Forwards Insp Rept 50-412/86-29 on 860929-1003.Violation of NRC Reporting Requirements Re Failure to Describe Corrective Actions on Westinghouse 7300 Process Protection Sys Circuit Cards Noted.Enforcement Action Under Consideration
ML20207J678
Person / Time
Site: Beaver Valley
Issue date: 12/30/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20207J683 List:
References
NUDOCS 8701080557
Download: ML20207J678 (2)


See also: IR 05000412/1986029

Text

.

.

SEC 3 01386

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: Inspection Report No. 50-412/86-29

This refers to the routine inspection conducted by Mr. F. Paulitz of this

office on September 29, 1986 - October 3, 1986 at Beaver Valley Nuclear Power

Station, Unit 2, Shippingport, Pennsylvania of activities authorized by NRC

License CPPR-105 and to the discussions of our findings held by Mr. Paulitz

with Mr. Noonan and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection a violation of NRC reporting requirements was identified.

In 1983 and in 1984 Duquesne Light Company and your contractor, Stone and

Webster identified deficiencies with some of the Westinghouse 7300 Process

Protection System (PRS) circuit cards. However, the final and supplemental

Construction Deficiency Report (CDR) submitted to the NRC to address these

deficiencies did not contain ar! adequate description of the corrective actions,

and the supplemental report that reported the presence of NLP cards at your

facility was not filed in a timely manner. This violation is discussed in the

enclosed inspection report. In this regard we are considering appropriate

enforcement action and will inform you of our decision in the near future.

Your cooperation with us in this matter is appreciated.

Sincerely,

Orisbl 01~cd E78

Jacc:u P. Dwr

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-412/86-29

8701090557 861230

f I h

PDR ADOCKOSOOg2 /

OFFICIAL RECORD COPY IR BV2 86-29 - 0001.0.0

@

11/29/80

. . .

.

.

e

Duquesne Light Company 2

cc/ enc 1:

E. J. Woolever, Vice President, Special Project

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

J. P. Thomas, Manager, Engineering

R. E. Martin, Manager, Regulatory Affairs

C. O. Richardson, Stone and Webster Engineering Corporation

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

,

A. Cerne, SRI, Seabrook

W. Troskoski, SRI, BV-1

P. Tam, LPM, NRR

T. Martin, DRSS

S. Ebneter, DRS

Robert J. Bores, DRSS

,

chi

.RI:D 0

p,(glS Cf4

RI:DRS

0

RI:DRS

kl

RI:DRS

Paulitz/cg1 Anders n Dury Ebneter

j (4 t)/JJi N 9/15 %

OFFICIAL RECORD COPY IR BV2 86-29 - 0001.1.0

11/29/80

_ _ _

- - - - - , - - - .. . _ , . - .-