Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 57447 + (12:20:07, 5 December 2024)
- ENS 57452 + (12:20:09, 5 December 2024)
- ENS 57448 + (12:20:09, 5 December 2024)
- ENS 57446 + (12:20:12, 5 December 2024)
- ENS 57435 + (12:20:25, 5 December 2024)
- ENS 57444 + (12:20:25, 5 December 2024)
- ENS 57445 + (12:20:26, 5 December 2024)
- ML20212C076 + (12:46:52, 5 December 2024)
- ML20212C072 + (12:46:52, 5 December 2024)
- 3F0999-07, Application for Amend to License DPR-72,to Change ITS Proposed in LAR 239,rev 0,increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revise Configuration for Storage of Fresh Fuel.Proprietary Encl Withheld + (12:46:53, 5 December 2024)
- BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With + (12:46:56, 5 December 2024)
- ML20212C063 + (12:46:57, 5 December 2024)
- ML20212C060 + (12:46:58, 5 December 2024)
- ML20212C061 + (12:46:58, 5 December 2024)
- ML20212C059 + (12:46:59, 5 December 2024)
- IR 05000272/1987002 + (12:47:00, 5 December 2024)
- ML20212C056 + (12:47:01, 5 December 2024)
- ML20212C053 + (12:47:02, 5 December 2024)
- ML20212C055 + (12:47:02, 5 December 2024)
- ML20212C052 + (12:47:03, 5 December 2024)
- ML20212C051 + (12:47:04, 5 December 2024)
- ML20212C049 + (12:47:05, 5 December 2024)
- 05000482/LER-1999-009, :on 990811,discovered That Inadequate Fire Separation Could Result in Loss of Charging Water Capability.Caused by Several Unvalidated Engineering Judgements Re Safe Shutdown Equipment.Revised Procedures + (12:47:12, 5 December 2024)
- ML20212C045 + (12:47:14, 5 December 2024)
- 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief + (12:47:17, 5 December 2024)
- ML20212C040 + (12:47:18, 5 December 2024)
- IR 05000346/1986031 + (12:47:22, 5 December 2024)
- ML20212C038 + (12:47:23, 5 December 2024)
- ML20212C033 + (12:47:24, 5 December 2024)
- ML20212C032 + (12:47:25, 5 December 2024)
- ML20212C030 + (12:47:26, 5 December 2024)
- ML20212C028 + (12:47:27, 5 December 2024)
- ML20212C027 + (12:47:27, 5 December 2024)
- ML20212C026 + (12:47:28, 5 December 2024)
- LIC-97-0172, Submits Comments on Technical Review of Draft Info Notice Re Extraction Steam Pipe Rupture at Plant + (12:47:29, 5 December 2024)
- ML20212C023 + (12:47:29, 5 December 2024)
- ML20212C021 + (12:47:30, 5 December 2024)
- IR 05000333/1986021 + (12:47:34, 5 December 2024)
- ML20212C016 + (12:47:35, 5 December 2024)
- IR 05000348/1999005 + (12:47:36, 5 December 2024)
- ML20212C013 + (12:47:37, 5 December 2024)
- ML20212C009 + (12:47:37, 5 December 2024)
- ML20212C006 + (12:47:38, 5 December 2024)
- ML20212C007 + (12:47:38, 5 December 2024)
- IR 05000213/1986030 + (12:47:43, 5 December 2024)
- NRC-99-0080, Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide in Emergency Plans.Detroit Edison Strongly Urges NRC to Not Issue Amend to 10CFR50.47 + (12:47:44, 5 December 2024)
- PNO-III-86-150, on 861218,licensee Entered Mode 4 from Mode 3 to Investigate 861215 Failure of MSIV to Close Per Tech Specs.Leak in Pressurizer Level Sensing Line Isolation Valve Will Be Repaired.Investigation Continuing + (12:47:45, 5 December 2024)
- ML20212C003 + (12:47:45, 5 December 2024)
- ML20212C000 + (12:47:46, 5 December 2024)
- ML20212B999 + (12:47:47, 5 December 2024)
- ML20212B996 + (12:47:47, 5 December 2024)