Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E127 + (11:31:25, 4 December 2024)
- ML20212E126 + (11:31:26, 4 December 2024)
- IR 05000267/1986036 + (11:31:27, 4 December 2024)
- B12427, Application for Amend to License DPR-61,revising License Conditions to Permit Possession & Use of Certain Byproduct Matls Currently Allowed by License 06-11682-01.Request for Termination of License 06-11682-01 Will Be Submitted Later + (11:31:28, 4 December 2024)
- 05000328/LER-1986-008-04, :on 861130,containment Ventilation Isolation Occurred.Caused by Personnel Error.Disciplinary Action Taken to Ensure That Instrument Mechanic Follows Procedures in Future to Prevent Recurrence + (11:31:29, 4 December 2024)
- ML20212E120 + (11:31:30, 4 December 2024)
- IR 05000344/1986044 + (11:31:32, 4 December 2024)
- ML20212E114 + (11:31:32, 4 December 2024)
- 05000317/LER-1986-004-01, :on 860720,reactor Automatically Tripped on Low Reactor Coolant Flow Trip Signal.Caused by Surge Capacitor Internally Shorted to Ground.Capacitor Degradation Checks Will Be Conducted Each Refueling Outage + (11:31:34, 4 December 2024)
- ML20212E108 + (11:31:35, 4 December 2024)
- ML20212E109 + (11:31:35, 4 December 2024)
- 05000237/LER-1986-027-04, :on 861130,during Surveillance 4400-1, Containment Cooling Svc Water Vault Floor Drain Level Switch 2-4941-8 Failed.Caused by Loss of Spring Tension Due to Normal Wear.Switch Repaired + (11:31:37, 4 December 2024)
- ML20212E099 + (11:31:38, 4 December 2024)
- ML20212E098 + (11:31:39, 4 December 2024)
- ML20212E090 + (11:31:40, 4 December 2024)
- RBG-25121, Forwards Response to NRC Re Violation Noted in Insp Rept 50-458/86-30 on 860922-26.Corrective Actions: Procedure STP-000-3001, Daily Fire Door Position Check, Revised & Fire Watches Established + (11:31:40, 4 December 2024)
- B12432, Forwards Semmiannual Radioactive Effluents Release Rept, Jul-Dec 1986 & Summary of Quantities of Solid Radwaste.Due to Delays in Sample Analysis,Results for Sr-89,Sr-90 & Fe-55 Incomplete + (11:31:41, 4 December 2024)
- ML20212E085 + (11:31:42, 4 December 2024)
- ML20212E083 + (11:31:44, 4 December 2024)
- ML20212E081 + (11:31:45, 4 December 2024)
- IR 05000344/1986043 + (11:31:46, 4 December 2024)
- ML20212E076 + (11:31:46, 4 December 2024)
- ML20212E075 + (11:31:47, 4 December 2024)
- PNO-IV-86-038, on 861219,U Recovery Field Ofc Notified by State of Wy of Possible Presence of U Byproduct Matl at Unauthorized Location.Caused by Unauthorized Disposal.Matls Being Removed for Licensed Disposal + (11:31:48, 4 December 2024)
- 05000220/LER-1987-002-01, :on 870126,NRC Notified of Problem W/Improper Seating of Agastat GP Series Relays That Could Cause Substantial Safety Hazard.Caused by Improper Installation of Relays.Relays Reseated Per GE Instructions + (11:31:49, 4 December 2024)
- ML20212E068 + (11:31:50, 4 December 2024)
- ML20212E065 + (11:31:51, 4 December 2024)
- ML20212E064 + (11:31:52, 4 December 2024)
- ST-HL-AE-1849, Application to Amend CPPR-128 & CPPR-129 Authorizing GDC-4 Re Requirements for Protection Against Dynamic Effects of Postulated Pipe Rupture,As Modified on 860512,to Be Basis for Facility Design + (11:31:52, 4 December 2024)
- ML20212E059 + (11:31:53, 4 December 2024)
- ML20212E056 + (11:31:54, 4 December 2024)
- IR 05000282/1986012 + (11:32:02, 4 December 2024)
- ML20212E053 + (11:32:03, 4 December 2024)
- 3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to + (11:32:04, 4 December 2024)
- IR 05000267/1986033 + (11:32:04, 4 December 2024)
- AECM-87-0040, Requests Authorization to Use ASME Code Case N-343, Alternate Scope of Exam of Attachment Welds for Exam Categories B-H,B-K-1 & C-C,Section Xi,Div 1. Fee Paid + (11:32:05, 4 December 2024)
- ML20212E047 + (11:32:05, 4 December 2024)
- ML20212E044 + (11:32:12, 4 December 2024)
- ML20212E043 + (11:32:13, 4 December 2024)
- 3F1097-11, Forwards Revised Request for Relief from Requirements of 10CFR50.55a(g)(4)(v),modifying Original Request to State That FPC Will Now Be Performing Containment Repair & Replacement Activities IAW ASME Section XI + (11:32:14, 4 December 2024)
- 05000458/LER-1986-066, :on 861124,discovered That Two Rated Fire Doors Omitted from Any Surveillance Test Procedure (STP) Door List.Caused by Procedural Deficiency.Temporary Change Notice Written to Include Two Doors in Daily STP + (11:32:15, 4 December 2024)
- ML20212E037 + (11:32:16, 4 December 2024)
- IR 05000020/1997201 + (11:32:17, 4 December 2024)
- ST-HL-AE-1852, Final Deficiency & Part 21 Rept Re Excessive Grease in Westinghouse Electrical Penetration Assemblies (Epas). Initially Reported on 861126.EPAs Disassembled,Cleaned & Reassembled.Westinghouse Also Evaluating Item Per Part 21 + (11:32:17, 4 December 2024)
- 05000414/LER-1986-050-01, :on 861118,containment Air Release & Addition Sys Release Terminated When Containment Activity Rose Above Setpoint.Caused by Too Conservative Tech Specs.Setpoint Increased + (11:32:19, 4 December 2024)
- ML20212E031 + (11:32:19, 4 December 2024)
- ML20212E030 + (11:32:21, 4 December 2024)
- 05000327/LER-1985-019-01, :on 850524,inadequate Seismic Piping Supports Discovered.Caused by Personnel Errors.Drawing Discrepancies Re Both Pipes Corrected & Sk Series of Prints Superseded by 47W Series of Prints + (11:32:22, 4 December 2024)
- 05000344/LER-1987-002, :on 870129,positive Pressure Could Not Be Maintained in Control Room W/Control Room Emergency Ventilation Sys.Caused by stuck-open Door to Control Room Viewing Gallery.Door Closed + (11:32:24, 4 December 2024)
- ML20212E026 + (11:32:24, 4 December 2024)
- ML20212E019 + (11:32:25, 4 December 2024)