Application to Amend CPPR-128 & CPPR-129 Authorizing GDC-4 Re Requirements for Protection Against Dynamic Effects of Postulated Pipe Rupture,As Modified on 860512,to Be Basis for Facility Design
ML20212E060
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/26/1987
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-1849, NUDOCS 8703040262
Download: ML20212E060 (5)


Text

.

The Light NE f Ilouston 1.ighting & Power P.O. Ik)x 1700 llouston, Texas 77001 (713) 228 921i February 26, 1987 ST-HL-AE-1849 File No.: G9.10 10CFR 50, App. A U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Application for Construction Permit Amendments Primary Coolant Loop Piping Compliance with General Design Criterion 4

References:

1) Letter from J. H. Goldberg (HL&P) to H. R. Denton (NRC),

dated September 28, 1983 (ST-HL-AE-1010)

2) Letter from J. H. Goldberg (HL&P) to H. R. Denton (NRC),

dated July 17, 1984 (ST-HL-AE-1096)

3) Letter from J. H. Goldberg (HL&P) to H. R. Denton (NRC),

dated March 1, 1985 (ST-HL-AE-1200)

4) Letter from J. H. Goldberg (HL&P) to H. R. Denton (NRC),

dated August 19, 1985 (ST-HL-AE-1326)

5) Letter from M. R. Wisenburg (HL&P) to V. S. Noonan (NRC),

dated January 13, 1986 (ST-HL-AE-1577)

6) Letter from M. R. Wisenburg (HL&P) to V. S. Noonan (NRC),

dated March 7, 1986 (ST-HL-AE-1618)

7) Letter from N. Prasad Kadambi (NRC) to J. H. Goldberg (HL&P) dated May 8, 1986 (ST-AE-HL-90886)
8) Letter from M. R. Wisenburg (HL&P) to V. S. Noonan (NRC),

dated September 15, 1986 (ST-HL-AE-1744)

9) NUREG-0781, Supplement No. 2 dated January 1987
10) Letter from J. H Goldberg (HL&P) to U.S. NRC, dated February 20, 1987 (ST-HL-AE-1855) STP FSAR Amendment 57

%[Opg{ 75 [

^

go\

i i

T m

.T .-

ST-HL-AE-1849-

Houston Lighting & Pbwer Company - File No.
G9.10 '

, Page 2

References (1) through (6)'_ pertain to Houston Lighting & Power Compa'ny's

. (HL&P)' request for a partial exemption to the requirements of 10CFR50,-

Appendix A, General Design Criterion 4 (GDC4)' regarding the treatment of

. postulated-Reactor Coolant System (RCS) main loop and cross-over piping breaks inside containment:at the South Texas Project Units 1 and 2. . By Reference (7) HL&P was informed that further NRC staff action on our exemption request had become unnecessary as a result of Commission approval of a rule

-(51FR12502) .which modified GDC-4 and approved use of' leak-before-break technology as a basis for excluding from the design basis of PWR's the dynamic

. effects of postulated breaks in RCS loop piping. Reference (7) also informed HL&P that, _ in order to -take advantage of the modification to GDC-4, changes to the FSAR would.be required and that a review should be undertaken to determine whether the changes modified design criteria set forth in the PSAR which would require amendment of the construction permit. By Reference (8) HL&P-submitted annotated changes to FSAR Sections 1.3, 3.1, 3.6, 3.8, 3.9, 3.12,-

5.4, 6.2 and various responses to NRC requests for additional information to reflect the implementation of the modification to GDC-4 at STP. By Reference (9) the NRC staff documented their review of the HL&P submittals in References.

'(1) through (6) and reference (8) and the staff's conclusion that STP was in compliance with GDC-4, as revised. By reference (10) HL&P submitted amendment 57 to the-STP FSAR which incorporated the changes previously submitted by reference (8).

HL&P has completed.a review of the STP PSAR and concluded that it would be appropriate to amend the construction permit.

