Rev 1 to Monthly Operating Rept for Feb 1987
ML20206R317
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/28/1987
From: Behnke C
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20206R141 List:
References
NUDOCS 8704220144
Download: ML20206R317 (3)


Text

\\

'I i

ce**************************************************************************

UNIT 1 OPERATING DATA REPORT oc**************************************************************************

l Docket No. 50-317 April 8, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD FEBRUARY 1987 (Rev 1) 3.

LICENSED THERMAL POWER (MWT) 2700

4. NAMEPLATE RATING (GROSS MWe) 918 4
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.

CHANGE IN CAPACITY RATINGS none

9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date l
11. HOURS IN REPORTING PERIOD 672 1,416 103,549
12. NUMBER OF HOURS REACTOR WAS CRITICAL 658.4

_1,292.0 81,063.7

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 638.9 1,008.0 79,223.9
15. UNIT RESERVE SHUTDOWN HOURS.

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,687,286 2,585,563 198,115,958
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 571,974 873,166 65,563,159 i
18. NET ELECTRICAL ENERGY GENERATED (MWH) 547,644 824,866 62,571,964
19. UNIT SERVICE FACTOR 95.1 71.2 76.5
20. UNIT AVAILABILITY FACTOR 95.1 71.2 76.5
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 70.6 73.5
22. UNIT CAPACITY FACTOR (USING DER NET) 96.4 68.9 71.5
23. UNIT FORCED OUTAGE RATE 3.0 9.7 8.6
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

None i

8704220144 870407 PDR ADOCK 05000317 R

PDR

SUMMARY

OF UNIT 1 OPERATING 'i't?ERIENCE f

January 1987 1/1 The Unit began this reporting period shutdown for refueling.-

1/3 At 0206, the Reactor became critical, but was not 4

paralleled because secondary side work was still in 1-progress.

1/7 At 1015, the Reactor was shutdown so Reactor Coolant Pump balancing could be performed while repairing #1 Main Turbine Bearing.

1/9 At 1118, the Reactor was critical.

I 1/12 At 2220, the Unit was paralleled.

Power operation had l

been delayed while inspecting the Main Turbine Thrust Bearing.

I 1/13 At 0120, the Unit was held at 30% reactor power for i

i chemistry.

At 1645, power was increased to 60% to perform l

PSTP-3.

1/15 At 1045, power was increased to 97% to complete PSTP-3.

j 1/20 At 1240, the Unit was at full reactor power (860 MWe).

1/27 At 1809, the Unit was manually tripped because of a loss of instrument air.

1/28 At 0518, the Reactor was critical.

1/31 At 1050, the Unit was paralleled.

Power operation had

]

been delayed because of repairs to the Condensate Booster j

Pumps.

1/31 The Unit ended this reporting period at 50% reactor power (430 MWe).

i i

i l

= -

s

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE February 1987 2/1 The Unit began this reporting period at 50% reactor power (430 MWe).

The Unit was limited to 50% power because only one Condensate Booster Pump- (CBP) was in service.

2/1 At 0035, the Unit tripped on Stator Cooling Runback because stator liquid pressure went below the setpoint during a hydrogen purifying operation.

At 1410, the Reactor was critical and at 1945, the Unit was paralleled.

2/2 At 0415, two CBPs were in service and the Unit was at full reactor power (860 MWe).

2/7 At 2013, the Unit began reducing power to repair an oil leak on #3 Intercept Valve.

At 2252, the Unit was removed from the grid.

2/8 At 1245, the Unit was paralleled.

Shutting the breaker was delayed because of a ground on 11 AC vital bus.

At 2200, the Unit was at full reactor power (860 MWe).

2/18 At 2045, Unit 1 power was reduced to 700 MWe for repairs to 12 Heater Drain Tank Normal Level Control Valve.

2/19 At 0340, repairs to the valve were complete, and at 0512, the Unit was at full reactor power (860 MWe).

2/28 The Unit ended this reporting period at full reactor power (860 MWe).