Browse wiki

Jump to navigation Jump to search
ML20207C058  +
December 10, 1986  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
December 23, 1986  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
03:24:00, 7 December 2024  +
PNO-III-86-149, on 861217,seal on motor-driven Feedwater Pump Failed While Pump Was Being Started,Causing Leak of About 200 Gallons Per Minute.Water Was Drained to Radwaste Water Treatment Sys +, PNO-III-86-150, on 861218,licensee Entered Mode 4 from Mode 3 to Investigate 861215 Failure of MSIV to Close Per Tech Specs.Leak in Pressurizer Level Sensing Line Isolation Valve Will Be Repaired.Investigation Continuing +, PNO-III-86-151, on 861218,during Mode 3,loss of Water & Drop in Pressure Noticed in Accumulator 2D.Caused by Crack in 1-inch Line Used in Filling Accumulator.Cause of Crack Still Unknown.Unit Currently in Mode 4 Pending Repairs +, PNO-III-86-148, on 861217,guns,knives,ammunition & Marijuana Found in Possession of Truck Driver Seeking Entrance to Protected Area.Driver Denied Access & Arrested by State Police.Driver Involved W/Paramilitary Organization for Hire +, PNO-III-86-144A, on 861212,Sixth Circuit Court of Appeals in Cincinnati Denied State of Ohio Request to Stay Commission 861121 Decision Authorizing Restart of Davis-Besse.Licensee Expects Startup of Reactor During Wk of 971214 +, PNO-III-86-147, during Routine Insp,Inspectors Determined That Univ Personnel Instead of Licensed Technicians Repaired & Maintained Components of Co-60 Teletherapy Units.On 860412,therapeutic Timer Stopped During Treatment +, PNO-III-86-146, on 861212 Unidentified Male Telephoned Bangor,Michigan,Fire Dept & South Haven Tribune Newspaper Threatening to Randomly Shoot at Plant.Law Enforcement Armed Personnel Positioned on Site.No Gunfire Reported +  and PNO-III-86-145, on 861021,patient Given 1,530 Uci I-131 & Whole Body Scan Instead of 50-60 Uci I-131.Caused by Technician Misunderstanding Requisition.Region Will Inspect Hosp Prescription Procedure +
28  +
AM +  and ST-SG-03 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
December 23, 1986  +
Weekly Info Rept for Wk Ending 861219  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.