Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R790 + (04:38:31, 7 December 2024)
- NLS8600297, Application for Amend to License DPR-46,consisting of Proposed Change 29,revising Tech Specs to Incorporate Cycle 11 Reload + (04:38:32, 7 December 2024)
- ML20206R788 + (04:38:33, 7 December 2024)
- BSEP-99-0080, Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval + (04:38:34, 7 December 2024)
- ML20206R785 + (04:38:34, 7 December 2024)
- ML20206R784 + (04:38:35, 7 December 2024)
- ML20206R781 + (04:38:36, 7 December 2024)
- 05000261/LER-1987-002-03, :on 870318,while Subcritical,Reactor Tripped & Reactor Protection Sys Received Spurious P-7 Permissive Signal Actuating Shutdown Banks.Cause of Voltage Spike Not Determined.Reactor Returned to Power + (04:38:38, 7 December 2024)
- ML20206R779 + (04:38:40, 7 December 2024)
- ML20206R778 + (04:38:40, 7 December 2024)
- ML20206R777 + (04:38:41, 7 December 2024)
- ML20206R776 + (04:38:42, 7 December 2024)
- ML20206R773 + (04:38:42, 7 December 2024)
- TXX-4883, Interim Deficiency Rept CP-85-31 Re Impact of Addl Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Ebasco Consolidated All Raceway Items Under Scope of Single Program.Next Rept by 861021 + (04:38:43, 7 December 2024)
- ML20206R769 + (04:38:44, 7 December 2024)
- ML20206R766 + (04:38:45, 7 December 2024)
- 05000312/LER-1987-021, :on 861121,pressurizer Heater Bundles Damaged Following Heater Breaker Trips.Caused by Energization of Heaters W/O Adequate Water Level & Inadequate Administrative Controls.Root Cause Investigation 86-34 Issued + (04:38:46, 7 December 2024)
- PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3 + (04:38:47, 7 December 2024)
- ML20206R763 + (04:38:48, 7 December 2024)
- ML20206R760 + (04:38:49, 7 December 2024)
- ML20206R762 + (04:38:49, 7 December 2024)
- 05000382/LER-1987-010, :on 870318,discovered That Retest of Pressurizer Surge Line PSL-203 Sample Header Inside Containment Isolation Valve Not Performed.Caused by Failure to Comply W/Mgt Controls & Procedures + (04:38:51, 7 December 2024)
- ML20206R758 + (04:38:52, 7 December 2024)
- ML20206R756 + (04:38:54, 7 December 2024)
- 05000327/LER-1987-020, :on 840518,nonconformance Rept Written Describing Condition Where Class 1E Electrical Components Found Unprotected Against Potential Water Spray from Failure of Piping.Caused by Inadequate Design + (04:38:56, 7 December 2024)
- ML20206R749 + (04:38:59, 7 December 2024)
- ML20206R748 + (04:39:00, 7 December 2024)
- ML20206R747 + (04:39:00, 7 December 2024)
- PNO-I-98-013, on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated + (04:39:01, 7 December 2024)
- PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting + (04:39:02, 7 December 2024)
- ML20206R744 + (04:39:02, 7 December 2024)
- IR 05000139/1986001 + (04:39:03, 7 December 2024)
- ML20206R739 + (04:39:03, 7 December 2024)
- PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead + (04:39:04, 7 December 2024)
- BECO-86-139, Forwards Revs 4,5 & 6 to Emergency Plan,For Info.Rev 5 Complete Reissue of Plan + (04:39:08, 7 December 2024)
- SNRC-1332, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Containment (App J) Pressure Isolation Valves (Pivs). Tech Spec 4.4.3.2.2 Requires Periodic Leak Testing of All PIVs + (04:39:08, 7 December 2024)
- ML20206R734 + (04:39:09, 7 December 2024)
- ML20206R733 + (04:39:10, 7 December 2024)
- 05000456/LER-1987-019, :on 870319,shiftly Check of Pressurizer Pressure Channels Not Performed.Caused by Procedural Error. Temporary Procedure Change 1194 Incorporated,Indicating That Pressurizer Pressure Channels Must Be Checked + (04:39:11, 7 December 2024)
- ML20206R730 + (04:39:12, 7 December 2024)
- ML20206R726 + (04:39:13, 7 December 2024)
- ML20206R729 + (04:39:13, 7 December 2024)
- ML20206R724 + (04:39:14, 7 December 2024)
- ML20206R722 + (04:39:15, 7 December 2024)
- PNO-III-98-002, on 980105,util Announced Selection of PECO Energy Co to Provide Mgt Services for Station.Peco Energy Will Provide Six to Eight Managers to Fill Key Positions + (04:39:15, 7 December 2024)
- ML20206R721 + (04:39:16, 7 December 2024)
- ST-HL-AE-2043, Forwards Revs to FSAR Tables 3.2.A-1 & 3.2.B-1 Re Quality Classification of Structures,Sys & Components.Revs Result of General Update for Consistency W/Project Design Documents & Include Editorial Changes + (04:39:17, 7 December 2024)
- ML20206R717 + (04:39:18, 7 December 2024)
- ML20206R718 + (04:39:18, 7 December 2024)
- ML20206R714 + (04:39:19, 7 December 2024)
- ML20206R716 + (04:39:19, 7 December 2024)
- PNO-III-98-003, on 971217,male Patient Had I-125 Seeds Permanently Implanted in Prostate Gland with Prescribed Dose of 160 Gy.Of 88 Seeds Implanted Only 49 Seeds Were Actually retained,39 Seeds Ended Up in Bladder & Were Recovered + (04:39:20, 7 December 2024)