
- ML20205P481 + (20:02:52, 7 December 2024)
- ML20205P480 + (20:02:52, 7 December 2024)
- ML20205P476 + (20:02:55, 7 December 2024)
- ML20205P478 + (20:02:55, 7 December 2024)
- ML20205P473 + (20:02:56, 7 December 2024)
- 05000482/LER-1986-022, :on 860413,control Room Ventilation Isolation Signal Occurred.Caused by Loss of 120-volt Ac Instrument Bus NN04 Due to Blown Fuse.Bus Repowered from Normal Power Supply & Fuse Replaced + (20:02:58, 7 December 2024)
- LIC-99-0035, Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure + (20:02:59, 7 December 2024)
- ML20205P469 + (20:03:00, 7 December 2024)
- ML20205P468 + (20:03:01, 7 December 2024)
- ML20205P467 + (20:03:02, 7 December 2024)
- ML20205P465 + (20:03:03, 7 December 2024)
- ML20205P466 + (20:03:03, 7 December 2024)
- RBG-29153, Suppl 9 to River Bend Station Unit 1 Startup Test Rept + (20:03:04, 7 December 2024)
- ML20205P464 + (20:03:04, 7 December 2024)
- ML20205P462 + (20:03:05, 7 December 2024)
- ML20205P461 + (20:03:06, 7 December 2024)
- PNO-III-87-044A, on 870327,after Attempted Critical Approach, Plant Taken Back to Cold Shutdown to Replace Nuclear Instrument Detector Which Did Not Indicate Properly.Work Should Be Completed by 870401 + (20:03:07, 7 December 2024)
- ML20205P459 + (20:03:09, 7 December 2024)
- IR 05000424/1985061 + (20:03:11, 7 December 2024)
- ML20205P456 + (20:03:11, 7 December 2024)
- ML20205P454 + (20:03:14, 7 December 2024)
- 05000327/LER-1986-012, :on 860415,failure to Properly Stroke Time Containment Isolation Valve Noted.Caused by Incorrect Surveillance Requirement Procedure.Procedure Revised & Valves Stroke Timed to Closed Position + (20:03:16, 7 December 2024)
- ML20205P450 + (20:03:18, 7 December 2024)
- 05000414/LER-1986-004-04, :on 860416,main Feedwater Isolation Occurred When General Warning Alarm Received on Both Trains of solid-state Protection Sys.Caused by Insufficient Connection of Wire to multi-plexer Test Switch + (20:03:19, 7 December 2024)
- PNO-III-87-045, on 870325,licensee Informed Inspector That Gas Chromatograph Containing 15 Mci Ni-63 Involved in Fire in Mar 1984.Unit Still Located at Fire Site.Inspector Performed Wipe Tests Which Revealed Contamination of Unit + (20:03:20, 7 December 2024)
- PNO-III-88-089, on 881030,two Level Gauges Mounted on Large Tank Containing Asphalt Damaged in Explosion & Fire That Killed Two Workers & Injured Two.Gauges Melted Causing Higher than Normal Radiation Levels Outside Gauges + (20:03:21, 7 December 2024)
- ML20205P442 + (20:03:22, 7 December 2024)
- ML20205P440 + (20:03:22, 7 December 2024)