Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000412/1998009 + (03:08:55, 7 December 2024)
- ML20207D468 + (03:08:56, 7 December 2024)
- ML20207D469 + (03:08:56, 7 December 2024)
- 05000410/LER-1986-012-01, :on 861128 & 29,automatic Initiation of Standby Gas Treatment Sys Divs I & II & Emergency Recirculation Subsystem of Secondary Containment Ventilation Sys Occurred. Caused by Supply Fan Trip + (03:08:58, 7 December 2024)
- ML20207D465 + (03:09:00, 7 December 2024)
- B17689, Provides Discussion of Proposed Mods & Revised mark-up of Current Tech Specs.No Regulatory Commitments Contained within Ltr + (03:09:01, 7 December 2024)
- ML20207D458 + (03:09:02, 7 December 2024)
- ML20207D457 + (03:09:02, 7 December 2024)
- IR 05000353/1988016 + (03:09:04, 7 December 2024)
- ML20207D454 + (03:09:05, 7 December 2024)
- ML20207D453 + (03:09:05, 7 December 2024)
- ML20207D452 + (03:09:06, 7 December 2024)
- IR 05000346/1999002 + (03:09:12, 7 December 2024)
- ML20207D445 + (03:09:12, 7 December 2024)
- ML20207D442 + (03:09:13, 7 December 2024)
- ML20207D443 + (03:09:13, 7 December 2024)
- ML20207D437 + (03:09:14, 7 December 2024)
- 05000414/LER-1986-013, :on 860517,reactor Trip Occurred Due to Failure of Reverse Purge Flow Valve.Caused by Reverse Purge Valve Disk Being Separated from Valve Stem & Valve Being Stuck Closed.Reactor Trip Breakers Closed + (03:09:16, 7 December 2024)
- ML20207D435 + (03:09:17, 7 December 2024)
- ML20207D434 + (03:09:17, 7 December 2024)
- ML20207D430 + (03:09:18, 7 December 2024)
- ML20207D427 + (03:09:19, 7 December 2024)
- ML20207D429 + (03:09:19, 7 December 2024)
- ML20207D426 + (03:09:20, 7 December 2024)
- ML20207D421 + (03:09:21, 7 December 2024)
- ML20207D419 + (03:09:22, 7 December 2024)
- IR 05000498/1999003 + (03:09:23, 7 December 2024)
- ML20207D417 + (03:09:27, 7 December 2024)
- IR 05000353/1988015 + (03:09:28, 7 December 2024)
- ML20207D412 + (03:09:29, 7 December 2024)
- 05000456/LER-1988-015-03, :on 880710,control Room Recirculation Charcoal Absorber Dampers Repositioned,Placing Charcoal Absorbers in Svc & Annunciating Control Room Recirculation Alarm.Cause Undetermined.Protective Device to Be Installed + (03:09:31, 7 December 2024)
- ML20207D409 + (03:09:32, 7 December 2024)
- 05000361/LER-1986-030, :on 860911,core Protection Calculator Channel a Failed.Caused by Equipment Approaching End of Expected Life Cycle.Power Supply Replaced + (03:09:33, 7 December 2024)
- ML20207D405 + (03:09:34, 7 December 2024)
- ML20207D403 + (03:09:35, 7 December 2024)
- ML20207D404 + (03:09:35, 7 December 2024)
- ML20207D401 + (03:09:36, 7 December 2024)
- ML20207D395 + (03:09:38, 7 December 2024)
- ML20207D393 + (03:09:39, 7 December 2024)
- ML20207D386 + (03:09:40, 7 December 2024)
- ML20207D388 + (03:09:40, 7 December 2024)
- ML20207D383 + (03:09:41, 7 December 2024)
- ML20207D381 + (03:09:42, 7 December 2024)
- ML20207D382 + (03:09:42, 7 December 2024)
- ML20207D378 + (03:09:43, 7 December 2024)
- ST-HL-AE-1826, Forwards FSAR Table 3.9-10,safety-related Seismic Category 1 Equipment Qualification Procedure (NSSS Scope),Annotated to Changes in Program.Changes Will Be Incorporated in Future FSAR Amend.Related Correspondence + (03:09:43, 7 December 2024)
- ML20207D377 + (03:09:44, 7 December 2024)
- ML20207D372 + (03:09:45, 7 December 2024)
- ML20207D373 + (03:09:45, 7 December 2024)
- ML20207D371 + (03:09:46, 7 December 2024)
- ML20207D370 + (03:09:47, 7 December 2024)