Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211J100 + (04:04:19, 6 December 2024)
- ML20211J098 + (04:04:23, 6 December 2024)
- ML20211J099 + (04:04:23, 6 December 2024)
- ML20211J096 + (04:04:24, 6 December 2024)
- ML20211J095 + (04:04:25, 6 December 2024)
- JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (04:04:26, 6 December 2024)
- ML20211J091 + (04:04:26, 6 December 2024)
- ML20211J088 + (04:04:28, 6 December 2024)
- 05000395/LER-1999-010, :on 990730,discovered That UHS Dependent Components Were Potentially Outside Design Basis of Plant. Caused Indeterminate.Blank Flanges Were Subsequently Not Reinstalled.With + (04:04:29, 6 December 2024)
- ML20211J083 + (04:04:35, 6 December 2024)
- ML20211J082 + (04:04:36, 6 December 2024)
- ML20211J079 + (04:04:36, 6 December 2024)
- ML20211J078 + (04:04:37, 6 December 2024)
- ML20211J075 + (04:04:41, 6 December 2024)
- ML20211J074 + (04:04:41, 6 December 2024)
- TAC:M96803 + (04:04:42, 6 December 2024)
- L-86-130, Advises That Inservice Insp Summary Rept Will Not Be Completed by Required Schedule.Three back-to-back Refueling Outages & Upcoming Outage Have Diverted Manpower to outage- Related Activities.Rept Will Be Forwarded by 860430 + (04:04:43, 6 December 2024)
- ML20211J072 + (04:04:43, 6 December 2024)
- ML20211J068 + (04:04:44, 6 December 2024)
- ML20211J066 + (04:04:44, 6 December 2024)
- ML20211J065 + (04:04:45, 6 December 2024)
- ML20211J063 + (04:04:45, 6 December 2024)
- ML20211J062 + (04:04:46, 6 December 2024)
- ML20211J061 + (04:04:47, 6 December 2024)
- ML20211J060 + (04:04:47, 6 December 2024)
- ML20211J056 + (04:04:48, 6 December 2024)
- 05000206/LER-1999-001-02, :on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension + (04:04:50, 6 December 2024)
- ML20211J053 + (04:04:51, 6 December 2024)
- ML20211J049 + (04:04:52, 6 December 2024)
- ML20211J052 + (04:04:52, 6 December 2024)
- U-600750, Final Deficiency Rept 55-86-05 Re Unsealed Gaps in 3 H Rated Fire Wall.Initially Reported on 860717.Maint Standing Orders 23 & 25 Issued to Identify Mechanism for Proper Control of Fire Seals & to Eliminate Future Seal Violations + (04:04:53, 6 December 2024)
- 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 + (04:04:54, 6 December 2024)
- ML20211J044 + (04:04:55, 6 December 2024)
- ML20211J043 + (04:04:55, 6 December 2024)
- ML20211J040 + (04:04:56, 6 December 2024)
- ML20211J041 + (04:04:56, 6 December 2024)
- ML20211J038 + (04:04:57, 6 December 2024)
- ML20211J037 + (04:04:58, 6 December 2024)
- ML20211J036 + (04:04:59, 6 December 2024)
- ML20211J031 + (04:05:00, 6 December 2024)
- ML20211J032 + (04:05:00, 6 December 2024)
- BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp + (04:05:01, 6 December 2024)
- ML20211J025 + (04:05:03, 6 December 2024)
- ML20211J022 + (04:05:04, 6 December 2024)
- ML20211J023 + (04:05:04, 6 December 2024)
- ML20211J021 + (04:05:05, 6 December 2024)
- ML20211J016 + (04:05:06, 6 December 2024)
- ML20211J019 + (04:05:06, 6 December 2024)
- ML20211J014 + (04:05:07, 6 December 2024)
- BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution + (04:05:08, 6 December 2024)
- TXX-6089, Responds to NRC Re Violations Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Corrective Actions:Design Change Authorization 18,016 Revised to Delete Specifics Re Wire Size Reduction.Engineering Evaluation Performed + (04:05:08, 6 December 2024)