ML20206B980
ML20206B980 | |
Person / Time | |
---|---|
Site: | Davis Besse, Perry, 05000000 |
Issue date: | 04/09/1987 |
From: | Nash D NRC OFFICE OF STATE PROGRAMS (OSP) |
To: | Firestone L OHIO EDISON CO. |
References | |
NUDOCS 8704100107 | |
Download: ML20206B980 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20058H6511990-11-14014 November 1990
[Table view]Forwards Maint Team Insp Rept 50-440/90-12 on 900917-21 & 1001-05 & Notice of Violation ML20058H6411990-11-0909 November 1990 Forwards Final SALP Rept 50-346/90-01 Covering Mar 1989 to June 1990 ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20058D6001990-10-29029 October 1990 Requests Util Provide Ref Matls Listed in Encl 1, Ref Matl Requirements, for Licensing Exams Scheduled for Wk of 910218 ML20058D5141990-10-26026 October 1990 Requests That Util Furnish Items Listed in Encl 1, Ref Matl Requirements, for Requalification Program Evaluation Scheduled for Wk of 910211 ML20058D6771990-10-25025 October 1990 Forwards Exemption Request for Reactor Operators Selected for NRC Requalification Exam ML20058F4811990-10-24024 October 1990 Forwards Safety Insp Rept 50-346/90-16 on 900814-1009.No Violations Noted ML20058D2081990-10-19019 October 1990 Forwards Safety Insp Rept 50-440/90-18 on 900730-0919 & Notice of Violation ML20062C6811990-10-18018 October 1990 Forwards Safeguards Insp Rept 50-346/90-19 on 900924-28.No Violations Noted ML20062A8631990-10-15015 October 1990 Forwards Safety Insp Rept 50-440/90-19 on 900905-21.No Violations Noted ML20059N6661990-10-0909 October 1990 Forwards Correction to SER Re Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements.W/O Encl DD-90-06, Forwards Director'S Decision DD-90-06 Dtd 900925,for Info1990-09-27027 September 1990 Forwards Director'S Decision DD-90-06 Dtd 900925,for Info IR 05000346/19900091990-09-26026 September 1990 Forwards Insp Repts 50-346/90-09,50-346/90-12 & 50-346/90-13 on 900417-0717 & Notice of Violation ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059L6041990-09-14014 September 1990 Confirms 901002 Meeting at Plant Site to Present Initial SALP 8 Rept for Facility ML20059J2511990-09-13013 September 1990 Forwards Safety Insp Rept 50-346/90-17 on 900827-31.No Violations Noted ML20059L1571990-09-0707 September 1990 Forwards Exam Rept 50-440/OL-90-02 on 900806.Answer Key & Facility Comment Resolution Also Encl ML20059G1431990-09-0404 September 1990 Forwards Safety Insp Rept 50-346/90-15 on 900701-0813. Violation Noted But Not Cited.Util Implemented Corrective Actions as Result of Violation & Will Be Examined During Future NRC Insps ML20059G8791990-08-29029 August 1990 Requests Final Analysis of Plant Combustible Gas Control Sys Addressing Key Elements Identified in Encl Ser,Section 8.0 Re Mark III Containment Hydrogen Control by 910301 ML20059B4801990-08-22022 August 1990 Forwards Safety Insp Rept 50-440/90-13 on 900625-0802 & Notice of Violation ML20056B2701990-08-20020 August 1990 Forwards Safety Evaluation Granting 900710 Request for Relief from ASME Code for Class 3 Piping in Svc Water Sys. Request Granted Until Next Scheduled Outage Exceeding 30 Days But No Later than Dec 1991 ML20059A6821990-08-13013 August 1990 Forwards Safety Insp Rept 50-346/90-09 on 900417-0717. Violations Noted But Not Cited.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action Based on Findings of Insp ML20059A6631990-08-10010 August 1990 Forwards Enforcement Conference Rept 50-346/90-14 on 900601 & 900717 Telcon Re Violations Noted in Insp Repts 50-346/90-09 & 50-346/90-12 ML20059A6721990-08-10010 August 1990 Forwards Safety Insp Rept 50-346/90-13 on 900605-30 & 0709. Violation Noted But Not Cited ML20058N4921990-08-0808 August 1990 Forwards Safety Insp Rept 50-440/90-16 on 900709-13.No Violations Identified ML20059A7161990-08-0808 August 1990 Provides Comments on 900105 Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance. Util Should Provide Description of Methodology for Periodic Verification of motor-operated Valve Switch Settings ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20058M0531990-08-0202 August 1990 Forwards Safety Insp Rept 50-440/90-17 on 900709-13.No Violations Noted.Mobile Lab Located at Site During Insp to Perform Independent Measurements of Radioactivity ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20055J2761990-07-24024 July 1990 Confirms 900731 Meeting in Region III Ofc to Discuss Util Response to Violation Re Instrumented Insp Techniques ML20055G6561990-07-20020 July 1990 Forwards Safety Insp Rept 50-440/90-04 on 900305-0702.No Violations Noted ML20055J1381990-07-20020 July 1990 Recommends That Util Wait Until Generic Effort on NUMARC Proposal Completed Re Emergency Action Level Scheme Before Initiating Changes ML20055G6621990-07-20020 July 1990 Forwards Safety Insp Rept 50-346/90-10 on 900430-0518.No Violations Noted ML20055G3831990-07-17017 July 1990 Forwards Safety Insp Rept 50-441/90-01 on 900625-28.No Violations Noted ML20055G4061990-07-17017 July 1990 Forwards Safeguards Insp Rept 50-440/90-11 on 900611-19.No Violations Noted ML20055G3051990-07-13013 July 1990 Confirms 900718 Tour of Plant & Mgt Meeting to Discuss Sixth Refueling Outage & Other Items of Mutual Interest ML20055G3141990-07-11011 July 1990 