Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19242D211 + (18:16:06, 4 January 2025)
- 05000254/LER-1979-023-03, /03L-0 on 790717:high Pressure Switch in Safety Relief Valve Controller Found Inoperable During Reactor High Pressure Automatic Blowdown Functional test,QIS-40.Caused by Loosened Lead Wire from Switch to Terminal + (18:16:09, 4 January 2025)
- ML19242D209 + (18:16:35, 4 January 2025)
- ML19242D208 + (18:16:36, 4 January 2025)
- ML19242D206 + (18:16:37, 4 January 2025)
- ML19242D205 + (18:16:38, 4 January 2025)
- ML19242D203 + (18:16:39, 4 January 2025)
- ML19242D202 + (18:16:40, 4 January 2025)
- 05000254/LER-1979-023, Forwards LER 79-023/03L-0 + (18:16:43, 4 January 2025)
- ML19242D199 + (18:16:51, 4 January 2025)
- ML19242D198 + (18:16:52, 4 January 2025)
- ML19242D196 + (18:16:54, 4 January 2025)
- 05000348/LER-1979-029-03, /03L-0 on 790713:penetration Room Filtration Sys Trains a & B Inoperable.Caused by Train B Exhaust Fan Not Starting & Train a Suction Damper Not Opening.Overload Reset & Fuse Replaced + (18:16:57, 4 January 2025)
- ML19242D191 + (18:16:58, 4 January 2025)
- ML19242D189 + (18:16:59, 4 January 2025)
- ML19242D188 + (18:17:00, 4 January 2025)
- ML19242D187 + (18:17:02, 4 January 2025)
- 05000029/LER-1979-018-01, /01T-0 on 790727:informed of Deviation from Specified Value in Fuel Pin Pressure.Caused by Mfg Techniques.Mfg Changed Method of Prepressurization Employed at Fabrication Facility + (18:17:04, 4 January 2025)
- ML19242D185 + (18:17:06, 4 January 2025)
- ML19242D183 + (18:17:07, 4 January 2025)
- 05000348/LER-1979-029, Forwards LER 79-029/03L-0 + (18:17:08, 4 January 2025)
- 05000029/LER-1979-018, Forwards LER 79-018/01T-0 + (18:17:11, 4 January 2025)
- ML19242D177 + (18:17:12, 4 January 2025)
- 05000271/LER-1979-014-03, /03L-0 on 790712:during Surveillance Testing of Drywell to Torus Vacuum Breakers,Loss of Containment Air Monitor Occurred.Caused by Corrosion Seizure of Vanes.Spare Pump Was Installed & Failed Pump Repaired + (18:17:14, 4 January 2025)
- ML19242D174 + (18:17:16, 4 January 2025)
- 05000271/LER-1979-014, Forwards LER 79-014/03L-0 + (18:17:17, 4 January 2025)
- ML19242D167 + (18:17:19, 4 January 2025)
- ML19242D162 + (18:17:20, 4 January 2025)
- ML19242D161 + (18:17:20, 4 January 2025)
- ML19242D160 + (18:17:21, 4 January 2025)
- ML19242D159 + (18:17:22, 4 January 2025)
- ML19242D157 + (18:17:22, 4 January 2025)
- ML19242D156 + (18:17:23, 4 January 2025)
- ML19242D155 + (18:17:24, 4 January 2025)
- ML19242D153 + (18:17:25, 4 January 2025)
- ML19242D152 + (18:17:25, 4 January 2025)
- ML19242D151 + (18:17:26, 4 January 2025)
- 05000295/LER-1979-050-01, /01T-0 on 790713:Westinghouse Reported Potential Problem Involving Inaccuracies in Steam Generator Level Indication Following Feedwater Line Break Inside Containment.Vendor Suggests Raising Setpoint by 10% + (18:17:28, 4 January 2025)
- ML19242D149 + (18:17:29, 4 January 2025)
- ML19242D147 + (18:17:30, 4 January 2025)
- 05000295/LER-1979-050, Forwards LER 79-050/01T-0 + (18:17:32, 4 January 2025)
- ML19242D144 + (18:17:35, 4 January 2025)
- ML19242D143 + (18:17:36, 4 January 2025)
- ML19242D142 + (18:17:36, 4 January 2025)
- ML19242D141 + (18:17:37, 4 January 2025)
- ML19242D140 + (18:17:38, 4 January 2025)
- ML19242D139 + (18:17:41, 4 January 2025)
- ML19242D137 + (18:17:42, 4 January 2025)
- 05000295/LER-1979-048-03, /03L-0 on 790702:check Source & Indicator Needle of Auxiliary Bldg Rad Monitor ORT-AR08 Stuck in High Alarm Position.Caused by Bent Needle Stuck to Meter Facing. Needle Straightened + (18:17:45, 4 January 2025)
- TXX-3024, Supplements 790518 Info Re Pipe Supports Which May Not Meet Seismic Requirements.Investigation Continuing + (18:17:46, 4 January 2025)
- ML19242D134 + (18:17:49, 4 January 2025)