Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18059A904 + (12:42:30, 6 January 2025)
- ML18059A901 + (12:42:31, 6 January 2025)
- ML18059A887 + (12:42:34, 6 January 2025)
- ML18059A885 + (12:42:35, 6 January 2025)
- ML18059A884 + (12:42:36, 6 January 2025)
- 05000255/LER-1994-003-01, :on 940209,discovered That Single Active Failure Could Disable Seal Cooling to Ess Pumps & Backup Cooling Supply Not Fully Qualified.Affected Valves Opened to Eliminate Possibility of Single Failure + (12:42:39, 6 January 2025)
- ML18059A879 + (12:42:41, 6 January 2025)
- 05000225/LER-1994-003, :on 940203,position Switches for Containment Air Cooler Svc Inlet & Valves Not Qualified for Submergence. Caused by Master Equipment List Which Did Not Alert User of Existence of Qualification Restrictions + (12:42:43, 6 January 2025)
- ML18059A872 + (12:42:44, 6 January 2025)
- ML18059A870 + (12:42:46, 6 January 2025)
- ML18059A869 + (12:42:47, 6 January 2025)
- ML18059A867 + (12:42:48, 6 January 2025)
- ML18059A865 + (12:42:50, 6 January 2025)
- ML18059A862 + (12:42:51, 6 January 2025)
- ML18059A859 + (12:42:51, 6 January 2025)
- 05000255/LER-1992-031, :on 920402,left Channel DBA Sequencer Inadvertently Activated by Technician Preparing to Test Left Normal Shutdown Sequencer Due to Inadequate Test Procedures. Procedures RT-13A & B & RT-8C & D Revised + (12:42:53, 6 January 2025)
- 05000255/LER-1992-031-01, Forwards LER-92-031-01 Re Inadvertent ESF Actuation Caused by Inadequate Test Procedures.Original Corrective Action to Revise Test Connection Drawings No Longer Required Because Plant Procedures Revised in Such Detail to Eli + (12:42:56, 6 January 2025)
- ML18059A841 + (12:43:00, 6 January 2025)
- ML18059A839 + (12:43:07, 6 January 2025)
- ML18059A837 + (12:43:09, 6 January 2025)
- ML18059A826 + (12:43:21, 6 January 2025)
- ML18059A825 + (12:43:22, 6 January 2025)
- ML18059A822 + (12:43:23, 6 January 2025)
- ML18059A820 + (12:43:25, 6 January 2025)
- ML18059A819 + (12:43:26, 6 January 2025)
- ML18059A816 + (12:43:27, 6 January 2025)
- SECY-18-0028, Weekly Information Report - Week Ending February 23, 2018 + (12:43:28, 6 January 2025)
- IR 015000009/2018001 + (12:43:30, 6 January 2025)
- ML18059A804 + (12:43:34, 6 January 2025)
- ML18059A801 + (12:43:36, 6 January 2025)
- ND-18-0245, Submittal of Annual Fitness-for-Duty Program Performance Data Report for 2017 + (12:43:37, 6 January 2025)
- ML18059A798 + (12:43:39, 6 January 2025)
- ML18059A784 + (12:43:42, 6 January 2025)
- ML18059A782 + (12:43:43, 6 January 2025)
- ML18059A781 + (12:43:45, 6 January 2025)
- AEP-NRC-2018-14, Form OAR-1, Owners Activity Report + (12:43:46, 6 January 2025)
- ML18059A755 + (12:43:52, 6 January 2025)
- ML18059A721 + (12:44:02, 6 January 2025)
- RS-18-025, Submittal of Fitness for Duty Performance Data Reports for the Year 2017 + (12:44:03, 6 January 2025)
- ML18059A716 + (12:44:05, 6 January 2025)
- ML18059A712 + (12:44:07, 6 January 2025)
- ML18059A711 + (12:44:08, 6 January 2025)
- ML18059A710 + (12:44:09, 6 January 2025)
- ML18059A709 + (12:44:10, 6 January 2025)
- 05000255/LER-1994-002, :on 940126,inadvertent Containment Spray Pump ESF Actuation Occurred During Performance of TS Surveillance Testing.Caused by Inadequate Procedure.Tssp Q0-1 Modified to Warn Operators of CSP Start + (12:44:12, 6 January 2025)
- ML18059A706 + (12:44:15, 6 January 2025)
- ML18059A704 + (12:44:16, 6 January 2025)
- PNO-III-93-034, on 930615,one of 45 Control Rods Being Lifted W/Reactor Head,Caused by Rod Assembly Not Properly Detached Before Lifted.Special Insp Will Be Conducted of Event + (12:44:19, 6 January 2025)
- ML18059A702 + (12:44:21, 6 January 2025)
- ML18059A701 + (12:44:21, 6 January 2025)
- 05000255/LER-1994-001, :on 940121,both Trains of Control Room Emergency Heating,Ventilation & Air Conditioning Inoperable. Caused by Screen Plugged W/Ice & Snow.Surveillance Procedure Revised + (12:44:23, 6 January 2025)