Docket Nos. 50-272
50-311
EA No.
90-73
Public Service Electric and Gas Company
ATTN:
Mr. Steven E. Miltenberger
%0 APR 1990
Vice President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, New Jersey
08038
Gentlemen:
Subject: NRC Combined Inspection No. 50-272/90-12; 50-311/90-12
This letter transmits the findings of a special inspection conducted by Messrs.
T. P. Johnson, G. M. Tracy, S. T. Barr, and S. M. Pindale during the period
April 11 - 18, 1990, at the Salem Nuclear Generating Station.
The findings of
the special inspection were discussed with Mr. L. K. Miller of your staff at
the conclusion of the inspection.
The.inspection was conducted to review the circumstances surrounding the mis-
calculation of the safety injection pumps' flow rates in the emergency core
cooling system (ECCS) flow balance verification surveillance procedure.
The
miscalculation resulted in each unit being operated with the flow rates for one
of the two intermediate-head safety injectior pumps exceeding the maximum value
allowed by Technical Specifications.
Although the miscalculation was identified by your staff and reported to the
NRC, we note that a similar miscalculation, involving surveillances for the
high-head charging pumps, was identified by your staff in January 4, 1990.
The
January 4, 1990, event and your corrective actions were also reported to the
NRC (Reference LER No.90-002).
Your corrective actions for the previous event
indicated all similar surveillances were reviewed and no additional examples
were identified.
The identification of a second example of apparent failure to meet Technical
Specification ECCS surveillance requirements raises concerns about the adequacy
of your corrective actions for the previous event.
Consequently, we plan to
conduct an Enforcement Conference with you at the NRC Region I office in the
near future to discuss this matter .
9Q04300i7R 900420
~DR
ADOt~ 05000272
F'DC
OFFICIAL RECORD COPY
IR SALEM 90-12 - 0001.0.0
04/19/90 -::r:f a I'\\\\
Public Service Electric
and Gas Company
2
20 APR *1sso
.
.
At the conference you should be prepared to di_~cu_ss t_he. causes of the event,- -
-- --- --
your -corrective *act i Oris, -and the* sa.fety **5 i gnifi cance of the mi sea lc-ul ated ECCS
flow rates, including any potential broader implications. Additionally, y6u
should be prepared to discuss your corrective actions for the similar previous
event.
Following the conference, we will notify you of our decision regarding any
additional enforcement action.
Your cooperation with us is appreciated.
Sincerely,
William F. Kane, Director
Division of Reactor Projects
Enclosure:
NRC Combined Special Inspection Report 50-272/90-12; 50-311/90-12
cc w/encl:
Jack Urban, General Manager, Fuels Department, Delmarva Power &
Light Co.
S. LaBruna, Vice President - Nuclear Operations
_L. K. Miller, General Manager - Salem Operations.
B. A. Preston, Manager, Licensing and R~gulation
. General Manager, Nuclear Safety Review
M. J. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
S. Ungerer, Manager, Joint Generation Projects DepartmeMt,
Atlantic Electric
D. Wersan, Assistant Consumer Advocate, Office of Consumer
Advocate
J. T. Robb, direct6r, Joint Owner Affairs, Philadelphia Electric
. Co.
J. Lipot, State of New Jersey
J. H. Walter, Chief Engineer, Public Service Commission of
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFICIAL RECORD COPY
IR SALEM 90-12 - 0002.0.0
04/18/90
Public Service Electric
and Gas Company
bee w/encl:
Region I Docket Room-(with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
3
2 0 APR 1990
S. Barber, Senior Resident Inspector, Susquehanna
R. Bellamy, DRSS
TI Coordinator, DRP
J. Stone, NRR Project Manager
R. J. Kiessel, NRR
J. Dyer, EDD
R. Nimitz, DRSS
J. Durr, RI
D. Holody
J. Lieberman, OE
J. Goldberg, OGC
J. Partlow, NRR
~
GT racy
1'9~ yor (ii
4/iti /90
RI:DRP
s~
4/ 11/90
RI:DRP
TJohnson
~
4/it£ /90
OFFICIAL RECORD COPY
RI:DRP
RN.J.m:i,tz
~)
4/f'?./90
~RI: DRP ~tDRP
RBlough
WKane
4~90 4;l-0;90
IJ
IR SALEM 90-12 - 0003.0.0
04/18/90