Text
- 9 Public Service Electric and Gas Company Joseph J. Hagan Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations NLR-N94111 LCR 94-05 JUL 1 5 1994 United States Nuclear Regulatory commission Document Control Desk Washington, DC 20555 Gentlemen:
REVISION TO REQUEST FOR AMENDMENT EMERGENCY DIESEL GENERATOR HOT RESTART TEST SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 The purpose of this letter is to modify Public Service Electric and Gas Company's (PSE&G's) request for license amendment for the Salem Generating Station (SGS), dated April 12, 1994.
The original amendment request would have, in part, required the hot restart test to be performed within 5 minutes of a minimum of one hour of operation at full load.
The present Technical Specifications require the hot restart test to be performed within 5 minutes of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run.
PSE&G hereby amends the proposed change to require a minimum two hour run at full load prior to the hot restart test.
The April 12, 1994 amendment request is based on the improved Standard Technical Specifications (NUREG-1431).
The Stqndard Technical Specifications denote plant-specific parameters by enclosing a representative value in brackets.
Per NUREG-1431, the hot restart test is to be performed "within 5 minutes of shutting down the DG after the DG has operated~ [2] hours..* "
As stated in the NUREG-1431 Bases, "the requirement that the diesel has operated for at least [2] hours at full load' conditions prior to the performance of this Surveillance is based on manufacturer recommendations for achieving hot conditions."
PSE&G does not have specific recommendations from the SGS diesel manufacturer.relative to achieving hot conditions.
As described in our original amendment request dated April 12, 1994, test data at SGS show that engine operating temperatures and generator stator and bearing temperatures reach steady state *after approximately 45 minutes of operation at a given generator load.
This was used as the basis for the one hour requirement in the original amendment request.
However, NRC staff have indicated that the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> value in NUREG-1431 is based on a consensus reached between NRC staff and diesel engine manufacturers.
PSE&G
.f\\O\\)\\ I-\\
Document control Desk NLR-N94111 JUL 1 51994 agrees to amend the prerequisite test to a minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to facilitate approval of the amendment request. contains the affected Technical Specification pages from the April 12, 1994 amendment request, revised to reflect the change proposed herein. This change does not affect our determination of No Significant Hazards Consideration in the April 12, 1994 amendment request.
Attachment Affidavit sincerely, c
Mr. T. T. Martin, Administrator - Region I U. s. Nuclear Regulatory Commission 475 Allendale Road King of Pr~ssia, PA 19406 Mr. J.* c. Stone, Licensing Project Manager -
Salem
- u. s. Nuqlear Regulatory Commission One White Flint North*
11555 Rockville Pike Rockville, MD 20852 Mr. C. Marschall (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
REF: NLR-N94111 STATE OF NEW JERSEY SS.
COUNTY OF SALEM J. J. Hagan, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.
Subscri:bed and Swor
- st!-\\
My Commission expires on me 1994 KIMBERLY JO BROWN NOTARY PUBLIG OF NEW JERSEY My Commission Expires April 21, 1998
-1 NLR-N94111 ATTACHMENT 1