Grants 891120 Request for Withholding WCAP-12451, Safety Evaluation Supporting More Negative Eol Moderator Temp Coefficient Tech Spec for Salem Units 1 & 2 (Ref 10CFR2.790)
ML18094B416
Person / Time
Site: Salem  
Issue date: 04/09/1990
From: Stone J
Office of Nuclear Reactor Regulation
To: Wiesemann R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
TAC-76050, TAC-76051, NUDOCS 9004250002
Download: ML18094B416 (4)


Text

l

~.

c.'-~p.R REG(l(-1

.. *UNITED STATES

{'¥.~

.~0*1 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

~

(;'

't"/.

~

1-1;1

~o Docket Nos. 50-272 and 50-311 Mr. Robert A. Wiesemann, Manager Regulatory and Legisl~tive Affairs Westinghouse Electric Corporation P. 0. Box 355 Pittsburgh, Pennsylvania 15230-0355

Dear Mr. Wiesemann:

I

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSUR~

(TAC NOS. 76050 AND 76051)

RE:

SALEM GENERATING STATION, UNIT NOS. 1 AND 2 By your application and affidavit dated November 20, 1989, CAW-89-115, you submitted WCAP-1245J.,-asafety Evaluation Supporting a More Negative EOL Moderator Temperature Coefficient Technical Specification for the Salem Units 1 and 2," and requested that it be withheld from public disclo~ure pursuant to 10 CFR 2.790.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies,

2.

Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

We have reviewed your application and the material in accordance with the requir.ements of 1.0 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary conunercial information. Therefore, the version of the submitted information marked as proprietary*will be withheld.from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any,_of persons pro.perly and directed concerned to inspect the documents.

If tne-*need arises, we may send copies of this information to our consultants working in this area.

We will, of course, ensure that the consultants have signed the appropriate agreements for handling prop,rietary information.,

(

  • (lC!L.J.
    250002 f
    *f11=t:

r~DOCK p

9004-09

()5000272 PDC

~r. R. If the basis of withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

cc:

See next page Sincerely,

~~b James C.

Stone~ Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

"i

'.1 Mr. Robert W. Wiesemann We~tinghouse Electric Corporation cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generatino Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. La Bruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Co11111ission Drawer I Har.cocks Brid9e, NJ 08038 Dr. Ji 11 Li pot i, Ph. D New Jersey Department of Environmental Protection Division of Environmental Quality Radiation Protection Programs State of New Jersey CN 415 Trenton, NJ 08625 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., SlA-13 Wayne, PA 19087 Salem Nuclear Generating Station Richard B. McGlynn, Co111T1ission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I LJ. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation

~'uclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer.

MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Li~ht Company 800 King Street Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:

Chief Engi~eer 231 E. Baltimore Street Baltimore, MD 21202-3486 Mr. Steven E. Miltenberger Vice President and Chief Kuclear Officer Public Service Electric *and Gas C~any Post Office Box 236 Hancocks Bridge, NJ 08038

  • j I'

~**

v Mr. R. If the basis of withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

cc:

See next page DISTRIBUTION Docket Fi le NRC PDR Local PDR PDI-2 Reading SVarga BBoger WButler MO'Brien JS tone MThadani CHolzle, OGC RJones Sincerely, Isl James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation SRXB t9:<J RJones*~