Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18054A639 + (14:16:58, 6 January 2025)
- ML18054A636 + (14:16:59, 6 January 2025)
- ML18054A638 + (14:16:59, 6 January 2025)
- ML18054A634 + (14:17:00, 6 January 2025)
- ML18054A631 + (14:17:02, 6 January 2025)
- ML18054A628 + (14:17:02, 6 January 2025)
- ML18054A625 + (14:17:03, 6 January 2025)
- ND-18-0213, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item E.3.9.06.00.03 (Index Number 861) + (14:17:04, 6 January 2025)
- 05000255/LER-1989-004, :on 890228,reactor Trip Occurred During Performance of Tech Spec Surveillance Procedure RO-21, Control Rod Drive Sys Interlocks. Caused by Inadequate Procedure.Surveillance Procedure RO-21 Revised + (14:17:06, 6 January 2025)
- ML18054A622 + (14:17:07, 6 January 2025)
- ML18054A621 + (14:17:08, 6 January 2025)
- ML18054A619 + (14:17:10, 6 January 2025)
- 05000255/LER-1989-005, :on 890303,diesel Generator Operation Failed to Meet & Maintain Required Fuel Oil Capacity.Caused by Failure to Update Diesel Fuel Oil Consumption Calculations.Storage Tank Filled to Meet Required Min + (14:17:12, 6 January 2025)
- ML18054A617 + (14:17:13, 6 January 2025)
- ML18054A613 + (14:17:13, 6 January 2025)
- ML18054A610 + (14:17:14, 6 January 2025)
- ML18054A608 + (14:17:17, 6 January 2025)
- 05000255/LER-1989-002-01, :on 890215,pressurizer PORV Opened Due to Primary Coolant Sys Pressure Spike.Caused by Air Entrainment in Primary Coolant Sys.Pressurizer PORV & Associated Pilot Valve Repaired + (14:17:19, 6 January 2025)
- IR 05000255/1988020 + (14:17:21, 6 January 2025)
- ML18054A605 + (14:17:22, 6 January 2025)
- ML18054A603 + (14:17:23, 6 January 2025)
- ML18054A595 + (14:17:41, 6 January 2025)
- 05000255/LER-1989-003-01, :on 890218,plant Cooldown from Hot Shutdown Condition Initiated Due to Primary Coolant Sys Leakage Through Cold Leg Drain Valves.Drain Lines Capped Downstream of Loop Isolation Valves + (14:17:43, 6 January 2025)
- ML18054A591 + (14:17:44, 6 January 2025)
- ML18054A592 + (14:17:44, 6 January 2025)
- IR 05000255/1989003 + (14:17:49, 6 January 2025)
- ML18054A588 + (14:17:51, 6 January 2025)
- IR 05000255/1989002 + (14:17:52, 6 January 2025)
- ML18054A584 + (14:17:54, 6 January 2025)
- ML18054A585 + (14:17:54, 6 January 2025)
- ML18054A582 + (14:17:55, 6 January 2025)
- ML18054A583 + (14:17:55, 6 January 2025)
- ML18054A580 + (14:17:56, 6 January 2025)
- ML18054A579 + (14:17:57, 6 January 2025)
- ML18054A578 + (14:17:58, 6 January 2025)
- ML18054A575 + (14:17:58, 6 January 2025)
- ML18054A571 + (14:18:00, 6 January 2025)
- PNO-III-89-014, on 890218,plant Operator Observed Leakage from Primary Cooling Sys Through Drain Line Into Primary Sys Drain Tank.Lines Being Removed & Capped Downstream from Drain Valves.Effort Expected to Be Completed by 890222 + (14:18:02, 6 January 2025)
- ML18054A569 + (14:18:03, 6 January 2025)
- ML18054A568 + (14:18:03, 6 January 2025)
- ML18054A567 + (14:18:04, 6 January 2025)
- ND-18-0227, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.05.02.i (Index Number 565) + (14:18:05, 6 January 2025)
- ML18054A564 + (14:18:09, 6 January 2025)
- 05000255/LER-1989-001-01, :on 890127,primary Coolant Sys Leak Rate Determination Not Completed,Per Plant Tech Specs Table 4.2.2,Item 8.Caused by in-progress Plant Derate.Leak Rate Determination Completed & Evaluation Ongoing + (14:18:10, 6 January 2025)
- ML18054A561 + (14:18:11, 6 January 2025)
- ML18054A560 + (14:18:12, 6 January 2025)
- ML18054A555 + (14:18:13, 6 January 2025)
- ML18054A559 + (14:18:13, 6 January 2025)
- ML18054A554 + (14:18:14, 6 January 2025)
- ML18054A552 + (14:18:15, 6 January 2025)
- ML18054A547 + (14:18:16, 6 January 2025)