Forwards Insp Repts 50-456/86-03 & 50-457/86-03 on 850109- 860306.No Violation Noted
ML20211H258
Person / Time
Site: Braidwood  
Issue date: 06/09/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211H263 List:
References
NUDOCS 8606230425
Download: ML20211H258 (2)


See also: IR 05000456/1986003

Text

h/

TH{

~

/

-

o

JUN - 9 1986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special inspection conducted by Messrs. R. Gardner, R. Mendez,

and Z. Falevits of this office on January 9, 13, and 17, February 25, 26, and

March 5, 6, 1986, of Braidwood Construction Assessment Program (BCAP) activities

at Braidwood Station, Units 1 and 2, authorized by NRC Construction Permit

No. 132 and No. 133 and to the discussion of our findings with Mr. C. Schroeder

and others of your staff at the conclusion of the inspection.

The purpose of

this report is to document the Region III actions taken to assure that the

Braidwood Construction Assessment Program (BCAP) was properly carried out and

to~ document the Region III review and evaluation of the final " Report on the

Braidwood Construction Assessment Program (BCAP)," dated November, 1985

submitted by Commonwealth Edison Company (CECO).

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Based on the results of all Region III activities and inspections referenced in

the attached report, we conclude that the BCAP was satisfactorily completed in

accordance with programmatic and procedural requirea nts.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

8606230425 860609

DR

ADOCK 05000456

PDR

z!y

- - - - - -

fh

~

/

/

JUN . 9 1986

Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Charles E. Norelius, Director

Division of Reactor Projects

Enclosure:

Inspection Reports

No. 50-456/86003(DRP);

No. 50-457/86003(DRP)

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

.

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR_ _.._...

The' Honorable Herbert Grossman,, ASLB .,,

_ . .

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

rih

h

RI I

RIII

RIII

RIIJ

RIII

RIII

Gar (dner/kst%lf

> f) A

gA

153

M

tD

'

Pelke Muffett Mendez L'tt e

ar ison Pape, ello KoYd us

MM

I Pb $lG iu 5/// /M

f5 )k

(I S

/*N '

copy

t

'