Forwards Insp Repts 50-272/90-12 & 50-311/90-12 on 900411-18.Violations Re Miscalculation of Safety Injection Pumps Flow Rates in ECCS Flow Balance Verification Surveillance Procedure Noted But Not Cited
ML18094B428
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/20/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18094B429 List:
References
EA-90-073, EA-90-73, NUDOCS 9004300178
Download: ML18094B428 (3)


See also: IR 05000272/1990012

Text

Docket Nos. 50-272

50-311

EA No.

90-73

Public Service Electric and Gas Company

ATTN:

Mr. Steven E. Miltenberger

%0 APR 1990

Vice President and Chief Nuclear Officer

P.O. Box 236

Hancocks Bridge, New Jersey

08038

Gentlemen:

Subject: NRC Combined Inspection No. 50-272/90-12; 50-311/90-12

This letter transmits the findings of a special inspection conducted by Messrs.

T. P. Johnson, G. M. Tracy, S. T. Barr, and S. M. Pindale during the period

April 11 - 18, 1990, at the Salem Nuclear Generating Station.

The findings of

the special inspection were discussed with Mr. L. K. Miller of your staff at

the conclusion of the inspection.

The.inspection was conducted to review the circumstances surrounding the mis-

calculation of the safety injection pumps' flow rates in the emergency core

cooling system (ECCS) flow balance verification surveillance procedure.

The

miscalculation resulted in each unit being operated with the flow rates for one

of the two intermediate-head safety injectior pumps exceeding the maximum value

allowed by Technical Specifications.

Although the miscalculation was identified by your staff and reported to the

NRC, we note that a similar miscalculation, involving surveillances for the

high-head charging pumps, was identified by your staff in January 4, 1990.

The

January 4, 1990, event and your corrective actions were also reported to the

NRC (Reference LER No.90-002).

Your corrective actions for the previous event

indicated all similar surveillances were reviewed and no additional examples

were identified.

The identification of a second example of apparent failure to meet Technical

Specification ECCS surveillance requirements raises concerns about the adequacy

of your corrective actions for the previous event.

Consequently, we plan to

conduct an Enforcement Conference with you at the NRC Region I office in the

near future to discuss this matter .

9Q04300i7R 900420

~DR

ADOt~ 05000272

F'DC

OFFICIAL RECORD COPY

IR SALEM 90-12 - 0001.0.0

04/19/90 -::r:f a I'\\\\

Public Service Electric

and Gas Company

2

20 APR *1sso

.

.

At the conference you should be prepared to di_~cu_ss t_he. causes of the event,- -

-- --- --

your -corrective *act i Oris, -and the* sa.fety **5 i gnifi cance of the mi sea lc-ul ated ECCS

flow rates, including any potential broader implications. Additionally, y6u

should be prepared to discuss your corrective actions for the similar previous

event.

Following the conference, we will notify you of our decision regarding any

additional enforcement action.

Your cooperation with us is appreciated.

Sincerely,

William F. Kane, Director

Division of Reactor Projects

Enclosure:

NRC Combined Special Inspection Report 50-272/90-12; 50-311/90-12

cc w/encl:

Jack Urban, General Manager, Fuels Department, Delmarva Power &

Light Co.

S. LaBruna, Vice President - Nuclear Operations

_L. K. Miller, General Manager - Salem Operations.

B. A. Preston, Manager, Licensing and R~gulation

. General Manager, Nuclear Safety Review

M. J. Wetterhahn, Esquire

R. Fryling, Jr., Esquire

S. Ungerer, Manager, Joint Generation Projects DepartmeMt,

Atlantic Electric

D. Wersan, Assistant Consumer Advocate, Office of Consumer

Advocate

J. T. Robb, direct6r, Joint Owner Affairs, Philadelphia Electric

. Co.

J. Lipot, State of New Jersey

J. H. Walter, Chief Engineer, Public Service Commission of

Maryland

Lower Alloways Creek Township

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

OFFICIAL RECORD COPY

IR SALEM 90-12 - 0002.0.0

04/18/90

Public Service Electric

and Gas Company

bee w/encl:

Region I Docket Room-(with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

3

2 0 APR 1990

S. Barber, Senior Resident Inspector, Susquehanna

R. Bellamy, DRSS

TI Coordinator, DRP

J. Stone, NRR Project Manager

R. J. Kiessel, NRR

J. Dyer, EDD

R. Nimitz, DRSS

J. Durr, RI

D. Holody

J. Lieberman, OE

J. Goldberg, OGC

J. Partlow, NRR

~

GT racy

1'9~ yor (ii

4/iti /90

RI:DRP

s~

4/ 11/90

RI:DRP

TJohnson

~

4/it£ /90

OFFICIAL RECORD COPY

RI:DRP

RN.J.m:i,tz

~)

4/f'?./90

~RI: DRP ~tDRP

RBlough

WKane

4~90 4;l-0;90

IJ

IR SALEM 90-12 - 0003.0.0