Forwards RAI for Amend of Facility Operating License & TSs to Reflect Permanently Shutdown & Defueled Condition of Plant
ML20212E085
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/21/1997
From: Harris P
NRC (Affiliation Not Assigned)
To: Power K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TAC-M99687, NUDOCS 9711030047
Download: ML20212E085 (5)


Text

,

October 21, 1997 Mr. Kenneth P. Powers Plant General Manager Big Rock Nuclear Plant Consumers Energy Company 10269 US 31 North.

Charlevoix, MI 40720

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR AMENDMENT OF FACILITY OPERATING LICENSE AND TECHNICAL SPECIF! CATIONS TO REFLECT THE PERMANENTLY SHUTDOWN DEFUELED CONDITION OF THE BIG ROCK POINT (BRP) NUCLEAR PLANT (TAC NO. M99687)

Dear Mr. Powers:

We are continuing our review of your request for amendment of the BRP Facility Operating .

License and Technical Spec!fications to reflect the permanently shutdown and defueled condition of BRP. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of tha date of this letter, in

^

accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. This requirtsment affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511. '

if you have any questions regarding this review, please contact me at (301) 4151169.

Sincerely, 4 kufh."bairboj k Manager Non-Power Reactors and Decommissioning Project Directorate 1

Division of Reactor Program Management S

q  :( Office of Nuclear Reactor Regulation Docket No. 50155 j

Enclosare: t As stated - g q ,

cc w/ enclosure: )

I '

See next page DISTRIBUTION:

LDocket File.50-155 a MMasnik PHarris MWebb PUBLIC RDudley AMarkley Region lli PDND r/f MFairtile JMinns OGC (AHodgdon)

~ SWeiss TFredrichs LThonus EHylton -

DOCRENT NME: A:NRAI 9687

'. T* recobre e cop.r of thle document, indicate in the ._ 'C' = Copy without enclosures *E' = Copy with enclosures *N* = No copy IOFFICE PDND: PM/ j _ E PON9'LA lE PDNDTA)SC l E PDND'D l E l l NAME PHarris W' EMhn MMasnik MTM S'Neiss $4TMit-(

~

DATE 10/967 V 10f) /97 10/7J/97 101B197 OFFICIAL RECORD COPY 9711030047 971021 I" ' ?aeah

  • "" $" P~Tm'O O"?

PDR ADOCK 05000155 s4, .

1 1 9 D)U P 1, eoa

~

w d,, lll ll! l . . ,I.1.1 .

4 :e l

p nat:vq

'b y t UNITED STATES s* j 2

NUCLEAR REGULATORY COMMISSION ,

WASHINGTON. D.C. 30486-0001

\, * * * + + f October 21, 1997 Mr. Kenneth P. Powers Plant General Manager Big Rock Nuclear Plant Consumers Energy Company 10269 US 31 North -

Char'evoix, MI 49720 -

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR AMENDMENT OF FACILITY OPERATING LICENSE AND TECHNICAL SPECIFICATIONE ~O REFLECT THE-PERMANENTLY SHUTDOWN DEFUELED CONDITION OF THE BIG ROCK POINT (BRP) NUCLEAR PLANT (TAC NO. M99687)

Dear Mr. Powers:

We are continuing our review of your request for amendment of the BRP Facility Operating License and Technical Specifications to reflect the permanently shutdown and defueled condition of BRP. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of the date of this letter. In s

accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. This requirement affeuts nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L. 96 511.

11 you have any questions regarding this review, please contact me at (301) 415-1169.

Sinc.efely,

/

aul W. H rris,McIliaanager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket 140. 00 155-

Enclosure:

As stated cc w/ enclosure:

See next page i

\

Mr. Kenneth Powers Big Rock Point Nuclear Plant Docket No. 50-155 (PAGE 1 OF 2) cc:

