Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211E918 + (04:37:08, 6 December 2024)
- ML20211E914 + (04:37:11, 6 December 2024)
- ML20211E913 + (04:37:12, 6 December 2024)
- ML20211E912 + (04:37:12, 6 December 2024)
- ML20211E911 + (04:37:13, 6 December 2024)
- 05000334/LER-1997-028, :on 970825,SFP Crane Interlocks & Physical Stops Were Not Tested Prior to Use IAW Ts.Caused by Procedures,Program/Process/Equipment Labeling & Training/ Qualification.Performed Surveillance Test + (04:37:16, 6 December 2024)
- ML20211E905 + (04:37:17, 6 December 2024)
- AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests + (04:37:20, 6 December 2024)
- ML20211E903 + (04:37:21, 6 December 2024)
- IR 05000445/1986025 + (04:37:22, 6 December 2024)
- 05000373/LER-1986-021, :on 860608,ESF Damper Actuated.Caused by Spurious Trip on High Radiation Monitor/Detector 2D18-K751D Due to Apparent Bad Connector from Indicator Relay.Detector Observed.No Further Problems Noted + (04:37:24, 6 December 2024)
- ML20211E899 + (04:37:25, 6 December 2024)
- ML20211E898 + (04:37:26, 6 December 2024)
- ML20211E896 + (04:37:27, 6 December 2024)
- IR 05000341/1999013 + (04:37:28, 6 December 2024)
- ML20211E894 + (04:37:29, 6 December 2024)
- IR 05000293/1986040 + (04:37:33, 6 December 2024)
- ML20211E889 + (04:39:06, 6 December 2024)
- ML20211E890 + (04:39:06, 6 December 2024)
- ML20211E885 + (04:39:09, 6 December 2024)
- ML20211E884 + (04:39:10, 6 December 2024)
- ML20211E881 + (04:39:15, 6 December 2024)
- ML20211E879 + (04:39:16, 6 December 2024)
- AECM-86-0331, Application for Amend to License NPF-29,revising Tech Specs to Delete 2 Minute Time & Temp Limits Associated W/Stuck Open Safety/Relief Valves,Adding Smoke Detectors & Reflecting Changes Re RCIC Turbine Bypass Valve.Fee Paid + (04:39:17, 6 December 2024)
- ML20211E877 + (04:39:17, 6 December 2024)
- IR 05000285/1987001 + (04:39:19, 6 December 2024)
- ML20211E873 + (04:39:22, 6 December 2024)
- ML20211E871 + (04:39:23, 6 December 2024)
- ML20211E868 + (04:39:24, 6 December 2024)
- ML20211E864 + (04:39:24, 6 December 2024)
- ML20211E863 + (04:39:25, 6 December 2024)
- ML20211E860 + (04:39:26, 6 December 2024)
- ML20211E861 + (04:39:26, 6 December 2024)
- ST-HL-AE-1677, Final Deficiency Rept Re Rotated Locknuts on safety-related Cable Tray Support Connections.Initially Reported on 860310. Discrepancies in Alignment & Engagement of Locknuts Corrected.Item Not Reportable Per 10CFR50.55(e) + (04:39:27, 6 December 2024)
- ML20211E857 + (04:39:28, 6 December 2024)
- ML20211E856 + (04:39:28, 6 December 2024)
- ML20211E854 + (04:39:29, 6 December 2024)
- ML20211E855 + (04:39:29, 6 December 2024)
- 3F1086-13, Supplemental Application for Amend to License DPR-72, Incorporating Rev 3 to Change Request 103,to Revise Tech Specs Re Administrative Controls + (04:39:30, 6 December 2024)
- ML20211E852 + (04:39:31, 6 December 2024)
- 05000245/LER-1997-035-01, :on 970826,ECCS Actuation LCO Was Not Met. Caused by Human Error (Technical Oversight) When Interlock Was Added to Ts.Performed Review to Determine Whether Containment Spray Interlock Should Be Controlled in TS + (04:39:34, 6 December 2024)
- ML20211E848 + (04:39:36, 6 December 2024)
- ML20211E850 + (04:39:36, 6 December 2024)
- BECO-86-162, Forwards Corrected Table 4.1.1, Reactor Protection Sys (Scram) Instrumentation Functional Tests Min Functional Test Frequencies for Safety Instrumentation & Control Circuits, for 860227 Proposed Tech Spec Change Re Analog Trip Sys + (04:39:40, 6 December 2024)
- ML20211E843 + (04:39:40, 6 December 2024)
- ML20211E841 + (04:39:41, 6 December 2024)
- ML20211E839 + (04:39:42, 6 December 2024)
- ML20211E837 + (04:39:42, 6 December 2024)
- 05000263/LER-1986-012, :on 860508 Five Penetrations of Transversing in-core Probe Sys Omitted from double-gasket Seal Testing Procedure.Procedure Revised.Penetrations Tested & Drawings Reviewed + (04:39:44, 6 December 2024)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided + (04:39:45, 6 December 2024)
- IR 05000353/1986021 + (04:39:47, 6 December 2024)