| Site: | Wolf Creek |
| Issue date: | 07/29/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20207C713 | List: |
| References | |
| NUDOCS 8808100116 | |
| Download: ML20207C709 (2) | |
See also: IR 05000482/1988019
Text
a
-
_
._
_
- ,'
-
,
.
,
'
..
.R 29'm
10 Reply Refer To:
Docket: STN 50-482/88-19
Wolf Creek Nuclear Ope.'ating . Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P. O. Box 411
Burlingten, Kansas 66839
Gentlemen:
This refers to the inspection conducted by Messrs. B. L. Bartlett and
M. E. Skow of this office during the period May 15 through June 30, 1988, of
activities abthorized by NRC Operating License No. NPF-42 for the Wolf Creek
Generating Station, and to the discussion of our findings with Mr. G. D. Boyer
and other members of ycur staff at the~ conclusion of the inspection.
Areas examined during the inspection included plant status, allegation
followup, 10 CFR Part 21 report followup, licensee event report followup,
operational safety verification, monthly surveillance observation, monthly
maintenance observation, onsite event folicwup, startup testing after
refueling, radiological protection, and physical security verification. Within
these areas, the inspection consisted of selective examination of procedures
and representativa records, interviews with personnel, and observations by the
NRC inspectors. Thc inspection findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
One unresolved item is identified in paragraph 5.c of the enclosed report.
The resporte directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of IS60, PL 96-511.
RIV:/RI
M
C:DRP/A h
ACd'
0:DR b
MESkow a
BLBartletth
DDChamberlainf
MEEmerson
LJCallan
7/1(/88
7 /M/88
7 /10/88
1/97/8G
7/75/88
l
8908100116 880729
%{
'
FDR
ADOCK 05000482
<
'
G
PNV
H Cl
-
._
..
.-
_
.
_
_.
. _ .
..
_
_
____
_
-
'
<
-
.
,
,
.
Wolf Creek Nuclear Operating
2-
Corporation
l
Should you have any questions concerning.this inspection, we will be pleased to
discuss them with you.
. Sincerely,
/s
L. J. Callan, Director
.
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of. Violation
2.
Appendix B - NRC Inspection Report
50-482/88-19
cc w/ enclosures:
Otto L. Maynard, Manager of Licensing
Wolf Creek Nuclear Operating Corporation
P. 0. Boa 411
Burlington, Kansas 66839
Gary Boyer, Plant Manager
Wolf Creek Nuclear Operating Corporation
P. O. Box 411
Burlington, Kansas 66839
Mr. Robe-t D. Elliott, Chief Engineer
Kansas Corporation Commission
Fourth Floor, Docking State Office Bldg.
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
l
bectoDMB(IE01)
j
bc'
'strib, by RIV:
- r
Myron Karman, ELD, MNBB (1)
- Rr
R. D. Martin, RA
- S.
wf,(PS/A)
'
"RS J-unod
J. M. Hinds, RIIJ
- RIV File
Callaway RRI, Rill
- Project Engineer, DRP/A
- MIS System
- A. B. Beach
- RSTS Operator
- L. Shea, RM/ALF
M. Emerson (4)
- w/766
,
,-
.
-
__
-
~ - - . . . -
.
.
. .
-
. _ , - - _ _ .
. -
. , - . , . - .