Letter Sequence RAI |
---|
|
|
MONTHYEARML20211P8671997-10-14014 October 1997 Ack Receipt of 970919 Correspondence Re (Nudocs Accession 9709240373),requesting Amend of Facility OL & Defueled TSs Project stage: Other ML20212E0851997-10-21021 October 1997 Forwards RAI for Amend of Facility Operating License & TSs to Reflect Permanently Shutdown & Defueled Condition of Plant Project stage: RAI ML20199C1811997-11-12012 November 1997 Submits Response to Request for Addl Info Re Amend of Facility Operating License & TS to Reflect Permanently Shutdown Defueled Condition of Plant Project stage: Request ML20202E6601997-11-25025 November 1997 Summary of 971029 Meeting W/Big Rock Point in Rockville,Md Re Proposed Amend of TS to Reflect Permanent Shutdown & Defueled Condition of Plant & Proposed Exemption from 10CFR50 Emergency Planning Requirements Project stage: Meeting ML20217A5991998-04-16016 April 1998 Forwards Request for Addl Info Re Proposed Changes to Proposed Defueled TS as Detailed in .Questions Were Discussed W/Licensee Staff on 980121-22 & 980311.RAI Summarizes Questions That Remain Project stage: RAI ML20198K6551998-12-24024 December 1998 Forwards Amend 120 to License DPR-6 & Safety Evaluation. Amend Changes License DPR-6 & App A,Ts to Reflect Permanently Shutdown & Defueled Status of Plant Project stage: Approval 1997-11-12
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML20206P4501999-05-11011 May 1999 Requests Transcript of 990413 Public Meeting in Rockville,Md Re Decommissioning of Big Rock ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20206E7821999-04-29029 April 1999 Forwards Annual Radioactive Environ Rept for 1998 for Big Rock Point Plant. Rept Includes Summaries,Interpretations & Statistical Evaluation of Results of Radiological Environ Monitoring Program ML20206E3721999-04-29029 April 1999 Informs That Based on Licensee Determinations That Changes in Rev 1 Do Not Decrease Effectiveness of Defueled EP & That Plan Continues to Meet Applicable Stds of 10CFR50.47(b) & Requirements of App E to Part 50,NRC Approval Not Required ML20206B7381999-04-26026 April 1999 Forwards Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted.Activities in Areas of Facility Mgt & Control,Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined 05000155/LER-1992-008, Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable1999-04-26026 April 1999 Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable ML20196K7881999-03-29029 March 1999 Forwards Rept on Certification of Financial Assurance for Decommissioning for Big Rock Plant,Per 10CFR50.75(f)(1).Copy of Trust Agreement Between Consumers Energy & State Bank & Trust Co,Included in Rept ML20205E3471999-03-29029 March 1999 Informs That USNRC Granted Encl Exemption from Certain Requirements of 10CFR73,to Allow Implementation of Safeguards Contingency Plan Reflecting Permanent Shutdown & Defueled Condition of Brpnp in Response to ML20204F4611999-03-19019 March 1999 Forwards Insp Rept 50-155/99-01 on 990113-0225.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML20203F8041999-02-11011 February 1999 Forwards Temporary Addendum to Security Plan Re Central Alarm Station,Per 10CFR50.54(p).Encl Withheld,Per 10CFR73.21(c) ML20203C8971999-02-0808 February 1999 Informs That NRR Contracted with PNNL to Evaluate Storage of Spent Fuel at Number of Decomissioning Nuclear Power Facilities.Forwards Request for Info Re Spent Fuel Storage at Big Rock NPP ML20202H4891999-01-26026 January 1999 Informs That Exemption Request from Various 10CFR73 Physical Protection Requirements, ,was Improperly Based on Requirements of 10CFR50.12.Request Was Resubmitted by Ltr ML20199H2431999-01-15015 January 1999 Forwards Insp Rept 50-155/98-09 on 981201-990112 & Nov.One Weakness Identified Re Event Involving Ungrappling Fuel Bundle Without Being Fully Seated in Rack & Without Independent Verification That Ungrappling Bundle Was Proper ML20199E1841999-01-13013 