Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206C074 + (07:19:20, 7 December 2024)
- ML20206C073 + (07:19:21, 7 December 2024)
- ML20206C072 + (07:19:21, 7 December 2024)
- ML20206C068 + (07:19:23, 7 December 2024)
- ML20206C066 + (07:19:24, 7 December 2024)
- IR 05000369/1999002 + (07:19:30, 7 December 2024)
- ML20206C063 + (07:19:30, 7 December 2024)
- ML20206C062 + (07:19:31, 7 December 2024)
- ML20206C061 + (07:19:32, 7 December 2024)
- ML20206C058 + (07:19:32, 7 December 2024)
- ML20206C052 + (07:19:33, 7 December 2024)
- IR 05000412/1986017 + (07:19:34, 7 December 2024)
- ML20206C051 + (07:19:34, 7 December 2024)
- ML20206C045 + (07:19:36, 7 December 2024)
- ML20206C043 + (07:19:37, 7 December 2024)
- ML20206C041 + (07:19:37, 7 December 2024)
- ML20206C038 + (07:19:38, 7 December 2024)
- ML20206C039 + (07:19:38, 7 December 2024)
- ML20206C032 + (07:19:39, 7 December 2024)
- JPN-88-060, Forwards Application for Amend to License DPR-59,eliminating Type a Primary Containment Leakage Rate Test During 1988 Refueling Outage.Fee Paid + (07:19:40, 7 December 2024)
- ML20206C031 + (07:19:40, 7 December 2024)
- ML20206C027 + (07:19:41, 7 December 2024)
- ML20206C025 + (07:19:42, 7 December 2024)
- 05000324/LER-1999-002-02, :on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With + (07:19:44, 7 December 2024)
- 05000344/LER-1988-037, :on 880831,turbine Bldg Crane Bay Access Door Inoperable Due to Broken Latch.Caused by Equipment Failure Due to High Usage of Door.Door Has Been Blocked Closed to Prevent Opening + (07:19:49, 7 December 2024)
- ML20206C015 + (07:19:51, 7 December 2024)
- ML20206C014 + (07:19:52, 7 December 2024)
- ML20206C011 + (07:19:52, 7 December 2024)
- ML20206C010 + (07:19:53, 7 December 2024)
- ML20206C008 + (07:19:54, 7 December 2024)
- ML20206C005 + (07:19:55, 7 December 2024)
- ML20206C007 + (07:19:55, 7 December 2024)
- ML20206C004 + (07:19:57, 7 December 2024)
- ML20206C002 + (07:19:58, 7 December 2024)
- ML20206C001 + (07:19:58, 7 December 2024)
- ML20206B998 + (07:19:59, 7 December 2024)
- ML20206B996 + (07:20:00, 7 December 2024)
- ML20206B995 + (07:20:00, 7 December 2024)
- ML20206B993 + (07:20:01, 7 December 2024)
- ML20206B992 + (07:20:01, 7 December 2024)
- ML20206B988 + (07:20:02, 7 December 2024)
- ML20206B991 + (07:20:02, 7 December 2024)
- ML20206B987 + (07:20:03, 7 December 2024)
- ML20206B986 + (07:20:04, 7 December 2024)
- ML20206B981 + (07:20:05, 7 December 2024)
- ML20206B984 + (07:20:05, 7 December 2024)
- ML20206B980 + (07:20:06, 7 December 2024)
- 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements + (07:20:07, 7 December 2024)
- ML20206B978 + (07:20:07, 7 December 2024)
- ML20206B973 + (07:20:09, 7 December 2024)
- ML20206B975 + (07:20:09, 7 December 2024)
- ML20206B972 + (07:20:10, 7 December 2024)