Mr. Thomas A. McNish, Secretary Lake Michigan Federation Consumers Energy Company ATTN: E, Roemer, Attomey 212 West Michigan Avenue 59 E. Van Buren #2215 Jackson, Michigan 49201 Chicago, Illinois 60605 Judd L. Bacon, Esquire Ms. Irene Kock Consumers Energy Company Nuclear Awareness Project 212 West Michigan Avenue Box 2331 Jackson, Michigan 49201 Oshawa, Ontario L1H7V6 Ms. Jane E. Brannon, County Clerk Michigan Department of Attomey County Building Annex General 203 Antrim Street Special Litigation Division Charlevoix, Michigan 49720 630 Law Building P.O. Box 30212 Office of the Govemor Lansing, Michigan 48909 Room 1 Capitol Building Lansing, Michigan 48913 Mr. Rich Bachus Traverse City Record - Eagle Regional Administrator, Region lll 7401 Middle Road U.S. Nuclear Regulatory Commission Harbor Springs, Michigan 49740 801 Warrenville Road Lisle, Illinois 60532-4351 Ms. Angela Dauginas U.S. NRC Region lll Michigan Department of 801 Warrenvillo Road Environmental Quality Lisle, Illinois 60532 Drinking Water and Radiological Protection Division Ms. Janenne Irene Froats 3423 N. Martin Luther King Jr. Blvd. P.O. Box 528 P.O. Box 30630 Petoskey, Michigan 49770 Lansing, Michigan 48909-8130 Mr. Henry Peters U.S. Nuclear Regulatory Commission Route 1 Resident inspector Office Ewen, Michigan 49525 Big Rock Point Plant 10253 U.S. 31 North Ms. Doris Schaller Charlevoix, Michigan 49720 2310 M-119 Lakeside Condo Unit #55 Mr. Robert A. Fenech Petoskey, Michigan 49770 Senior Vice President Nuclear, Fossil Operations Mr. Michael Winnell Consumers Energy Company 3250 Krouse Road 212 W. Michigan Ave. Petoskey, Michigan 49770 Jackson, Michigan 49201 Mr, James S. Rang Ms. Kay Cumbow Consumers Power Company 15184 Dudley Road 10269 U.S. 31 North Brown City, Michigan 48416 Charlevoix, Michigan 49720 9

l l,:

Mr. Kenneth Powers Big Rock Point Nuclear Plant Docket No. 50-155 (PAGE 2 OF 2) cc:

' Mr. Brennain Lloyd Northwatch P.O. Box 282 North Bay, Ontario PIB 8H2 Mr. John W. Campbell -

Executive Director Eastem U.P. Regional Planning ,

& Development Commission -

524 Ashmun Street P. O. Box 520 Sault Ste. Marie, Michigan 49783 Leke Michigan Federation

Attn
T. Cabala, Director.

- A25 W. Westem Avenue .

Muskegon, Michigan 49440

. Citizens Awareness Network

' Box 83 Shelbume Falls, Massachuse:ts 01370 Jonathan M. Block 4

Main Street P.O. Box 566 i Putney, VI- 05346-0566

.. Ms. Deborah B. Katz, President -

Citizens Awareness Network P. O. Box 83 Shelbume Falls, Massachusetts 01370-0083 Ms. Corinne Carey 2213 River Side Drive NE Grand Rapids, MI 49505

,.,VO.

ll ENCLOSURE-REQUEST FOR ADDITIONAL INFORMATION BIG ROCK POINT NUCLEAR PLANT DOCKET NO. 50-155 As stated in the amendment request, Section 111, Analysis of No Significant Hazards

. Consideration, paragraph (3), ."93 days after permanent cossation of operations, the spent fuel at BFiP will have decayed to the point where the added margin from this decay more than compentates for the removal of the containment as a safety fe~ ire, and allows relaxed controls for the cooling of the spent fuel pool." However, insufficient information was provided in your significant hazards analysis for the NRC staff to assess your conclusion that containment isolation can be removed from your technical specifications for fuel handling.

To assist in our evaluation, your staff provided us electronically a summary basis for the 93 day determination. This summary indicated that at 93-days after reactor shutdown, spent fuel heat load would be insufficient to raise SFP temperature above 150 degrees-Fahrenheit with a loss of SFP cooling. We have preliminarily ascertained that this' 150 degree value is based on, in part, maintaining the structural strength of the concrete as described in the BRP Systems Descriptions Manual, Chapter 9, " Fuel Pool Operation."

Therefore, we note your justification is based on maintaining concrete strength thereby i preventing a postulated spent fuel pool drain down accident. However, the safety analysis to remove the containment isolation feature should also consider other accidents that can result in offsite dose consequences.

Provide a narrative summary with supporting offsite dose values justifying why

- 1.

the margin of safety does not significantly reduce,if containment isolation is removed at the 93rd day. This discussion and supporting technical data should

- demonstrate that your proposed changes (i.e., fuel handling without containment

Isolation) can not result in an accident whose consequences are significently

. greater than accidents previously evaluated.

2. Describe the snuctures, controls and containment support systems (such as ventilation and cooling, if those systems are credited in your analysla) that BRP plans to maintain (in the proposed technical specifications) fer spent fuel storage and for spent fuel nandling following the 93rd day. If no structures, controls, or support systems are credited in your analysis or planned, please state as such.
3. If not already provided, describe tvhat these " relaxed controls" for the cooling of the spent fuel pool will be.