January 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Proposed Exemption from Certain Physical Protection Requirements of 10CFR73.Assessment Forwarded for Fr Publication ML20199E0781999-01-13013 January 1999 Informs That Staff Has Received Request for Exemption from Various 10CFR73 Pyhsical Protection Requirements Dated 981112.Exemption Request Improperly Based on Requirements of 10CFR50.12 Instead of Applicable Requirements of 10CFR73.5 ML20199D9711999-01-13013 January 1999 Forwards Plant Defueled TS Administrative Replacement Pp.On 990104 Staff Informed NRC That Pp Numbering for Table of Contents Was Incorrect.Subj Pp Requested to Be Replaced with Encl ML20199E9051999-01-12012 January 1999 Submits Revised Request for Exemption from Certain Requirements of 10CFR73 Re Physical Protection of Plants & Matls ML20199E7671999-01-12012 January 1999 Informs That Licensee Has Elected to Comply with Listed 10CFR50.68(b) Requirements in Lieu of Maintaining Monitoring Sys Capable of Detecting Criticality as Described in 10CFR70.24 ML20199A4151999-01-0404 January 1999 Informs That Individuals Listed on Attachment 1 Will No Longer Maintain Operating License for Plant.Senior Licensed Operators & Licensed Operators No Longer Required at Facility ML20198K6551998-12-24024 December 1998 Forwards Amend 120 to License DPR-6 & Safety Evaluation. Amend Changes License DPR-6 & App A,Ts to Reflect Permanently Shutdown & Defueled Status of Plant ML20198J4001998-12-21021 December 1998 Requests That Words Decommissioning of in First Sentence of Paragraph a of Fol,License DPR-6 Be Removed from CPC 970919 Request ML20196H3171998-12-0303 December 1998 Forwards Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted.Inspection Covered Activities in Areas of Radiological Safety ML20196G7541998-11-25025 November 1998 Requests Withdrawal of Listed Sections of 970919 Amend Request,As Supplemented by Ltrs ,0721 & 1014, Respectively.Util Proposed to Retain Certain Sections of Current Tech Specs (CTS) to Support Withdrawal Request ML20195G9851998-11-17017 November 1998 Forwards Rev 0 to Vol 9 of Defueled Emergency Plan & Rev 0 to Vol 9A of Defueled Epips ML20195H5321998-11-13013 November 1998 Provides Confirmation That Revs Required by NRC to Defueled Emergency Plan Prior to Implementation Have Been Completed by Licensee.Items Incorporated Into Plan,Listed ML20195F2271998-11-12012 November 1998 Forwards Request for Exemption from Certain Requirements of 10CFR73 Re Physical Protection of Plants & Matls.Request Withheld,Per 10CFR73.21 ML20154M5381998-10-14014 October 1998 Forwards Supplement to Plant Defueled TS & Bases, Incorporating Licensee Response to NRC 980416 RAI & Clarifying Listed Items ML20154M2211998-10-14014 October 1998 Forwards Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted.Insp Consisted of Examination of Activities in Areas of Facility Mgt & Control,Decommissioning Support (Including Physical Security),Sf Safety & Radiological Safety 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld ML20206E3721999-04-29029 April 1999 Informs That Based on Licensee Determinations That Changes in Rev 1 Do Not Decrease Effectiveness of Defueled EP & That Plan Continues to Meet Applicable Stds of 10CFR50.47(b) & Requirements of App E to Part 50,NRC Approval Not Required ML20206B7381999-04-26026 April 1999 Forwards Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted.Activities in Areas of Facility Mgt & Control,Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined ML20205E3471999-03-29029 March 1999 Informs That USNRC Granted Encl Exemption from Certain Requirements of 10CFR73,to Allow Implementation of Safeguards Contingency Plan Reflecting Permanent Shutdown & Defueled Condition of Brpnp in Response to ML20204F4611999-03-19019 March 1999 Forwards Insp Rept 50-155/99-01 on 990113-0225.