Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000344/1988013 + (03:21:34, 7 December 2024)
- PNO-IV-88-060, on 880728,licensee Tripped Reactor from 100% Power as Part of Planned 100% Power Plateau Initial Startup Test Program.Preliminary Results Satisfactory.Unit Will Remain in Hot Shutdown for Repairs + (03:21:35, 7 December 2024)
- ML20207C133 + (03:21:36, 7 December 2024)
- ML20207C134 + (03:21:36, 7 December 2024)
- ML20207C129 + (03:21:37, 7 December 2024)
- ML20207C122 + (03:21:38, 7 December 2024)
- ML20207C120 + (03:21:40, 7 December 2024)
- ML20207C119 + (03:21:41, 7 December 2024)
- ML20207C116 + (03:21:42, 7 December 2024)
- IR 05000354/1988012 + (03:23:41, 7 December 2024)
- ML20207C112 + (03:23:41, 7 December 2024)
- ML20207C110 + (03:23:42, 7 December 2024)
- ML20207C109 + (03:23:43, 7 December 2024)
- ML20207C102 + (03:23:44, 7 December 2024)
- ML20207C101 + (03:23:44, 7 December 2024)
- ML20207C098 + (03:23:45, 7 December 2024)
- ML20207C099 + (03:23:45, 7 December 2024)
- ML20207C097 + (03:23:46, 7 December 2024)
- ML20207C094 + (03:23:47, 7 December 2024)
- ML20207C093 + (03:23:48, 7 December 2024)
- ML20207C092 + (03:23:49, 7 December 2024)
- ML20207C091 + (03:23:50, 7 December 2024)
- ML20207C089 + (03:23:50, 7 December 2024)
- ML20207C085 + (03:23:51, 7 December 2024)
- ML20207C088 + (03:23:51, 7 December 2024)
- ML20207C083 + (03:23:52, 7 December 2024)
- ML20207C078 + (03:23:53, 7 December 2024)
- ML20207C080 + (03:23:53, 7 December 2024)
- ML20207C072 + (03:23:54, 7 December 2024)
- ML20207C074 + (03:23:54, 7 December 2024)
- ML20207C070 + (03:23:55, 7 December 2024)
- ML20207C069 + (03:23:56, 7 December 2024)
- ML20207C068 + (03:23:56, 7 December 2024)
- CEO-88-024, Supplemental Application for Amend to License DPR-54, Consisting of Rev 1 to Proposed Amend 102,deleting App B of Tech Specs + (03:23:57, 7 December 2024)
- ML20207C066 + (03:23:58, 7 December 2024)
- ML20207C063 + (03:23:58, 7 December 2024)
- ML20207C062 + (03:23:59, 7 December 2024)
- ML20207C058 + (03:24:00, 7 December 2024)
- ML20207C061 + (03:24:00, 7 December 2024)
- ML20207C057 + (03:24:02, 7 December 2024)
- ML20207C055 + (03:24:02, 7 December 2024)
- 2CAN029913, Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation + (03:24:03, 7 December 2024)
- ML20207C053 + (03:24:03, 7 December 2024)
- 05000352/LER-1988-025, :on 880627,reactor Encl Isolation Occurred While Performing Surveillance Test.Caused by Instrument Isolation Valve Being Partially Closed During Surveillance. Reactor Encl Isolation Reset Per Procedure + (03:24:05, 7 December 2024)
- ML20207C051 + (03:24:06, 7 December 2024)
- ML20207C050 + (03:24:07, 7 December 2024)
- ML20207C048 + (03:24:07, 7 December 2024)
- 05000277/LER-1988-015-01, :on 880628,continuous Firewatch in Cable Spreading Room Left Post Unattended for Approx 20 Minutes in Violation of Tech Spec 3.14.B.4.a.Caused by Personnel Error. Firewatch Reestablished + (03:24:09, 7 December 2024)
- ML20207C046 + (03:24:10, 7 December 2024)
- ML20207C043 + (03:24:11, 7 December 2024)
- 05000455/LER-1988-069, :on 880615,diesel Generator Inoperable Due to Voltage Control Problems.Caused by a Failed Relay on pre-position Card in Voltage Control Circuit.Relay Replaced. Operability Surveillance Performed + (03:24:12, 7 December 2024)
- ML20207C041 + (03:24:13, 7 December 2024)