Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207Q600 + (00:52:37, 7 December 2024)
- ML20207Q599 + (00:52:38, 7 December 2024)
- ML20207Q598 + (00:52:38, 7 December 2024)
- ML20207Q594 + (00:52:39, 7 December 2024)
- TXX-6228, Final Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021.Mods Will Be Implemented as Required to Alleviate All Unacceptable Conditions + (00:52:39, 7 December 2024)
- ML20207Q590 + (00:52:40, 7 December 2024)
- ML20207Q589 + (00:52:40, 7 December 2024)
- ML20207Q585 + (00:52:41, 7 December 2024)
- ML20207Q586 + (00:52:41, 7 December 2024)
- ML20207Q584 + (00:52:42, 7 December 2024)
- IR 05000334/1986029 + (00:52:43, 7 December 2024)
- ML20207Q582 + (00:52:43, 7 December 2024)
- ML20207Q574 + (00:52:44, 7 December 2024)
- ML20207Q560 + (00:52:45, 7 December 2024)
- ML20207Q564 + (00:52:45, 7 December 2024)
- ML20207Q559 + (00:52:46, 7 December 2024)
- ML20207Q558 + (00:52:46, 7 December 2024)
- ML20207Q557 + (00:52:47, 7 December 2024)
- 05000440/LER-1986-090, :on 861225,one Standby Liquid Control Sys Train Inoperable,Violating Tech Spec 3.0.4.Caused by Work Package Deficiency Due to Personnel Error.Personnel Counseled & Training Initiated + (00:52:53, 7 December 2024)
- 05000331/LER-1986-027, :on 861218,inadvertent Trip of Reactor Protection Sys Occurred.Caused by Personnel Failure to Reset Logic.Disciplinary Action Initiated.Procedure Will Be Modified to Include Addl Precautions + (00:53:00, 7 December 2024)
- ML20207Q550 + (00:53:01, 7 December 2024)
- TXX-6200, Advises That Completion Date for Corrective Action for Procedure STA-606, Work Orders/Work Requests, Changed from 861231 to 870228,per Violation 446/8509-V-02 + (00:53:02, 7 December 2024)
- 05000388/LER-1986-018-01, :on 861219,125-volt Dc Battery Charger 1D613 Inoperable.Unit 1 Supervisor Failed to Inform Unit 2 Supervisor of Equipment Failure,Resulting in Violation of Tech Spec.Battery Replaced + (00:53:08, 7 December 2024)
- 05000277/LER-1986-025-01, :on 861210 & 16,dedicated Fire Watches Not Established in Emergency Diesel Generator Rooms.Caused by Failure to Adhere to Procedures.Event Reviewed W/Operations Personnel.Surveillance Test ST 8.1 Revised + (00:53:15, 7 December 2024)
- IR 05000272/1986032 + (00:53:16, 7 December 2024)
- ML20207Q538 + (00:53:17, 7 December 2024)
- ML20207Q537 + (00:53:18, 7 December 2024)
- 05000483/LER-1986-042, :on 861222,Tech Spec Surveillance on Valve AL-HV-0034 Not Performed within Specified Time Interval. Caused by Personnel Error & Procedural Inadequacy. Surveillance Test Request Form Will Be Revised + (00:53:24, 7 December 2024)
- ML20207Q534 + (00:53:25, 7 December 2024)
- ML20207Q533 + (00:53:31, 7 December 2024)
- 05000529/LER-1986-038-01, :on 861227,two MSIVs Declared Inoperable Due to Low Hydraulic Accumulator Pressure.Caused by Control Room Operator Using Wrong Handswitches to Open Valves.Personnel Counseled + (00:53:38, 7 December 2024)
- ML20207Q529 + (00:53:38, 7 December 2024)
- 05000251/LER-1986-030-01, :on 861219,process Radiation Monitor R-12 Spiked,Causing Control Room Ventilation & Containment Vent Isolation.Caused by Electrical Transient While Meggering R-15 Cable.Monitor R-12 Reset + (00:53:45, 7 December 2024)
- ML20207Q525 + (00:53:46, 7 December 2024)
- ML20207Q527 + (00:53:46, 7 December 2024)
- ML20207Q523 + (00:53:52, 7 December 2024)
- ML20207Q520 + (00:54:00, 7 December 2024)
- ML20207Q518 + (00:54:00, 7 December 2024)
- 05000410/LER-1986-022-01, :on 861222,Div I-III Diesel Generators Declared Inoperable During Simultaneous Draining of Day Tank During Chemistry Surveillance Test.Caused by Procedure Deficiency. Procedure Revised.Personnel Counseled + (00:54:22, 7 December 2024)
- 05000410/LER-1986-020-01, :on 861218,Div 1 ECCS Initiation Experienced Due to Spurious High Drywell Pressure Signal.Caused by Electricians Replacing Relay.Electrical Maint Training Initiated + (00:54:24, 7 December 2024)
- ML20207Q503 + (00:54:26, 7 December 2024)
- ML20207Q505 + (00:54:26, 7 December 2024)
- ML20207Q502 + (00:54:27, 7 December 2024)
- 05000410/LER-1986-010, :on 861123,25% of Control Rods Received Full Scram Signal When Group 2 Control Rod Scram Solenoid Valves Deenergized.Cause Not Positively Determined.Training Mod Request Will Be Issued.Procedures Revised + (00:54:30, 7 December 2024)
- ML20207Q497 + (00:54:31, 7 December 2024)
- 05000219/LER-1986-031, :on 861218,reactor Bldg Closed Cooling Water Flow to Drywell Isolated on lo-lo-lo Reactor Vessel Water Level Signals Causing Pressure Spike on Instrument Sensing Line.Caused by Personnel Error + (00:54:33, 7 December 2024)
- ML20207Q492 + (00:54:34, 7 December 2024)
- U-600821, Application to Amend License NPF-55,revising Tech Spec Section 3/4.7.2 to Change Recirculation Sys Air Flow Acceptance Criteria for Control Room HVAC Sys + (00:54:35, 7 December 2024)
- ML20207Q488 + (00:54:36, 7 December 2024)
- ML20207Q487 + (00:54:37, 7 December 2024)
- 05000410/LER-1986-023-01, :on 861223,inoperable Fire Detector Discovered During Routine Insp.Caused by Personnel Removing Detector from Base Prior to Replacement,Per 861222 Work Request. Surveillance Procedure Will Be Developed + (00:54:39, 7 December 2024)