UNIT 1 OPERATING DATA REPORT oc**************************************************************************
l Docket No. 50-317 April 8, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD FEBRUARY 1987 (Rev 1) 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 4
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date l
- 11. HOURS IN REPORTING PERIOD 672 1,416 103,549
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 658.4
_1,292.0 81,063.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 638.9 1,008.0 79,223.9
- 15. UNIT RESERVE SHUTDOWN HOURS.
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,687,286 2,585,563 198,115,958
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 571,974 873,166 65,563,159 i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 547,644 824,866 62,571,964
- 19. UNIT SERVICE FACTOR 95.1 71.2 76.5
- 20. UNIT AVAILABILITY FACTOR 95.1 71.2 76.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 70.6 73.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.4 68.9 71.5
- 23. UNIT FORCED OUTAGE RATE 3.0 9.7 8.6
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None i
8704220144 870407 PDR ADOCK 05000317 R
SUMMARY
OF UNIT 1 OPERATING 'i't?ERIENCE f
January 1987 1/1 The Unit began this reporting period shutdown for refueling.-
1/3 At 0206, the Reactor became critical, but was not 4
paralleled because secondary side work was still in 1-progress.
1/7 At 1015, the Reactor was shutdown so Reactor Coolant Pump balancing could be performed while repairing #1 Main Turbine Bearing.
1/9 At 1118, the Reactor was critical.
I 1/12 At 2220, the Unit was paralleled.
Power operation had l
been delayed while inspecting the Main Turbine Thrust Bearing.
I 1/13 At 0120, the Unit was held at 30% reactor power for i
i chemistry.
At 1645, power was increased to 60% to perform l
PSTP-3.
1/15 At 1045, power was increased to 97% to complete PSTP-3.
j 1/20 At 1240, the Unit was at full reactor power (860 MWe).
1/27 At 1809, the Unit was manually tripped because of a loss of instrument air.
1/28 At 0518, the Reactor was critical.
1/31 At 1050, the Unit was paralleled.
Power operation had
]
been delayed because of repairs to the Condensate Booster j
Pumps.
1/31 The Unit ended this reporting period at 50% reactor power (430 MWe).
i i
i l
= -
s
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE February 1987 2/1 The Unit began this reporting period at 50% reactor power (430 MWe).
The Unit was limited to 50% power because only one Condensate Booster Pump- (CBP) was in service.
2/1 At 0035, the Unit tripped on Stator Cooling Runback because stator liquid pressure went below the setpoint during a hydrogen purifying operation.
At 1410, the Reactor was critical and at 1945, the Unit was paralleled.
2/2 At 0415, two CBPs were in service and the Unit was at full reactor power (860 MWe).
2/7 At 2013, the Unit began reducing power to repair an oil leak on #3 Intercept Valve.
At 2252, the Unit was removed from the grid.
2/8 At 1245, the Unit was paralleled.
Shutting the breaker was delayed because of a ground on 11 AC vital bus.
At 2200, the Unit was at full reactor power (860 MWe).
2/18 At 2045, Unit 1 power was reduced to 700 MWe for repairs to 12 Heater Drain Tank Normal Level Control Valve.
2/19 At 0340, repairs to the valve were complete, and at 0512, the Unit was at full reactor power (860 MWe).
2/28 The Unit ended this reporting period at full reactor power (860 MWe).