ML20207J623

From kanterella
Jump to navigation Jump to search
Advises That Required Turbine Trip Test Successfully Conducted on 860723.Reactor Did Not Trip & PORVs Not Challenged
ML20207J623
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/24/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.10, TASK-TM NUDOCS 8607290189
Download: ML20207J623 (1)


Text

_

.m

.m DUKE POWER GOMPANY P.O. box 33180 CHARLOTrE, N.C. 28242 HAL B. TUCKER TELEPHONE wwa pasaroen (704) 37CF4831 avoa. man ruosnuon July 24, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station, Unit 2 Doclut No. 50-414

Dear Mr. Denton:

License Condition 9, Anticipatory Reactor Trip, II.K.3.10, of Facility Operating License NPF-52 requires that, prior to exceeding 70" power, Duke Power Company shall complete the described turbine trip tests to verify that the PORV's will not be challenged when the anticipatory bypass is in effect.

This is to advise that the required turbine trip test was successfully conducted at 10:03 p.m. on July 23, 1986. The reactor did not trip and the PORV's were not challenged. The unit was back on-line at 11:30 p.m.

Very truly yours, Hal B. Tucker '

ROS/03/slb xc:

Dr. J. Nelson Grace, Regional Administration U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 3

8607290189 860724 1