Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R381 + (04:42:19, 7 December 2024)
- ML20206R379 + (04:42:20, 7 December 2024)
- ML20206R378 + (04:42:20, 7 December 2024)
- ML20206R375 + (04:42:21, 7 December 2024)
- ML20206R376 + (04:42:21, 7 December 2024)
- ML20206R374 + (04:42:22, 7 December 2024)
- IR 05000341/1986027 + (04:42:26, 7 December 2024)
- ML20206R372 + (04:42:27, 7 December 2024)
- 05000220/LER-1986-024, :on 860803,turbine Trip & Subsequent Scram Occurred.Caused by Increase in Reactor Water Level.Hpci Mode of Feedwater Reset,Reactor Water Level Restored & Instrument & Control Personnel Notified to Remove Signal + (04:42:28, 7 December 2024)
- ML20206R370 + (04:42:30, 7 December 2024)
- ML20206R368 + (04:42:31, 7 December 2024)
- ML20206R369 + (04:42:31, 7 December 2024)
- ML20206R366 + (04:42:32, 7 December 2024)
- ML20206R365 + (04:42:33, 7 December 2024)
- ML20206R364 + (04:42:33, 7 December 2024)
- ML20206R363 + (04:42:34, 7 December 2024)
- ML20206R359 + (04:42:34, 7 December 2024)
- U-600628, Comments on Draft License NPF-55,transmitted w/860618 Ltr. Util Requested Deferral of Traversing in-core Probe Sys Preoperational Testing Prior to Exceeding 5% of Rated Reactor Power, Not Prior to Reactor Heatup + (04:42:35, 7 December 2024)
- ST-HL-AE-2087, Forwards Annotated Rev to FSAR Section 11.5.4.Rev Clarifies That Waste Processing Sys Monitor 1 Provides Automatic Isolation.Change Will Be Incorporated in Future FSAR Amend + (04:42:36, 7 December 2024)
- ML20206R351 + (04:42:37, 7 December 2024)
- ML20206R349 + (04:42:38, 7 December 2024)
- ML20206R348 + (04:42:39, 7 December 2024)
- ML20206R346 + (04:42:39, 7 December 2024)
- TXX-4887, Forwards Description of 860630 Amend 58 to FSAR Changes, Consisting of Summary of Emergency Plan,Rev 9 Changes + (04:42:40, 7 December 2024)
- ML20206R342 + (04:44:47, 7 December 2024)
- ML20206R343 + (04:44:47, 7 December 2024)
- IR 05000029/1999001 + (04:44:53, 7 December 2024)
- ML20206R340 + (04:44:53, 7 December 2024)
- ML20206R339 + (04:44:54, 7 December 2024)
- 05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With + (04:44:56, 7 December 2024)
- ML20206R334 + (04:44:57, 7 December 2024)
- ML20206R333 + (04:44:58, 7 December 2024)
- ML20206R332 + (04:44:59, 7 December 2024)
- ML20206R330 + (04:45:00, 7 December 2024)
- ML20206R325 + (04:45:01, 7 December 2024)
- ML20206R324 + (04:45:01, 7 December 2024)
- ML20206R323 + (04:45:02, 7 December 2024)
- ML20206R322 + (04:45:02, 7 December 2024)
- ML20206R321 + (04:45:03, 7 December 2024)
- ML20206R319 + (04:45:03, 7 December 2024)
- ML20206R317 + (04:45:04, 7 December 2024)
- ML20206R315 + (04:45:05, 7 December 2024)
- ML20206R313 + (04:45:06, 7 December 2024)
- ML20206R309 + (04:45:07, 7 December 2024)
- PNO-III-97-087, on 971017,util Announced That O Kingsley Has Been Selected as President & Chief Nuclear Officer of Nuclear Generation Group + (04:45:08, 7 December 2024)
- ML20206R306 + (04:45:09, 7 December 2024)
- ML20206R305 + (04:45:09, 7 December 2024)
- ML20206R303 + (04:45:10, 7 December 2024)
- PNO-III-97-085, on 971009,licensee Identified Gas While Venting Unit 1 Safety Injection Sys Discharge Piping During Monthly Venting Surveillance Test.On 971010,unit 2 Reactor Tripped as Result of Degraded Voltage on Power Supply + (04:45:10, 7 December 2024)
- PNO-III-97-084, on 971010,licensee Received Empty Container from Hosp Customer Which Had Radioactive Contamination in Excess of DOT Limits on External Surface of Container. Incident Under Review + (04:45:11, 7 December 2024)
- ML20206R301 + (04:45:11, 7 December 2024)
- IR 05000456/1986028 + (04:45:17, 7 December 2024)