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20203C8971999-02-0808 February 1999 Informs That NRR Contracted with PNNL to Evaluate Storage of Spent Fuel at Number of Decomissioning Nuclear Power Facilities.Forwards Request for Info Re Spent Fuel Storage at Big Rock NPP ML20199H2431999-01-15015 January 1999 Forwards Insp Rept 50-155/98-09 on 981201-990112 & Nov.One Weakness Identified Re Event Involving Ungrappling Fuel Bundle Without Being Fully Seated in Rack & Without Independent Verification That Ungrappling Bundle Was Proper ML20199D9711999-01-13013 January 1999 Forwards Plant Defueled TS Administrative Replacement Pp.On 990104 Staff Informed NRC That Pp Numbering for Table of Contents Was Incorrect.Subj Pp Requested to Be Replaced with Encl ML20199E0781999-01-13013 January 1999 Informs That Staff Has Received Request for Exemption from Various 10CFR73 Pyhsical Protection Requirements Dated 981112.Exemption Request Improperly Based on Requirements of 10CFR50.12 Instead of Applicable Requirements of 10CFR73.5 ML20199E1841999-01-13013 January 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Proposed Exemption from Certain Physical Protection Requirements of 10CFR73.Assessment Forwarded for Fr Publication ML20198K6551998-12-24024 December 1998 Forwards Amend 120 to License DPR-6 & Safety Evaluation. Amend Changes License DPR-6 & App A,Ts to Reflect Permanently Shutdown & Defueled Status of Plant ML20196H3171998-12-0303 December 1998 Forwards Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted.Inspection Covered Activities in Areas of Radiological Safety ML20154M2211998-10-14014 October 1998 Forwards Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted.Insp Consisted of Examination of Activities in Areas of Facility Mgt & Control,Decommissioning Support (Including Physical Security),Sf Safety & Radiological Safety ML20154E0121998-09-30030 September 1998 Forwards Exemption from 10CFR50.54(q) Re Plant & Suppls ,1120& 980302,0429 & 0828 Which Requested Exemption from Certain Protions of 10CFR50.47(b) & App E to 10CFR50 to Allow Brpnp to Discontinue Offsite EP Activities ML20239A2491998-09-0303 September 1998 Forwards Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted.Overall,Reactor Decommissioning Activities Were Generally Performed Satisfactorily & as Planned.Potential Weaknesses Were Identified in Review of SE Procedure ML20237E2731998-08-25025 August 1998 Discusses NRC Insp Rept 50-155/98-03 on 980527.Violations Noted.Insp Findings Documented in NRC Insp Rept Sent to Util by Ltr ML20237C5461998-08-19019 August 1998 Refers to Revs 133,134 & 135 to Portions of Big Rock Point Plant Emergency Plan.Based on Determinations That Changes in Revs 133-135 Do Not Decrease Effectiveness of Emergency Plan,Nrc Approval Not Required ML20236Y0441998-08-0505 August 1998 Forwards Summary of Decommissioning Insp Plan Through March 1999.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events & Resource Availability ML20236V0651998-07-28028 July 1998 Ack Receipt of 980605 Request for Withdrawal of 980325 Request for License Amend for DPR-6,paragraph 2.C.(5), Physical Protection & Closes TAC MA0756 ML20236U4311998-07-24024 July 1998 Forwards Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted.Nrc Concern That Programmatic Assessments of RPP Were Not Initiated Following Identification of Multiple Deficiencies in RP Program During First Half of 1998 IR 05000155/19980041998-07-0808 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-155/98-04 ML20236M4131998-07-0707 July 1998 Ack Receipt of Ltr Dtd 980512,transmitting Changes Identified as Rev 14 to Big Rock Point Security Suitability, Training & Qualification Plan.No NRC Approval Required ML20249C4391998-06-25025 June 1998 Ack Receipt of ,Which Transmitted Changes to Rev 14 to Suitability,Training & Qualification Plan,Submitted Under Provisions 10CFR50.54(p) ML20249B3041998-06-16016 June 1998 Forwards Insp Rept 50-155/98-03 on 980407-0527.Violation Noted & Being Considered for Escalated Enforcement Action. Notice of Violation Not Presently