Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211H350 + (04:11:21, 6 December 2024)
- ML20211H349 + (04:11:22, 6 December 2024)
- ML20211H346 + (04:11:26, 6 December 2024)
- ML20211H345 + (04:11:27, 6 December 2024)
- 05000318/LER-1986-004, :on 860521 & 27,reactor Manually Tripped from 100% Power Due to Low Steam Generator Water Level. Caused by Erroneous Control Signal from Double Ground. Grounded Components Repaired + (04:11:29, 6 December 2024)
- ML20211H340 + (04:11:30, 6 December 2024)
- B12416, Discusses Implementation Status of App R Mods Required by Current App R Fire Protection Analysis.All Nonoutage Mods Completed & Remaining Mods to Be Completed Prior to End of 1987/1988 Refueling Outage + (04:11:31, 6 December 2024)
- ML20211H333 + (04:11:32, 6 December 2024)
- ML20211H334 + (04:11:32, 6 December 2024)
- ML20211H332 + (04:11:33, 6 December 2024)
- TXX-6282, Final Deficiency Rept CP-86-66 Re Noncontact Lap Splices in Auxiliary Bldg.Initially Reported on 860926.Engineering Calculations & Review of Applicable Quality Documents Completed.Issue Not Reportable Per 10CFR50.55(e) + (04:11:34, 6 December 2024)
- HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested + (04:11:35, 6 December 2024)
- ML20211H322 + (04:11:36, 6 December 2024)
- ML20211H321 + (04:11:36, 6 December 2024)
- TXX-6291, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Resolution of Open QC Insp Items Continuing & Scheduled for Completion by 870630.Next Rept Will Be Submitted by 870721 + (04:11:37, 6 December 2024)
- ML20211H315 + (04:11:38, 6 December 2024)
- ML20211H312 + (04:11:38, 6 December 2024)
- 05000458/LER-1986-057, :on 860923,during Surveillance Test Procedure STP-207-4210,RCWU Sys Isolated.Caused by Inadvertent Grounding of Electrical Jumper Resulting in Blown Fuse.Fuse Replaced.Rcwu Isolation Reset + (04:11:40, 6 December 2024)
- 05000338/LER-1986-008-02, :on 860520,reactor Trip Occurred Due to Closure of All Three Main Feedwater Regulating Valves.Caused by Spurious Actuation of Feedwater Isolation Relay for Feedwater Regulating Valves + (04:11:42, 6 December 2024)
- L-86-491, Forwards Comments on Exam Administered on 861117.Attachment Suppls & Replaces Comments Provided at 861120 Exam Exit Meeting & Contained in Util + (04:11:43, 6 December 2024)
- ML20211H308 + (04:11:44, 6 December 2024)
- 05000250/LER-1987-005, :on 870119,w/unit in Mode 2,control Room Ventilation Isolated & Switched to Recirculation Mode & Containment Vent Isolated.Caused by Process Radiation Monitor Spike.Equipment Being Evaluated + (04:11:45, 6 December 2024)
- 05000220/LER-1986-013, :on 860518,reactor Bldg Emergency Ventilation Sys Initiated Due to Blown Fuse.Caused by Damaged Timer Relay.Timer Repaired,Fuse Replaced & Sys Returned to Svc.W/ + (04:11:47, 6 December 2024)
- ML20211H302 + (04:11:49, 6 December 2024)
- ML20211H299 + (04:11:49, 6 December 2024)
- ML20211H298 + (04:11:50, 6 December 2024)
- ML20211H291 + (04:11:51, 6 December 2024)
- ML20211H294 + (04:11:51, 6 December 2024)
- ML20211H290 + (04:11:52, 6 December 2024)
- ML20211H288 + (04:11:53, 6 December 2024)
- ML20211H287 + (04:11:53, 6 December 2024)
- ML20211H286 + (04:11:54, 6 December 2024)
- ML20211H284 + (04:11:55, 6 December 2024)
- ST-HL-AE-1919, Forwards Revised FSAR Table 3.11-1, Environ Conditions, Incorporating Revs to Bechtel Design Criteria & Results of Calculation Verification.Revised Table Will Be Incorporated as Part of Amend 58 to FSAR + (04:11:55, 6 December 2024)
- ML20211H282 + (04:11:56, 6 December 2024)
- 05000312/LER-1987-010, :on 870119,electrical Configuration for RCS High Point Valves Found in Noncompliance w/10CFR50,App R. Caused by Inadequate Assessment of Hot Short Effects.Design of Valves Will Be Modified,Per 10CFR50,App R + (04:11:58, 6 December 2024)
- B12284, Application for Amend to License DPR-65,providing Limiting Conditions & Surveillance Requirements in Accordance W/ NUREG-0737 & Generic Ltr 83-37.Fee Paid + (04:11:59, 6 December 2024)
- ML20211H274 + (04:12:00, 6 December 2024)
- ML20211H273 + (04:12:01, 6 December 2024)
- ST-HL-AE-1858, Forwards Vols 1-3 of Electrical Separation Verification Test Rept... Used by Wyle Labs to Demonstrate That Sys Test Procedure in Compliance W/Requirements of Reg Guide 1.75,per SER Open Item 9 + (04:12:02, 6 December 2024)
- ML20211H268 + (04:12:03, 6 December 2024)
- ML20211H266 + (04:12:05, 6 December 2024)
- ML20211H264 + (04:12:06, 6 December 2024)
- ML20211H257 + (04:12:07, 6 December 2024)
- ML20211H258 + (04:12:07, 6 December 2024)
- 05000263/LER-1986-014, :on 860515,reactor Protection Sys Trip Occurred.Caused by Noise Spike on Intermediate power- Range Monitor 14 Tripping Channel a of Reactor Protection Sys.Channel a Trip Reset + (04:12:09, 6 December 2024)
- ML20211H252 + (04:12:10, 6 December 2024)
- ML20211H251 + (04:12:12, 6 December 2024)
- ML20211H248 + (04:12:13, 6 December 2024)
- ML20211H249 + (04:12:13, 6 December 2024)
- A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 + (04:12:14, 6 December 2024)
- ST-HL-AE-1705, Submits Revised Response to IE Bulletin 77-07, Containment Electrical Penetration Assemblies at Nuclear Power Plants Under Const. Util Electrical Penetration Suppliers Are Westinghouse & Conax Buffalo Corp + (04:12:15, 6 December 2024)