Forwards Insp Rept 50-267/86-36 on 861117-21.No Violations or Deviations Identified.Team Insp Scheduled for Wk of 870105 Rescheduled for Wk of 870126
ML20212E108
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20212E112 List:
References
NUDOCS 8701050248
Download: ML20212E108 (2)


See also: IR 05000267/1986036

Text

. o

In Reply Refer To:

Docket: 50-267/86-36 0EC 2 4 IE

Public Service Cort;,any of Colorado

ATTN: Robert O. Williams, Jr.

Vice President, Nuclear Operations

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Mr. D. E. Norman of this office

during the period November 17-21, 1986, of activities authorized by NRC

Operating License DPR-34 for Fort St. Vrain, and to the discussion of our

findings with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included the EQ outage programs and an

allegation regarding unresolved safety issues at Fort St. Vrain. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspector.

At the time of this inspection, the NRC was scheduled to perform a team inspection

concerning equipment qualification during the week of January 5, 1987. Based

on your request during our conference call on December 5, 1986, we have rescheduled

the team inspection for the week of January 26, 1987. The inspection findings

are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely, . . . -

Onnim1 STWd W

0

J. E. gad

W 11ardo,

I n r do Chief

l

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-267/86-36

! cc w/ enclosure: (see next page)

t

RIV:R &ES C:ES

/?&[

C:RPB/AMC:RSB

/DENorraan/cg REIreland JPJaudon

AC #

i/

C:RPB #

\)

l gTFWesterman MEEmerson JEGaglia do

11/2)/86 ld/ M 86 ith3/86 ~/2/L'//86 @/g/86 It d3 /8pV

Q1050248861224

ADOCK 05000267 \\

O

PDR

t-

- ..

'

,

Public. Service Company'of Colorado -2- .

cc w/ enclosure:

J. W. Gahm, Manager, Nuclear

Production Division

Fort.St. Vrain Nuclear Station

16805 WCR 19\

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • RRI R. D. Martin, RA

'*Section Chief (RPB/A) *RSB

  • Section Chief (RSB/ES) * Project Inspector
  • R&SPB .
  • MIS System
  • RSTS Operator (RIV File) D. Norman

M. Emerson

  • w/766

,

(