Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207J703 + (01:57:18, 7 December 2024)
- ML20207J702 + (01:57:21, 7 December 2024)
- ML20207J701 + (01:57:22, 7 December 2024)
- ML20207J695 + (01:57:23, 7 December 2024)
- ML20207J696 + (01:57:23, 7 December 2024)
- ML20207J694 + (01:57:24, 7 December 2024)
- ML20207J692 + (01:57:24, 7 December 2024)
- ML20207J691 + (01:57:25, 7 December 2024)
- ML20207J688 + (01:57:26, 7 December 2024)
- ML20207J690 + (01:57:26, 7 December 2024)
- 05000361/LER-1999-002, :on 990208,pressurizer Safety Valves Were Above TS Limit.Caused by Setpoint Drift.Sce Submitted License Amend Application on 980904 Requesting Tolerence Be Changed to +3/-2%.With + (01:57:28, 7 December 2024)
- ML20207J682 + (01:57:29, 7 December 2024)
- ML20207J679 + (01:57:30, 7 December 2024)
- ML20207J678 + (01:57:31, 7 December 2024)
- ML20207J672 + (01:57:31, 7 December 2024)
- ML20207J671 + (01:57:32, 7 December 2024)
- ML20207J669 + (01:57:33, 7 December 2024)
- ML20207J670 + (01:57:33, 7 December 2024)
- L-88-392, Forwards Response NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Twenty Hfa Relays of Type Described by Bulletin Installed in safety-related Sys + (01:57:34, 7 December 2024)
- ML20207J668 + (01:57:34, 7 December 2024)
- ML20207J662 + (01:57:35, 7 December 2024)
- ML20207J659 + (01:57:36, 7 December 2024)
- ML20207J658 + (01:57:37, 7 December 2024)
- ML20207J656 + (01:57:38, 7 December 2024)
- ML20207J651 + (01:57:38, 7 December 2024)
- IR 05000271/1987099 + (01:57:39, 7 December 2024)
- ML20207J649 + (01:57:40, 7 December 2024)
- ML20207J646 + (01:57:40, 7 December 2024)
- ML20207J645 + (01:57:41, 7 December 2024)
- B17639, Forwards Rev 32 to Millstone Station Physical Security Plan (Psp).Attachments to Ltr Contain Comments Made by Util, Explanation of Changes & Security Plan.Without Attachments + (01:57:42, 7 December 2024)
- ML20207J644 + (01:57:42, 7 December 2024)
- ML20207J642 + (01:57:43, 7 December 2024)
- ML20207J637 + (01:57:44, 7 December 2024)
- ML20207J636 + (01:57:44, 7 December 2024)
- ML20207J635 + (01:57:45, 7 December 2024)
- ML20207J630 + (01:57:46, 7 December 2024)
- ML20207J627 + (01:57:47, 7 December 2024)
- ML20207J628 + (01:57:47, 7 December 2024)
- IR 05000317/1986023 + (01:57:48, 7 December 2024)
- ML20207J626 + (01:57:48, 7 December 2024)
- ML20207J623 + (01:57:49, 7 December 2024)
- 05000461/LER-1986-023, :on 861207,shutdown Discharge Vol High Level Alarm Received in Main Control Room,Resulting in Actuation of Reactor Protection Sys Scram Trip Function.Caused by Personnel Error.Shift Supervisors Briefed + (01:57:51, 7 December 2024)
- ML20207J620 + (01:57:52, 7 December 2024)
- A07492, Responds to NRC Re Violations Noted in Insp Rept 50-423/88-04.Corrective actions:Litton-Veam Connectors Will Be Replaced W/Qualified feed-through Devices During May 1989 Refueling Outage + (01:57:53, 7 December 2024)
- ML20207J614 + (01:57:54, 7 December 2024)
- ML20207J615 + (01:57:54, 7 December 2024)
- ML20207J612 + (01:57:55, 7 December 2024)
- ML20207J613 + (01:57:55, 7 December 2024)
- 05000317/LER-1988-009, :on 880824,Unit 1 Tripped on Loss of Load When Main Turbine Tripped on High Steam Generator Level.Caused by Vibration & Stress.Walkdown Performed on Selected Components & Pressure Switch Relocated + (01:57:57, 7 December 2024)
- ML20207J607 + (01:57:58, 7 December 2024)
- ML20207J606 + (01:57:59, 7 December 2024)
- ML20207J604 + (01:58:00, 7 December 2024)