RO on 790802:while Testing,Discovered Discrepancies Between as-built Circuits & Wiring Diagrams Supplied by Vendor. Problem May Be GenericML19242D140 |
Person / Time |
---|
Site: |
Phipps Bend |
---|
Issue date: |
08/02/1979 |
---|
From: |
Cartrell T TENNESSEE VALLEY AUTHORITY |
---|
To: |
|
---|
References |
---|
CDR-PBN-033, CDR-PBN-33, NUDOCS 7908140545 |
Download: ML19242D140 (1) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML19332A0561980-08-22022 August 1980 Photographs of Main Reverse Faults Discovered at Facility in Area of Essential Svc Water Spray Pond ML19242D1401979-08-0202 August 1979 RO on 790802:while Testing,Discovered Discrepancies Between as-built Circuits & Wiring Diagrams Supplied by Vendor. Problem May Be Generic ML19247A8971979-07-18018 July 1979 Potential Ro:Notified by Vendor of Defective SB-12 Auxiliary Switch in Switchgear Found at Hartsville Plant.Defective Switches to Be Replaced.Switches Not Shipped to Phipps Bend ML19263D3421979-02-23023 February 1979 Oedc QA Audits Conducted at Hartsville & Phipps Bend Sites Nuclear Components Manual ASME Requirements for Fabrication & Production Have Not Been Entirely Incorporated in Tva'S Const Enqineering or Std Operating Procedures 1980-08-22
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARML19242D1401979-08-0202 August 1979 RO on 790802:while Testing,Discovered Discrepancies Between as-built Circuits & Wiring Diagrams Supplied by Vendor. Problem May Be Generic ML19247A8971979-07-18018 July 1979 Potential Ro:Notified by Vendor of Defective SB-12 Auxiliary Switch in Switchgear Found at Hartsville Plant.Defective Switches to Be Replaced.Switches Not Shipped to Phipps Bend ML19263D3421979-02-23023 February 1979 Oedc QA Audits Conducted at Hartsville & Phipps Bend Sites Nuclear Components Manual ASME Requirements for Fabrication & Production Have Not Been Entirely Incorporated in Tva'S Const Enqineering or Std Operating Procedures 1979-08-02
[Table view] |
Text
-
$ya 79008 5 TELEPHONE REPORT h@ . .s I
, t"_' N P.0 P E -
. M T,1 .
. 1 g;G GET i:- 50-553 ***
.Acu.r!T: *Phipps Bend. e, ---- - , 554 a- ?,g,.
.s
, , aa e.
f .t 8/2/79 gm. 10:00 AM #
. .U2 : LIO. OCC. # : CD_R PBN-033__ hr 1
,; J' ECT .
HPCS D/G Control Switch Gear Wiring Discrepancies )
- .. _.a_
. g ..
i
~ .
.~2*? 10.' ' C? Oc N E N E: While testing, the licensee identified several discrepancies t,3 b'etween the as build circuits and the wiring diagrams supplied by the vendor, ,
Morris Knudsen. A similar problem was previosuly reported with like equipment supplied for the Hartsville Plant (10 CFR 50.55(e) final report dated 3/7/79). This problem ma? be generic.
ba --
- - . t s t f
9 aus. __
I e h N f.-* _ 1
_k h, ,
~~
. Y
.* *
, J.,. e- -*
- ~ ., ; . .
- =--
09a.D
.W,,!-
4.
- ..P, .- . .-. , . . 4i i. , " *i'5*'
d N, , g . , , :. . . y. nb...
,'..:,......k A .< A . ' .
+,*'*-
~ *
4 ',','. Cme,,o i . , - . , L .1 - s- 1 <
s