Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JPN-93-025, Forwards Revised Station Battery Capacity Calculations & Evaluation of Operator SBO Procedure for Agreement W/Numarc 87-00.EDG Reliability Program & Reg Guide 1.155 Will Be Implemented by 930930 + (06:33:14, 6 January 2025)
- ML18100B280 + (06:33:31, 6 January 2025)
- ML18100B279 + (06:33:33, 6 January 2025)
- 05000271/LER-1992-016, :on 920422,discovered That TS Quarterly Flow Test Not Performed During safety-related HVAC Sys Surveillance of Chilled Water Pump.Caused by Personnel Error.Procedure Re Ref Valves Revised + (06:33:37, 6 January 2025)
- 05000271/LER-1992-015, :on 920424,RCIC Sys Declared Inoperable When Sys Flow Controller Meter Indicated Approx 30 Gpm Flow W/ RCIC Not Operating.Caused by Setpoint Drift.Work Orders Initiated to Correct Meter Indication + (06:33:42, 6 January 2025)
- ML18100B271 + (06:33:44, 6 January 2025)
- ML18100B268 + (06:33:52, 6 January 2025)
- ML18100B267 + (06:33:55, 6 January 2025)
- ML18100B266 + (06:33:56, 6 January 2025)
- ML18100B265 + (06:33:59, 6 January 2025)
- ML18100B263 + (06:34:01, 6 January 2025)
- ML18100B262 + (06:34:02, 6 January 2025)
- ML18100B251 + (06:34:03, 6 January 2025)
- ML18100B250 + (06:34:04, 6 January 2025)
- IR 05000272/1994201 + (06:34:07, 6 January 2025)
- IR 05000272/1994017 + (06:34:11, 6 January 2025)
- ML18100B246 + (06:34:13, 6 January 2025)
- IR 05000272/1994015 + (06:34:17, 6 January 2025)
- ML18100B243 + (06:34:20, 6 January 2025)
- ML18100B239 + (06:34:21, 6 January 2025)
- 05000311/LER-1994-008-02, :on 940629,reactor Trip Occurred Due to SG 23 lo-lo Level During Return to on-line Power Operation. Operability Checks & Troubleshooting of SG Level Control Verified Proper Response + (06:34:25, 6 January 2025)
- ML18100B237 + (06:34:27, 6 January 2025)
- IR 05000272/1994008 + (06:34:29, 6 January 2025)
- ML18100B234 + (06:34:31, 6 January 2025)
- ML18100B232 + (06:34:32, 6 January 2025)
- ML18100B231 + (06:34:33, 6 January 2025)
- ML18100B195 + (06:34:54, 6 January 2025)
- ML18100B181 + (06:35:15, 6 January 2025)
- ML18100B227 + (06:34:34, 6 January 2025)
- ML18100B225 + (06:34:35, 6 January 2025)
- ML18100B221 + (06:34:36, 6 January 2025)
- ML18100B219 + (06:34:37, 6 January 2025)
- ML18100B216 + (06:34:39, 6 January 2025)
- ML18100B210 + (06:34:41, 6 January 2025)
- ML18100B206 + (06:34:46, 6 January 2025)
- ML18100B205 + (06:34:47, 6 January 2025)
- ML18100B204 + (06:34:48, 6 January 2025)
- ML18100B202 + (06:34:49, 6 January 2025)
- ML18100B191 + (06:35:07, 6 January 2025)
- ML18100B187 + (06:35:08, 6 January 2025)
- ML18100B186 + (06:35:09, 6 January 2025)
- ML18100B183 + (06:35:13, 6 January 2025)
- ML18100B182 + (06:35:14, 6 January 2025)
- ML18100B175 + (06:35:21, 6 January 2025)
- ML18100B171 + (06:35:25, 6 January 2025)
- ML18100B169 + (06:35:28, 6 January 2025)
- ML18100B161 + (06:35:39, 6 January 2025)
- 05000311/LER-1993-011, :on 931019,RMS Channels 2R13 A,B,C Were Inoperable Due to Efficiency Being Adjusted to Reduced Level.Implemented Design Changes & 2R13 A,B, & C Were Calibrated & Returned to Service + (06:35:42, 6 January 2025)
- ML18100B158 + (06:35:44, 6 January 2025)
- 05000272/LER-1994-008, :on 900828,determined That Several Channel Functional Testing for Both Units May Have Been Performed Late Due to Personnel Error.Surveillance Procedure Has Been Revised + (06:35:48, 6 January 2025)
- ML18100B156 + (06:35:53, 6 January 2025)