Confirms 900717 Meeting to Discuss Current Plant Monthly Performance Indicators,Offgas Sys Corrective Actions Status,Tech Spec Changes & Refueling Outage 2 Planning ML20055F2231990-07-0606 July 1990 Ack Receipt of Containing Scope & Objectives for 1990 Emergency Plan Exercise Scheduled on 900919 ML20055D3181990-06-29029 June 1990 Advises of Safety & Performance Improvement Program Implementation Audit Scheduled for Wk of 900716-20.Selected Samples of Technical Recommendations Encl ML20055D9781990-06-29029 June 1990 Advises That 900614 Changes to QA Program Meet 10CFR50,App B Requirements & Acceptable.Nrc Should Be Notified of Changes to QA Commitments Existing in Docketed Correspondence Outside QA Program Description ML20055E0291990-06-29029 June 1990 Forwards Safety Insp Rept 50-440/90-08 on 900416-0611.No Notice of Violation Will Be Issued for Violations Noted Because NRC Wants to Encourage & Support Licensee Initiatives for self-identification ML20059M8631990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20059M8651990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20248G2851989-09-29029 September 1989 Forwards Safety Insp Rept 50-440/89-25 on 890829-0901.No Violations Noted ML20248D8211989-09-29029 September 1989 Forwards Safety Evaluation Accepting Util 890228 & 0630 Proposed plant-specific Designs to Comply w/10CFR50.62 ATWS Rule Requirements.Proposed Date of May 1990 for Implementing ATWS Mods Also Acceptable ML20248C5691989-09-27027 September 1989 Forwards Amend 6 to Indemnity Agreement B-79,reflecting Changes in 10CFR140, Financial Protection Requirements & Indemnity Agreements, Effective 890701 ML20248A4711989-09-25025 September 1989 Requests Submission of Update Rept or Replacement Pages to Updated FSAR Submitted on 890721 to Appropriate Regional Ofc,Per 10CFR50.4(b)(6).Review of Updated QA Program Description,Section 17.2 Will Require More than 60 Days ML20248D3081989-09-25025 September 1989 Forwards Amend 3 to Indemnity Agreement B-98,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements & Price-Anderson Amends Act of 1988, for Signature ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G3921999-06-0808 June 1999 Forwards Notice of Consideration of Approval of Transfer of License DPR-58 & Issuance of Conforming Amend & Opportunity for Hearing Re 990505 Application ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G0621999-06-0404 June 1999 Forwards Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513.Violations Identified & Licensee Being Provided Opportunity to Either Respond to Violations within 30 Days or Inform NRC That LER Rept Already Contain Info Requested ML20207B7341999-05-26026 May 1999 Forwards Correction of Typo in TS Table 3.3.6.1-1 for Plant, Unit 1 ML20207B8161999-05-25025 May 1999 Confirms Discussion Between Members of Staffs to Have Mgt Meeting on 990608 in Oak Harbor,Oh to Discuss Recent Performance at Davis-Besse as Described in Plant Performance Review ML20207B3141999-05-24024 May 1999 Informs That in September 1998,Region III Received Revision 20 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20207B1251999-05-20020 May 1999 Discusses Investigation Rept 3-98-007 on 981210 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 DD-99-08, Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 9905211999-05-20020 May 1999 Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 990521 ML20206T0881999-05-18018 May 1999 Confirms 990517 Telcon Between Lindsey & M Bielby Re Arrangements Made for Administration of Licensing Exam at Facility for Week of 990913 ML20206Q5181999-05-14014 May 1999 Responds to to SL Hiatt Re Fee Exemption Granted to Firstenergy Nuclear Operating Co,Operator of Perry Nuclear Plant.Action Consistent with Longstanding Policy & Practice,As Well as Legal Requirements IR 05000440/19980181999-05-14014 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-440/98-18 on 981110 ML20206S5381999-05-12012 May 1999 Forwards Insp Rept 50-440/99-07 on 990412-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observation of Activities in Progress ML20196F8081999-05-12012 May 1999 Partially Deleted Ltr Referring to Investigation Case 3-1998-007 Re Determination Whether Recipient Discriminated Against Radiation Protection Supervisor at Perry for Providing Testimony as Witness in DOL Hearing ML20206Q0171999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created 1999-09-09 |
Text
.
N Nh APR 0 S G87 fir. Lynn Firestone Senior Vice President Ohio Edison 76 Scuth 1:ain Street Akron, Ohio 44303
Dear fir. Firestone:
We have reviewed the financial infomation submitted for 1987 in your letter of F. arch 31, 1987 and conclude that it satisfies the requirements of Section 140.21 of 10 CFR Part 140 that each licenseo maintain an approved guarantee vf paynent of deferred prenfums for each operating reactor over 100 fM(e) that it owns in whole or in part.
, Sincerely, N
> $- /s/ Darael A. flash Darrel A. ?! ash, Section Leader Licensee Relations Section Office of State Prograns Distribution:
Subj: cash flow (Ohio Edison)
DCD-016 /
PDR LPDR OSP Dir r/f SLR r/f DNash IDinitz & r/f fh qA
- "'c=>
LR:0(P)' SLR:05P V w_,, TffiWit cT Df6shD)'" ~
v ,, ,
"4Tllh7'"'47 "ldi" NEC FORM 310 (10 80) NRCM 0240 OFFICIAL RECORD COPY