. Accordingly, HL&P, as Project Manager for STP, acting for itself and for the City of San: Antonio (acting by and through the City Public Service Board of San Antonio), Central Power and Light Company, and the City of Austin, Texas, hereby requests that Construction Permit (CP) Nos. CPPR-128 and CPPR-129 be amended to authorize that GDC-4, Requirements for Protection Against Dynamic Effects of Postulated Pipe Rupture, as modified May 12, 1986, is the design basis for the South Texas Project Units 1 and 2. Therefore, the dynamic effects of postulated ruptures in the primary coolant loop piping are excluded from the design basis of both STP Unit I and 2.

In addition we request that Paragraph 3.C of the Construction Permit be revised to read as follows:

This construction permit authorizes the Applicant to construct the facility described in the application and in the hearing record, in accordance with the principal architectural and engineering criteria (except ta tha avtant modifications of such cri-teria may be duly authorized by changes to the Act, rules, regulations, and orders of the Commission) and environmental protection commitments set forth therein.

ST-HL-AE-1849 Houston Lighting & Power Company No.: G9.10 It is our understanding that the check in the amount of $300 submitted with Reference (3) is sufficient for payment of the application fees associated with this' request, as required by 10CFR170.12.

If you should have any questions on this matter, please contact Mr.

M. E. Powell_at (713) 993-1328.

J. H. Goldberg Group Vice President, Nuclear MRW/yd Attachments

2* - k ~

ST-HL~-AE-1849 File No.: G9.10 Page 4 cc:

Regional Administrator, Region IV M.B. Lee /J.E. Malaski Nuclear Regulatory Comission City of Austin 611 Ryan Plaza Drive, Suite 1000 P.O. Box 1088 Arlington, TX 76011 Austin, TX 78767-8814 N. Prasad Kadambi, Project Manager M.T. Hardt/A. von Rosenberg U.S. Nuclear Regulatory Comission City Public Service Board 7920 Norfolk Avenue P.O. Box 1771 Bethesda, MD 20814 San Antonio, TX 78296 Robert L. Perch, Project Manager Advisory Comittee on Reactor Safeguards U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue 1717 H Street Bethesda, MD 20814 Washington, DC 20555 Dan R. Carpenter Senior Resident Inspector / Operations c/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 Claude E. Johnson Senior Resident Inspector /STP c/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 M.D. Schwarz, Jr., Esquire Baker & Botts One Shell Plaza Houston, TX 77002 J.R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 T.V. Shockley/R.L. Range Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403

. ., 'w

. UNITED STATES OF AMERICA

~

~ NUCLEAR REGULATORY COMISSION In the Matter.'of; -

Houston Lighting & Power ' Docket Nos. 50-498'

. Company, et al.,- - 50-499 South Texas Project 5 Units 1 and 2 AFFIDAVIT

~

J. H. Goldberg being duly sworn,-hereby deposes and says: That'he is Group Vice President, Nuclear of Houston Lighting & Power Company,' Project Manager of the South Texas Project and an Applicant herein; that the foregoing request for amendments of Construction Permits Nos. CPPR-128 and CPPR-129 to state that the modifications of General Design Criterion 4 (GDC-4) requirements for protection of postulated ' pipe rupture effective May 12, 1986 area the design basis for the South Texas Project Units 1 and 2 has been prepared under his supervision and direction; that he knows the contents thereof; and that too the best of his knowledge and belief said request-and the facts contained therein are true and correct.

DATED: This 2 day of d h , 1987 0

'J. H. Goldberg~ \/

Group Vice Preside K, Nuclear STATE OF TEXAS =

Subscribed and sworn to before me, a Notary Public in and for the State of Texas, this et/,dday ofg4 , 1987.

'% Y

"'*h ,,4 Notary Public y Tor' the

/o j A q) 1 State of Texas BEVERLY J. HTE '.I' j  % rutec. saw ef. Tees  %'S'  %......

g cunniulon Empires l}h1lM

"'+ oy %

ligggg gggg