ML20212E108
| ML20212E108 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 12/24/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20212E112 | List: |
| References | |
| NUDOCS 8701050248 | |
| Download: ML20212E108 (2) | |
See also: IR 05000267/1986036
Text
. o
In Reply Refer To:
0EC 2 4 IE
Docket:
50-267/86-36
Public Service Cort;,any of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado
80201-0840
Gentlemen:
This refers to the inspection conducted by Mr. D. E. Norman of this office
during the period November 17-21, 1986, of activities authorized by NRC
Operating License DPR-34 for Fort St. Vrain, and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included the EQ outage programs and an
allegation regarding unresolved safety issues at Fort St. Vrain.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspector.
At the time of this inspection, the NRC was scheduled to perform a team inspection
concerning equipment qualification during the week of January 5, 1987.
Based
on your request during our conference call on December 5, 1986, we have rescheduled
the team inspection for the week of January 26, 1987.
The inspection findings
are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
. . . -
Onnim1 STWd W
J. E. W I n r do
0
gad 11ardo, Chief
l
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-267/86-36
!
cc w/ enclosure:
(see next page)
&ES
t
/?&[
i/
C:RPB \\)
C:ES
C:RPB/AMC:RSB
AC #
RIV:R
l
/DENorraan/cg REIreland JPJaudon
gTFWesterman MEEmerson JEGaglia do
11/2)/86
ld/ M 86
ith3/86
~/2/L'//86
@/g/86
It d3 /8pV
Q1050248861224
\\\\
ADOCK 05000267
O
t-
.
- ..
'
,
Public. Service Company'of Colorado
-2-
.
cc w/ enclosure:
J. W. Gahm, Manager, Nuclear
Production Division
Fort.St. Vrain Nuclear Station
16805 WCR 19\\
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI
R. D. Martin, RA
'*Section Chief (RPB/A)
- RSB
- Section Chief (RSB/ES)
- Project Inspector
- R&SPB
.
- MIS System
- RSTS Operator (RIV File)
D. Norman
M. Emerson
- w/766
,
(
,
_
. _ . ,
. - _ . .
_ ~ - - - _ _ _ _ _ .
-