ML18054A592
| ML18054A592 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/28/1989 |
| From: | Goralski G, Mlynarek M CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8903230480 | |
| Download: ML18054A592 (5) | |
Text
-..
- 1.
2..
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
OPERATING DATA REPORT DOCKET NO ---~5~0_-_2_5_5 DATE 07-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913*
OPERATING STATUS NOTES
- unit Name:
Palisades Reporting Period:
890201-890228 Licensed Thermal P,ower (MWt):
2530 Nameplate Rating (Gro$s MWe):
811. 7 Design Electrical Rating (Net MWe):
805 Maximum Dependable Capacity (Gross MWe): **770 Maximum Dependable Capacity (Net MWe) :. ___
-l..'"*730 If Changes Occur in Capacity Ra-tiqgs.J~~ems':Number-3°-through--'7)
- since las.t repc:rrt,:,,
give reasons:
Power Level to Which Restricted, if any (Net MWe): --------------'----~
Reasons for Restriction~, if any:_-__
-_*---------------------'-*-*_"_~ __
Hours In Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours This Month 672.0.
o.o o.o Yr-to-Date 1416.0 150,759.0 707.9
"'79,715.3 707.5 75,829.6 Gross Thermal Energy Generated (MWH)
O.O 1,657,920 160,208,925 Gross Electrical Energy-Generated (MwH)
O.O 537,810 50,082,295 Net Electrical Energy Generated (MWH) 0.O 'i 508, 995
- 47, 161,244 Unit Service Factor 0.0 -
50.0;.;';
50.3 Unit Availability Factor.
0.0 So.o;.: _____
_;;_5_;_0_._3 Unit Capacity Factor (Usi'rigMDC'Net)-.
0-.-0 49.2*';"
- 48.1 Unit Capacity Factor (Using DER-Net) 0.0 44.7:
38.9 Unit Forced Outage Rate 100.0 50.0 35.3 Shutdowns Scheduled_Over Next Six Montb,s (Type, Date and_ Duration_,oCEach'):
- 25. If Shut Down at End of Report Period,.Estimated Date of Start Up:
- 26.
Units in Test Status-(Prior to Commer~ial Operation):
March 1, 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure Forecast
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
OC0185-0001B-OP03
- -----a9oa23a4ao =09022e*~ -. --1 I*
PDR ADOCK 05000255 R
PNU
.~:
Achieved
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT -----'P"'-'a=l-'--i-'s-'a"""'d;_oe"""'"s DATE ___
0~3~-_0_..;.7_-_8"""'"9 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH FEBRUARY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
14 0
15 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
OC0185-0001C-OP03
REPORT MONTH ___
FE_B_RU_A_R_Y _1_98'-9 __ _
No.
Date Type1 01 890130 F
- 1.
- 2.
F:
Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 672.0 A
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refuel ing D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #
1
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
DOCKET NO.
50-255 UNIT NAME ____
P-'-a_l1_*s_a-'-de_s DATE 03-07-89 COMPLETED BY ____
M_G_M~ly~n_a_re_k TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Tube leak in "B" I
- 5.
Exhibit I - Same Source
~
SUMMARY
OF OPERATING EXPERIENCE FOR FEBRUARY, 1989 The plant remained shutdown for the entire month of February to allow continued repair of the B Steam Generator.
(B Steam Generator outage started on 01/30/89.)
OC0185-0001E-OP03
consumers Power l'OWERINli MICHlliAN~S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 6, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of February, 198,9.
~
~
George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-420B GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, TNPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-324 GBSzczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*005 OC0185-0001A-OP03 A CMS ENERGY COMPANY