.. _ _.
l DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 5/12/86 i
I COMPLETw BI I),
B, P./. ATTE TELEPHONE 314/676-8 M0 PART A OPERATIONS
SUMMARY
Completed Refueling Operations (Refueling #1) - 3/25/86 Commence restart and power operation - 4/18/86 Plant reached 100% - 4/28/86 l
l l
PART B PORV AND SAFETY VALVE
SUMMARY
i April 5, 1986 - lifted RCS PORV.
PORV lifted due to pressure transient caused by excessive flow through BG-HV-8357A entering RCS through RCS Coolant Pump seals.
(Mode 5.
The Technical Specification pressure limit was not exceeded.
Special Report 86-03.)
I CA-#804 O (C10 83 04/10/85 R
pop QDP-ZZ-04204 4.n v i
I Page 1 of 4
'^'~~$.~^~~.~.T1
~. _,
.,--.L.-
'*~'*~'T,??~^
'?' '
M 'i ~
- ~ - -
~'
- e Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE 5/12/86 COMPLETED BY D. B. PRATTE TELEPHONE 314/676-8460 MONTH APRIL 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWWt)
(MWe Net) i 1
0 37 o
0 0
2 13 0
66 3
g 0
385 4
20 0
447 g
21 0
346 6
g
+
0 237 7
23 0
234 g
34 0
294 g
3 0
704 10 28 l
0 773 11 27 0
1036 12 3
0 1103 l
13 3
0 1096 14 3
0 15 g
16 l
Page 2 of 4 CA-#804 04/10/85 QDP-ZZ-04204 i
, _ _ ~,..., _..... _. _ _ _. _ _. _ _ _ _ _ _ _ _.. _. - _ _ _ _
}
I Part D
' OPERATING DATA REPORT 50-483 DOCKET NO.
(%11 - I UNIT 5/12/86 DATE D. B. PRATTE COMPLETED 8Y 314/676-8460 TELEPHONE OPERATING STATUS
( YTD CUM )
770 (2880 11942.5)
Anril 19R6 ORCss MOURe lN REPORTING PERICO:
- 1. REPORTING PERICO:
3411 MAX. OEPENO. CAPACITY (MWe Neti.
1170
- 2. CURRENTLY AUTHORIZEO POWER LEVEL (MWti:
- At stretch power level which is not currently \\
ll/L" DEsacN ELECTRICAL MATINo tMws.Neo:
3 authorized under the Oneratina License.
100%
- 3. POWER trv8LTO WMicM REsTRicTiO tip ANYnel:
- 4. REASONS POR RESTRICTION tlP ANYh TMis MONTH YR TO DATE CUMULATivt 356.3 1772.1 10235.6
- s. NuMeER OP hours REACTOR was cR TicAL 0
0 0
- s. REACTOR RESERVE sMUTOOWN MOURs..........
274.9 1688.4 9875.8
- 7. MOURs GENERATOR ON UNE..
0 0
0
- s. unit RESERVE sMuTOOwN MOuRs..
..., 558,152 5,164,895 31,182,411
- s. gross THERMAL ENERGY GENERATED (MWMi
,,, 175.169 1.751.194 10.565.117 to. Gross ELECTRICAL ENERGY GENERATED (MwMi.......,
............ 161,283 1,661.646 10.030.433
- 11. NET ELECTRICAL ENERGY GENERATEO IMWM) 49 5'r 61.57 M 7 'r
- 12. REACTOR SERvtCE P ACTOR...........
49.5%
61.5%
85.7%'
- 13. REACTOR AVAILAtluTY PACTOR...
38,2%
58.6%
82.72
- 14. UNIT SERVICE PACTOR..........
38.2%
58.6%
82.72 is. uNir av AILAssuTY P ACTOR..........................
20.0%
51.5%
75.0%
is. unit CAP Ac TY PAcTOR (Uemio MOC:.................
19"II 09 3Y 7I 7?
- 17. uNtY CAPACITY PACTOR (Usume Osmen MWW.........,......
5.2%
9%
- 5. 3?
- 18. UNIT PORcEO OUTAGE RATE.. ~.......................
None
- 19. sMUTOOWNs sCMEOULEO OVER NEXT S MONTMs (TYPE. DATE. ANO OURATION OF EACMl:
l
- 20. IP SMUT DOWN AT ENO OF REPORT PERICO. ESTIMATED DATE OP sTARTUP:
4
~
CA.#804 Page 3 of 4 04/10/85 QDP-2Z-04204
l j.
r
..=
y l
s-I s
Farc E DO:KET NO.
50-483 y3~
~t j
l:
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callany 1
I 5/12/86 I) ATE COMPLETED BY ;D. B. PRAITE ret *0RT MONTH APRIL 1986 A,
TELEPHONE. 314/676-846G" i
!f
)
5 METHOD OF i
TYPE SHUTTING DOWN j.
F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED IHOUR$1 REASON REDUCING POWER CORRECTIVE ACTIONS /COM04ENTS 6.
4/16/86 F
0 A
3 Reactor trip, NN11 inverter failure.
LER 86-010-00 t
i 7.
4/18/86 F
6 A
1 Blown coupling seal between generator and exciter.
8.
4/19/86 F
9 G
3 S/G low level reactor trip.
LER 86-013-00.
Excessive initial loading of main generator.
l.
h*
,j SUANAARY:
REASON 8ET3100 i
A: EquBredENT FAILURE (EXF1Just I: 88498UAL R: M488tT.OR TEST 3: IAA98UAL SCRA80.
C: REFUEAJeeG 3: AtttOMATICSCRAbe
,o o n
$Q D: REGULATORY.RESTR8CTIO90 4: SIME(EEptAggg
<ses E: OPERATOR TRA80 DING A00D l
N &*M LICE 885E EXA001NAT90N 8 m F: ADtSNISTRATIVE lS*
G: OPERAT9000AL ERAGE (EXPLAIN) i N Of1ER(EEFLAINI Page 4 of 4
>-p
' Union Etecraic n
Callaway Ptant May 13,1986 I
l Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1311
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY CPEPATING REPORT APRIL 1986 The enclosed Monthly Operating Report for April 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
N G. L. Randolph Manager, Callaway Plant OfNh$$
MET /RDA/TPS/(('Q DBP/drs Enclosure cc: Distribution attached M
96
,\\\\
Mahng Adfress: P.O. Box 620, Fulton, MO 65251
p--
cc distribution for ULNRC-1311 with enclosures Mr. C. W. Hehl, Qhief Project Section 2A i
U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014~
Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102
. -. -