Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18094B453 + (08:21:18, 6 January 2025)
- ML18094B452 + (08:21:18, 6 January 2025)
- 05000272/LER-1990-012-01, :on 900409,reactor Trip on Steam Generator 12 lo-lo Level Occurred.Caused by Equipment Failure.Steam Generator 12 Governor Valve Linkage Repaired + (08:21:19, 6 January 2025)
- 05000272/LER-1990-011-01, :on 900406,turbine Trip & Feedwater Isolation Actuation Occurred on Steam Generator 14 hi-hi Level. Caused by Equipment Failure.Valve Stem on Valve 12TB10 Polished & Adjusted + (08:21:21, 6 January 2025)
- ML18094B448 + (08:21:22, 6 January 2025)
- 05000272/LER-1990-010-01, :on 900403,reactor Trip Signal Initiated Due to lo-lo Level in Steam Generator 12.Caused by Personnel Error. Event Reviewed by Operations Dept Mgt & Personnel Involved Held Accountable + (08:21:23, 6 January 2025)
- ML18094B446 + (08:21:24, 6 January 2025)
- ML18094B445 + (08:21:25, 6 January 2025)
- ML18094B444 + (08:21:28, 6 January 2025)
- 05000272/LER-1990-009-01, :on 900328,main Steamline Isolation Signal Actuated During Performance of Channel I Main Steamline Flow Calibr.Caused by Inadequate Procedure.Main Steamline Flow Detector Calibr Procedure Revised + (08:21:29, 6 January 2025)
- ML18094B441 + (08:21:31, 6 January 2025)
- ML18094B439 + (08:21:31, 6 January 2025)
- ML18094B438 + (08:21:32, 6 January 2025)
- ML18094B437 + (08:21:33, 6 January 2025)
- ML18094B436 + (08:21:34, 6 January 2025)
- 05000272/LER-1990-008-01, :on 900327,controlled Shutdown Commenced,Per Tech Spec Action Statement Due to Inoperability of Safeguards Equipment Controls Cabinet 1A.Caused by Equipment Failure.Spare Chassis Installed + (08:21:35, 6 January 2025)
- ML18094B434 + (08:21:36, 6 January 2025)
- ML18094B432 + (08:21:37, 6 January 2025)
- TAC:76050 + (08:21:38, 6 January 2025)
- ML18094B431 + (08:21:39, 6 January 2025)
- ML18094B430 + (08:21:40, 6 January 2025)
- ML18094B428 + (08:21:41, 6 January 2025)
- ML18094B426 + (08:21:42, 6 January 2025)
- ML18094B427 + (08:21:42, 6 January 2025)
- 05000272/LER-1990-007-01, :on 900321,found Tech Spec Surveillance for Containment Spray Not Performed Historically.Root Cause of Event Attributed to Past Inadequate Administrative Controls. Administrative Procedure Revised + (08:21:44, 6 January 2025)
- ML18094B424 + (08:21:45, 6 January 2025)
- ML18094B423 + (08:21:46, 6 January 2025)
- TAC:66932 + (08:21:47, 6 January 2025)
- ML18094B421 + (08:21:48, 6 January 2025)
- ML18094B418 + (08:21:49, 6 January 2025)
- NRC-90-3498, Outlines Plan & Basis for Plan to Update Steam Generator Tube Fatigue Evaluations Performed by Westinghouse in Response to NRC Bulletin 88-002 + (08:21:50, 6 January 2025)
- ML18094B416 + (08:21:50, 6 January 2025)
- ML18094B412 + (08:21:52, 6 January 2025)
- IR 05000272/1990007 + (08:21:57, 6 January 2025)
- ML18094B407 + (08:21:59, 6 January 2025)
- ML18094B409 + (08:21:59, 6 January 2025)
- ML18094B405 + (08:22:00, 6 January 2025)
- ML18094B404 + (08:22:00, 6 January 2025)
- 05000272/LER-1990-006-01, :on 900302,ESF Actuation & Containment Ventilation Isolation Occurred.Caused by Design/Equipment Problem.Channel Backplane Replaced & Functional Test Completed + (08:22:02, 6 January 2025)
- IR 05000272/1990005 + (08:22:36, 6 January 2025)
- ML18094B401 + (08:22:38, 6 January 2025)
- ML18094B399 + (08:22:39, 6 January 2025)
- ML18094B398 + (08:22:41, 6 January 2025)
- TAC:69267 + (08:22:41, 6 January 2025)
- ML18094B396 + (08:22:43, 6 January 2025)
- ML18094B397 + (08:22:43, 6 January 2025)
- ML18094B395 + (08:22:44, 6 January 2025)
- ML18094B394 + (08:22:45, 6 January 2025)
- ML18094B393 + (08:22:47, 6 January 2025)
- ML18094B392 + (08:22:49, 6 January 2025)
- ML18094B391 + (08:22:51, 6 January 2025)