ML20207C068

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Item 2.1,Parts 1 & 2 Re Equipment Classification for Reactor Trip Sys (RTS) Components & RTS Vendor Interface,Respectively.Action on Item 2.1 Complete
ML20207C068
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/22/1986
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20207C073 List:
References
GL-83-28, NUDOCS 8612300045
Download: ML20207C068 (2)


Text

.

2 DEC 1996 Docket No.:

50-483 2

Mr. Donald F. Schnell Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166

Dear Mr. Schnell:

Subject:

Callaway - Generic Letter 83-28, Item 2.1 (Part 1 and Part 2)

The staff has completed its review of equipment classification and vendor interface for the Callaway reactor trip system, Generic Letter 83-28, Item 2.1 (Part I and Part 2). The staff finds that these subparts of Item 2.1 are acceptable for Callaway.

This completes the staff actions for Item 2.1 of Generic Letter 83-28. A copy of the related safety evaluation is enclosed.

Sincerely, Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page Distribution:

IDocket-File 1 NRC PDR"

~

Local PDR PRC System PWR#4 Rdg MDuncan P0'Connor ACRS (gblood BJYoun 10)

OGC/Bethesda JPartlow BGrimes EJordan NThompson PWR#4/DPWR-A PWRe4/DPWR-A P0'Connor/mac BoYoungblood 12/ 4 /86 12/ W 86 8612300045 861222 PDR ADOCK 05000483 P

PDR _

9

' Mr D. F. Schnell Callaway Plant Union Electric Company Unit No. I cc:

Mr. Nicholas A. Petrick Lewis C. Green Esq.

Executive Director - SNUPPS Green, Hennings & Henry 5 Choke Cherry Road Attorney for Joint Intervenors Rockville, Maryland 20850 314 N. Broadway, Suite 1830 St. Louis, Missouri 65251 Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Ms. Marjorie Reilly Shaw, Pittman, Fotts & Trowbridge Energy Chairman of the League of 2300 N Street, N. W.

Women Voters of Univ. City, M0 Washington, D. C.

20037 7065 Pershing Avenue University City, Missouri 63130 Mr. J. E. Birk Assistant to the General Counsel Mr. Donald Bollinger, Member Union Electric Company Missourians for Safe Energy Post Office Box 149 6267 Delmar Boulevard St. Louis, Missouri 63166 University City, Missouri 63130 U. S. Nuclear Regulatory Conmission Mr. Dan I. Bolef, President Resident Inspectors Office Kay Drey, Representative RR#1 Board of Directors Coalition Steedman, Missouri 65077 for the Environment St. Louis Region Mr. Donald W. Capone, Manager 6267 Delmar Boulevard Nuclear Engineering University City, Missouri t3130 Union Electric Company Post Offica Box 149 St. Louis, Missouri 63166 Chris R. Rogers, P.E.

Manager - Electric Departrent 301 U. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator U. S. hRC, Region III 799 Roosevelt Rood Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P. O. Box 176 Jefferson City, Missouri 65102 Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas ard Electric Company 201 North Parket Street Post Office Sox 208 Wi*chita, l2r.sas 67201

--