Being Issued for Insp Finding ML20248F3541998-05-28028 May 1998 Responds to to P Harris Which Requested That NRC Retain Resident Inspector at Big Rock Site to Monitor Project for Period of Five Years.Informs That NRC Intends to Assign Inspector to Site for One Year ML20247M9481998-05-15015 May 1998 Ack Receipt of Ltr Dtd 980312,which Transmitted Changes Identified as Rev 7 to Safeguards Contingency Plan,Submitted Under Provisions of 10CFR50.54(p) ML20217D1221998-04-21021 April 1998 Forwards Insp Rept 50-155/98-02 on 980203-0406.No Violations Noted.Emergency Preparedness Exercise Was Completed Satisfactorily,However,Unusual Event Was Declared When Algae Containing Co-60 Alarmed Discharge Canal Radiation Monitor ML20217A5991998-04-16016 April 1998 Forwards Request for Addl Info Re Proposed Changes to Proposed Defueled TS as Detailed in .Questions Were Discussed W/Licensee Staff on 980121-22 & 980311.RAI Summarizes Questions That Remain ML20216J4411998-04-16016 April 1998 Informs That Consumer Request for Exemption from Certain Requirements of 10CFR50.54, Condition of Licenses, Based On,In Part,Determination That Plant Permanantly Shut Down & Defueled Not Required ML20216J9861998-04-16016 April 1998 Forwards SE Approving Licensee 970919 Submittal of Training Program for Certified Fuel Handlers.Comments Also Encl ML20247L4021998-04-14014 April 1998 Discusses Rev 131 to Chapter 5 & Rev 132 to Chapters 2,3 & Appendix H of Big Rock Point Plant Emergency Plan Submitted Under Provisions of 10CFR50.54(q).No NRC Approval Required ML20216G9071998-04-0808 April 1998 Responds to Asking Number of Questions Re Activities at Big Rock Point Nuclear Plant.Particularly on 980203 NRC Requested Addl Info from Utility Re Proposed Changes to Emergency Preparedness Plan ML20217J2131998-04-0202 April 1998 Forwards Copy of Each Revised Forms 398,personal Qualifications Statement & 396,certification of Medical Exam by Facility Licensee.Due to Error on Instructions for Form 398,addendum for Completing Form Are Provided IR 05000155/19970151998-03-20020 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-155/97-15 ML20246H0091998-03-19019 March 1998 Discusses Rev 130 to App a of Big Rock Point Nuclear Plants Emergency Plan,Received in Sept 1997.NRC Approval Not Required Based on Determination That Changes Do Not Decrease Effectiveness of Emergency Plan ML20203K7501998-02-26026 February 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of Fy 1998.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events, Resource Availability ML20203H8511998-02-23023 February 1998 Forwards Request for Addl Info Re Exemption from Offsite Emergency Planning Requirements.In Accordance with 10CFR50.30(b),response Must Be Executed in Signed Original Under Oath or Affirmation ML20202J8111998-02-14014 February 1998 Forwards Insp Rept 50-155/97-15 on 971205-980202 & Notice of Violation.Activities in Areas of Facility Mgt & Control, Decommissioning Support & Spent Fuel Safety ML20203E0811998-02-13013 February 1998 Informs That on 980331 & 0401,NRR Will Be Holding 1998 Decommissioning Power Reactor Counterparts Meeting in Arlington,Tx.Recipient Requested to Make Presentation at Subj Meeting.Meeting Agenda Encl ML20202D7751998-02-0808 February 1998 Ack Receipt of Ltr Dtd 980116,which Transmitted Changes Identified as Rev 32 to Big Rock Point Security Plan, Submitted Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan 1999-09-30
[Table view] |
Text
,
October 21, 1997 Mr. Kenneth P. Powers Plant General Manager Big Rock Nuclear Plant Consumers Energy Company 10269 US 31 North.
Charlevoix, MI 40720
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR AMENDMENT OF FACILITY OPERATING LICENSE AND TECHNICAL SPECIF! CATIONS TO REFLECT THE PERMANENTLY SHUTDOWN DEFUELED CONDITION OF THE BIG ROCK POINT (BRP) NUCLEAR PLANT (TAC NO. M99687)
Dear Mr. Powers:
We are continuing our review of your request for amendment of the BRP Facility Operating .
