Advises That Tech Spec Change Request,Addressing Shutdown Cooling Sys Operation,Will Be Delayed for 90 Days Due to Significant Concerns Raised in in-house Review of Draft
ML18054A617
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/29/1989
From: Kuemin J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-17, TAC-42130, NUDOCS 8904040182
Download: ML18054A617 (1)


Text

JI' consumers Power POWERiNii MICHlliAN'S PRDliRESS General Offices: 1945 West Parnell Road, Jackson,' Ml 49201 * (517) 788-0550 March 29, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

DELAY lN SUBMITTAL OF TECHNICAL SPECIFICATIONS CHANGE REQUEST FOR SHUTDOWN COOLING SYSTEM In.Consumers Power Company's 90-day response to Generic Letter 88-17, dated Janu?ry 31, 1989 a commitment was made to submit a Technical Specification Change Request (TSCR) which addresses Shutdown Cooling System operation. We had indicated the TSCR would be submitted by April 1, 1989. Significant concerns have been raised in the inhouse review of the draft of this TSCR.

These concerns have led to an expanded scope of what was originally perceived and also involves a larger resource allocation. While significant effort has been expended to date, reassessment of the scope leads us to conclude a 90-day delay is necessary to ensure the TSCR is complete and agreeable to all concerned within Consumers Power Company. This subject Shutdown Cooling System change request will replace the one submitted April 30, 1985 (TAC No.

42130) which is hereby requested to be withdrawn.

~~

L Kuemin Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades 8904040182 890829 PDR ADOCK 05000255 p PDC OC0389-0104-NL04 A CMS' ENERGY COMPANY