ML19242D137

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jul 1979
ML19242D137
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/09/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19242D138 List:
References
NUDOCS 7908140543
Download: ML19242D137 (1)


Text

~

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 323-5341 hkoMc7,";2t AlabamaPower A

the Southem elecirc System August 9, 1979 Director, Of fice of Manzgement Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report

Dear Sir:

Attached are two (2) copies of the July, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Sec-tion 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, k :' .< y.

F. L. Clayton, Jr.

FLCJr/ KAP:bhj Attachments cc: Director, IE (10 copies)

Director, RII (1 copy)

Mr. Ted Cintula (1 copy) o 790al4asy gas tz a le S >/l

.