License and Technical Spec!fications to reflect the permanently shutdown and defueled condition of BRP. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of tha date of this letter, in
^
accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. This requirtsment affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511. '
if you have any questions regarding this review, please contact me at (301) 4151169.
Sincerely, 4 kufh."bairboj k Manager Non-Power Reactors and Decommissioning Project Directorate 1
Division of Reactor Program Management S
q :( Office of Nuclear Reactor Regulation Docket No. 50155 j
Enclosare: t As stated - g q ,
cc w/ enclosure: )
I '
See next page DISTRIBUTION:
LDocket File.50-155 a MMasnik PHarris MWebb PUBLIC RDudley AMarkley Region lli PDND r/f MFairtile JMinns OGC (AHodgdon)
~ SWeiss TFredrichs LThonus EHylton -
DOCRENT NME: A:NRAI 9687
'. T* recobre e cop.r of thle document, indicate in the ._ 'C' = Copy without enclosures *E' = Copy with enclosures *N* = No copy IOFFICE PDND: PM/ j _ E PON9'LA lE PDNDTA)SC l E PDND'D l E l l NAME PHarris W' EMhn MMasnik MTM S'Neiss $4TMit-(
~
DATE 10/967 V 10f) /97 10/7J/97 101B197 OFFICIAL RECORD COPY 9711030047 971021 I" ' ?aeah
PDR ADOCK 05000155 s4, .
1 1 9 D)U P 1, eoa
~
w d,, lll ll! l . . ,I.1.1 .
4 :e l
p nat:vq
'b y t UNITED STATES s* j 2
NUCLEAR REGULATORY COMMISSION ,
WASHINGTON. D.C. 30486-0001
\, * * * + + f October 21, 1997 Mr. Kenneth P. Powers Plant General Manager Big Rock Nuclear Plant Consumers Energy Company 10269 US 31 North -
Char'evoix, MI 49720 -
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR AMENDMENT OF FACILITY OPERATING LICENSE AND TECHNICAL SPECIFICATIONE ~O REFLECT THE-PERMANENTLY SHUTDOWN DEFUELED CONDITION OF THE BIG ROCK POINT (BRP) NUCLEAR PLANT (TAC NO. M99687)
Dear Mr. Powers:
We are continuing our review of your request for amendment of the BRP Facility Operating License and Technical Specifications to reflect the permanently shutdown and defueled condition of BRP. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of the date of this letter. In s
accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. This requirement affeuts nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L. 96 511.
11 you have any questions regarding this review, please contact me at (301) 415-1169.
Sinc.efely,
/
aul W. H rris,McIliaanager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket 140. 00 155-
Enclosure:
As stated cc w/ enclosure:
See next page i
\
Mr. Kenneth Powers Big Rock Point Nuclear Plant Docket No. 50-155 (PAGE 1 OF 2) cc:
Mr. Thomas A. McNish, Secretary Lake Michigan Federation Consumers Energy Company ATTN: E, Roemer, Attomey 212 West Michigan Avenue 59 E. Van Buren #2215 Jackson, Michigan 49201 Chicago, Illinois 60605 Judd L. Bacon, Esquire Ms. Irene Kock Consumers Energy Company Nuclear Awareness Project 212 West Michigan Avenue Box 2331 Jackson, Michigan 49201 Oshawa, Ontario L1H7V6 Ms. Jane E. Brannon, County Clerk Michigan Department of Attomey County Building Annex General 203 Antrim Street Special Litigation Division Charlevoix, Michigan 49720 630 Law Building P.O. Box 30212 Office of the Govemor Lansing, Michigan 48909 Room 1 Capitol Building Lansing, Michigan 48913 Mr. Rich Bachus Traverse City Record - Eagle Regional Administrator, Region lll 7401 Middle Road U.S. Nuclear Regulatory Commission Harbor Springs, Michigan 49740 801 Warrenville Road Lisle, Illinois 60532-4351 Ms. Angela Dauginas U.S. NRC Region lll Michigan Department of 801 Warrenvillo Road Environmental Quality Lisle, Illinois 60532 Drinking Water and Radiological Protection Division Ms. Janenne Irene Froats 3423 N. Martin Luther King Jr. Blvd. P.O. Box 528 P.O. Box 30630 Petoskey, Michigan 49770 Lansing, Michigan 48909-8130 Mr. Henry Peters U.S. Nuclear Regulatory Commission Route 1 Resident inspector Office Ewen, Michigan 49525 Big Rock Point Plant 10253 U.S. 31 North Ms. Doris Schaller Charlevoix, Michigan 49720 2310 M-119 Lakeside Condo Unit #55 Mr. Robert A. Fenech Petoskey, Michigan 49770 Senior Vice President Nuclear, Fossil Operations Mr. Michael Winnell Consumers Energy Company 3250 Krouse Road 212 W. Michigan Ave. Petoskey, Michigan 49770 Jackson, Michigan 49201 Mr, James S. Rang Ms. Kay Cumbow Consumers Power Company 15184 Dudley Road 10269 U.S. 31 North Brown City, Michigan 48416 Charlevoix, Michigan 49720 9
