ML18054A585
| ML18054A585 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/02/1989 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18054A586 | List: |
| References | |
| NUDOCS 8903140522 | |
| Download: ML18054A585 (3) | |
See also: IR 05000255/1989002
Text
Docket No. 50-255
Consumers Power Company
ATTN:
David P. Hoffman
Vice President
Nuclear Operations
1945 West Parnall Road *
Jackson, MI
49201 *
Gentlemen:
MAR o 2 i989
This refers to the routine safety inspection conducted by Mr. E. R. Swanson
during the period of January 10 through February 6, 1989, of activities at
the Palisades Nuclear Generating Plant authorized by NRC Provisional Operating
License No. DPR-20 and to the discussion of our findings with Mr. G. B. Slade
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, one potential violation of NRC requirements and one
"unresolved item", identified in the inspection report, are being reviewed
for potential enforcement actions.
You will be notified by subsequent
correspondence of our decision regarding enforcement action~ based
on the findings of this inspection.
No written response is required at this
time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
- ==:9o*-:: *t .11 ,~>=*-**-* .- - - -
-*.
- -. -i* .... 1.a::....::.
- =:';:JtJ:jt):2
AD6CK 05000255
W
Enclosure:
Inspection Report
No. 50-255/89002(DRP)
See Attached Distribution
Sincerely,
Edward G. Greenman, Director
Division of Reactor Projects
~)
RIII
~tn
?\\;{,~o
RII~)~'61
Greenman
Docket No. 50-255
C~nsumers Power Company
AfTN:
David P. Hoffman
Vice President
Nuclear Operations
1945 West Parnall Road
Jackson, MI
49201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. E. R. Swanson
during the period of January 10 through February 6, 1989, of activities at
the Palisades.Nuclear Generating Plant authorized by NRC Provisional Operating
License No. DPR-20 and to the discussion of our findings with Mr. G. B. Slade
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
While no violations of NRC requirements are contained in the enclosed
inspection report, the
11 unresolved items 11 identified in the inspection report
are being re~iewed for potential enforcement actions.
You will be notified by
subsequent correspondence of our decision regarding enforcement actions based*
on the findings of this inspection.
No wr~tten response is required at this
time.
In accordance with 10 CFR 2.790 of the Commission's ~egulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
. Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Report
No. 50-255/89002(DRP)
See Attached Distribution
.* RIII A
-~ ~~
Schul z/mnj
?,-2--f>~
RIII
Burgess
Sincerely,
W. L. Axelson, Chief
Projects Branch 2
RIII
Axelson
. Consumers Power Company
- Distribution
cc w/enclosure:
Mr. Kenneth W. Berry, Director
Nuclear Licensing
Gerald B. Slade, General Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Pub 1 i c Service Cammi s_s ion
Michigan Department of
Public Health
A. DeAgazio, Licensing
Project Manager, NRR
2
MAR o 2 i989