ML18054A639

From kanterella
Jump to navigation Jump to search
Advises That Tech Spec Procedure MI-39 Incorporated Into on-the-job Training Program on 890407 & Task Completed,Per Util 880902 Response to Insp Rept 50-255/88-08
ML18054A639
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/07/1989
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904170168
Download: ML18054A639 (1)


Text

  • POWERIN&

MICHIGAN'S PRO&RESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 April 7, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

INSPECTION REPORT 88008 UPDATE Consumers Power Company's September 2, 1988 revised response to NRC Inspection Report 88008 dated April 22, 1988 stated that Technical Specification Surveillance Procedure MI.,..39 was going to be included within existing I&C Department surveillance testing training in order to place emphasis on procedural steps and necessary procedure limitations and responses. This action was to be completed by March 31, 1989 but due to the Systematic Approach to Training process taking longer than anticipated, this date was not met. The Systematic Approach to Training process ensures that the Training developed for MI-39 meets the needs of the Instrumentation and Control Department On-The-Job Training Program. The task was completed and MI-,.39 ;incorporated into the On-The-Job Training Program on April 7, 1989 .

.1

,.-- .--* *****-...,>~

Thomas C Berdine Plant Licensing Administrator cc Administrator, Region III, NRC NRC Resident Inspector - Palisades 8904170168 890407 PDR ADOCK 05000255 G PNU OC0489-0116-NL04