l l,:
Mr. Kenneth Powers Big Rock Point Nuclear Plant Docket No. 50-155 (PAGE 2 OF 2) cc:
' Mr. Brennain Lloyd Northwatch P.O. Box 282 North Bay, Ontario PIB 8H2 Mr. John W. Campbell -
Executive Director Eastem U.P. Regional Planning ,
& Development Commission -
524 Ashmun Street P. O. Box 520 Sault Ste. Marie, Michigan 49783 Leke Michigan Federation
- Attn
- T. Cabala, Director.
- A25 W. Westem Avenue .
Muskegon, Michigan 49440
. Citizens Awareness Network
' Box 83 Shelbume Falls, Massachuse:ts 01370 Jonathan M. Block 4
Main Street P.O. Box 566 i Putney, VI- 05346-0566
.. Ms. Deborah B. Katz, President -
Citizens Awareness Network P. O. Box 83 Shelbume Falls, Massachusetts 01370-0083 Ms. Corinne Carey 2213 River Side Drive NE Grand Rapids, MI 49505
,.,VO.
ll ENCLOSURE-REQUEST FOR ADDITIONAL INFORMATION BIG ROCK POINT NUCLEAR PLANT DOCKET NO. 50-155 As stated in the amendment request, Section 111, Analysis of No Significant Hazards
. Consideration, paragraph (3), ."93 days after permanent cossation of operations, the spent fuel at BFiP will have decayed to the point where the added margin from this decay more than compentates for the removal of the containment as a safety fe~ ire, and allows relaxed controls for the cooling of the spent fuel pool." However, insufficient information was provided in your significant hazards analysis for the NRC staff to assess your conclusion that containment isolation can be removed from your technical specifications for fuel handling.
To assist in our evaluation, your staff provided us electronically a summary basis for the 93 day determination. This summary indicated that at 93-days after reactor shutdown, spent fuel heat load would be insufficient to raise SFP temperature above 150 degrees-Fahrenheit with a loss of SFP cooling. We have preliminarily ascertained that this' 150 degree value is based on, in part, maintaining the structural strength of the concrete as described in the BRP Systems Descriptions Manual, Chapter 9, " Fuel Pool Operation."
Therefore, we note your justification is based on maintaining concrete strength thereby i preventing a postulated spent fuel pool drain down accident. However, the safety analysis to remove the containment isolation feature should also consider other accidents that can result in offsite dose consequences.
Provide a narrative summary with supporting offsite dose values justifying why
- 1.
the margin of safety does not significantly reduce,if containment isolation is removed at the 93rd day. This discussion and supporting technical data should
- demonstrate that your proposed changes (i.e., fuel handling without containment
- Isolation) can not result in an accident whose consequences are significently
. greater than accidents previously evaluated.
- 2. Describe the snuctures, controls and containment support systems (such as ventilation and cooling, if those systems are credited in your analysla) that BRP plans to maintain (in the proposed technical specifications) fer spent fuel storage and for spent fuel nandling following the 93rd day. If no structures, controls, or support systems are credited in your analysis or planned, please state as such.
- 3. If not already provided, describe tvhat these " relaxed controls" for the cooling of the spent fuel pool will be.