Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207C742 + (03:16:31, 7 December 2024)
- ML20207C741 + (03:16:31, 7 December 2024)
- ML20207C738 + (03:16:32, 7 December 2024)
- ML20207C737 + (03:16:33, 7 December 2024)
- ML20207C736 + (03:16:34, 7 December 2024)
- ML20207C735 + (03:16:34, 7 December 2024)
- ML20207C734 + (03:16:35, 7 December 2024)
- ML20207C732 + (03:16:36, 7 December 2024)
- ST-HL-AE-1846, Forwards Annotated Revs to FSAR Section 9.5.4.3 & Figure 9.5.4-1 Re Standby Diesel Generator Fuel Oil Storage Tank Emergency Fill Connection,In Response to NRC Question 430.44N + (03:16:37, 7 December 2024)
- ML20207C726 + (03:16:38, 7 December 2024)
- ML20207C724 + (03:16:39, 7 December 2024)
- ML20207C725 + (03:16:39, 7 December 2024)
- ML20207C722 + (03:16:45, 7 December 2024)
- 05000387/LER-1986-029, :on 860816,initiations of Standby Gas Treatment & Control Room Emergency Outside Air Supply Sys B Occurred.Caused by Defective GE Electrical Protection Assembly Board (Epa).Board Replaced + (03:16:47, 7 December 2024)
- ML20207C716 + (03:16:48, 7 December 2024)
- 05000456/LER-1986-003-09, :on 861121,hard Rubber Fire Hoses Declared Inoperable Due to Lack of Valid,Current Hydrostatic Test. Caused by Hose Failure Due to Improper Coupling for Intended Use.Hoses Replaced.Personnel Counseled + (03:16:50, 7 December 2024)
- ML20207C712 + (03:16:51, 7 December 2024)
- ML20207C710 + (03:16:53, 7 December 2024)
- ML20207C709 + (03:16:53, 7 December 2024)
- ML20207C707 + (03:16:54, 7 December 2024)
- ML20207C705 + (03:16:55, 7 December 2024)
- ML20207C703 + (03:16:56, 7 December 2024)
- ML20207C702 + (03:16:56, 7 December 2024)
- ML20207C700 + (03:16:57, 7 December 2024)
- ML20207C701 + (03:16:57, 7 December 2024)
- VPN-010-99, 1998 Annual Rept for Trojan Nuclear Plant. with + (03:16:58, 7 December 2024)
- ML20207C697 + (03:17:01, 7 December 2024)
- ML20207C696 + (03:17:01, 7 December 2024)
- ML20207C694 + (03:17:02, 7 December 2024)
- ML20207C695 + (03:17:02, 7 December 2024)
- ML20207C693 + (03:17:03, 7 December 2024)
- ML20207C689 + (03:17:04, 7 December 2024)
- ML20207C692 + (03:17:04, 7 December 2024)
- ML20207C685 + (03:17:05, 7 December 2024)
- 05000328/LER-1986-009-04, :on 861201,control Room Isolation Occurred While Testing Handswitches.Caused by Deficient Workplan & Personnel Error.Personnel Counseled to Ensure All Instructions in Procedures & Workplan Complete + (03:17:07, 7 December 2024)
- ML20207C682 + (03:17:08, 7 December 2024)
- ML20207C680 + (03:17:09, 7 December 2024)
- ML20207C681 + (03:17:09, 7 December 2024)
- ML20207C679 + (03:17:10, 7 December 2024)
- 05000269/LER-1986-014-04, :on 861117,failure to Leak Test 100 Uci Cs-137 Source ONS-64 Since 761027 Discovered.Caused by Incorrect Transfer of Info Between Log Books.Leak Test Performed + (03:17:12, 7 December 2024)
- ML20207C674 + (03:17:13, 7 December 2024)
- ML20207C670 + (03:17:14, 7 December 2024)
- ML20207C668 + (03:17:14, 7 December 2024)
- TXX-6179, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported on 840604.Affected Cables & Functions Identified.Next Rept to Be Submitted by 870410 + (03:17:15, 7 December 2024)
- ML20207C662 + (03:17:16, 7 December 2024)
- ML20207C660 + (03:17:17, 7 December 2024)
- ML20207C661 + (03:17:17, 7 December 2024)
- ML20207C658 + (03:17:18, 7 December 2024)
- ML20207C656 + (03:17:19, 7 December 2024)
- ML20207C655 + (03:17:20, 7 December 2024)
- ML20207C654 + (03:17:21, 7 December 2024)
- ML20207C652 + (03:17:21, 7 December 2024)