ML19242D137
| ML19242D137 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/09/1979 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19242D138 | List: |
| References | |
| NUDOCS 7908140543 | |
| Download: ML19242D137 (1) | |
Text
~
Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 323-5341 A
hkoMc7,";2t AlabamaPower the Southem elecirc System August 9, 1979 Director, Of fice of Manzgement Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Re: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report
Dear Sir:
Attached are two (2) copies of the July, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Sec-tion 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, k :'
y.
F.
L.
Clayton, Jr.
FLCJr/ KAP:bhj Attachments cc: Director, IE (10 copies)
Director, RII (1 copy)
Mr. Ted Cintula (1 copy) 790al4asy o
gas tz a le S >/l
.