JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JULY, 1979 In July, 1979, the Unit Cycle I-II refueling outage continued to perform inspection and repair of anchor bolts.
The following significant safety-related maintenance was perfcrmed in July:
1.
PCN 78-078, Auto isolation of S/G blowdown on Auxiliary Feedwater start, was completed.
2.
PCN 78-217 and PCN 79-218, Power to seismic detectors at the River Water and Service Water structures, were completed.
3.
Shaft bearings were placed on the screen wash pump at the River Water structure.
4.
The following work was performed on the Diesel Generator Air Start Air Compressors:
a.
Bearings were renewed for D/G 2C, compressor
'A' motor.
b.
New diaphragm was installed for D/G 1B, compressor
'A' unloader.
c.
Cleaned the head and valves for D/G 1B, compressor
'B'.
d.
Renewed the valves for D/G 1-2A, compressor
'A'.
5.
The Chemical Drain Tank pump mechanical seal was replaced twice.
6.
Installed hydraulic snubbers following in shop functional testing.
~90824a3g
. c ::., o
-~.<
u.
O
9 OPERATING DATA REPORT DOCKET NO. 50-348 DATE 8/1/79 COMPLETED BY W.
G.
Hairston, III TELEPil0NE (9n5uooA156 OPER \\ TING STATUS b
- 1. Unit Name: - Joseph M. Farl_qv - Unit 1 1/Cummulative data
- 2. Reporting Period: _.hllv - 1979 since 12/1/79, date of
- 3. Licensed Thermal Power (31Wt):
2652 cocmercial operation
- 4. Nameplate Itatine (Gross MWe):
860 829
- 5. Design E!ectrical Ratin;;(Net MWel:
- 6. Maximum Dependable Capacity (Gross MWe):
860*
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Gise Reasons:
N/A
- 9. Power Lne! To Which Restricted. !f Any i.%et \\1We):
N/A
- 10. Reasons For Restricticas,if Any:
N/A This Month Yr..t o.Da t e Cumulatis e
- 11. Hours in Reporting Perica 744 5087 14591
- 12. Number Of Houri Reactor Was Critical 0
1533.7 9777.5
- 13. Reactor Resene Shutdown Hours 0
72.4 1079.9
- 14. Hours Generator On.Line 0
1510.8 9506.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3.556.347.8 24.379.595.8 17 Gross Electrical Energy Generated (Mhii) 0__,_,
1.137.794 7.811,992 IS. Net E!ectrical Energy Generated (.\\iWil) 0 1,074,286 7,390,112
- 19. Unit Senice Factor 0
29.7 65.8
- 20. Umt Asailabi:ity Factor 0
29.7 65.8
- 21. Unit Caracity Factor (Using MDC Net) n 25.5 61.I
- 22. Unit Capacity Factor (Using DLR Net) 0 25.5 61.1
- 23. Unit Forced Oatage Rate 0
5.9 7.6
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each t:
Refueling Outage and Anchor bolt Testing in progress
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
8/0'!I[
- 26. Units in fest Status (Prior to Commercial Operation):
Forecast Achiesed INITI \\ L CRITICA LITY 8/6/77 8/9/77 INITIAL ELECTRICITY 6/20/77 8/18/77 COMMERCl \\L OPER ATION 12/1/77 12/1/77
- The Nameplate Rating /Lesign Electrical Rating will be used for the Maximum Dependable capacity until an accurate value can be determined from operatingg,,
experience.
<;, " ' (
w,
. f. u '< h
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-348 UNIT I
DATE 8/1/79 COMPLETED BY U c M,iraron, III TELEPHONE (205)899-5156 MONTli Juiv DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We-Net) 1MWe-Neti I
0 0
g7 2
n IS 0
0 3
0 19 4
9 20 n
0 0
5 21 6
n 22 0
7 0
23 0
S 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 n
28
_D.._
13 0
29 0
0 14 0
30 15 n
31 0
16 0
INSTRUCTIONS On this format.hst the average dad > unit puwer lesel in MWe Net for each day in the reporting inonth. Compute to the nearest whole megawati.
(9/77) a~
s sa N & si ts.
o
F 4
DOCK ET NO.
50-348 UNIT S!!Ul') OWNS AND POWER REDUCTIONS UNIT NA%f E J. Ff. Fa rl e v-Un i t I DATE R /1/ 7 n COMPLETED BY W.
G.
lia i rs t on, III REFORT MONTil July C-lELEPilONE (205)899-5156 r
s.
"P ti 3?
3
)E I.icensee
[ r, Cause & Cor rective j g5 Event g
gy" W.
Iloc c-d_4 3g Action to jE 5 ;f3 g Repor,t r
- v. O E
Prevent Recurrence H
o g
O 020 790701 S
744 C
1 N/A RC 7,Z7,ZZZ Continuation from June 30, 1979.
Refueling Outage in progress. Testing anchor bolts is delaying Unit startup.
I 2
3 4
I: l'oiced Reason :
Method:
Exhibit G. instructions S Si hcJ u!cd A lipnpment Failure (Explain)
- 1. Man ual for Preparation of Data ll41.tintenance or lest
- 2. Manual Scram.
Entry Sheets l'or Licensee
~
C-Refueling
- 3. Autoin:vic Scrain.
Event Report (LF R) File (NilRI G-D llegulatory itesiriction 4 Other (Expl.un) 0161) i 4)perator li. inn ig & License laainination F.T J ini ni.t i.i t is e 5
G 4 )pe r a tion.il I i r o: (I splain)
Estubit I Saine Source
,
- p)/77)
Il4)ihe r (li spla m )
P