Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213A297 + (08:40:39, 4 December 2024)
- ML20213A293 + (08:40:40, 4 December 2024)
- ML20213A287 + (08:40:41, 4 December 2024)
- ML20213A291 + (08:40:41, 4 December 2024)
- IR 05000254/1987004 + (08:40:42, 4 December 2024)
- ML20213A285 + (08:40:43, 4 December 2024)
- ML20213A282 + (08:40:44, 4 December 2024)
- ML20213A281 + (08:40:44, 4 December 2024)
- ML20213A280 + (08:40:45, 4 December 2024)
- 05000409/LER-1986-036, :on 861209,reactor Scrammed from 97% Power. Caused by Failure of Scram Solenoids on Control Rod 18.Scram Solenoids Replaced & Will Be Added to CRD Mechanism Preventive Maint Program + (08:40:47, 4 December 2024)
- ML20213A272 + (08:40:48, 4 December 2024)
- ML20213A274 + (08:40:48, 4 December 2024)
- ML20213A270 + (08:40:49, 4 December 2024)
- ML20213A269 + (08:40:50, 4 December 2024)
- ML20213A266 + (08:40:51, 4 December 2024)
- ML20213A268 + (08:40:51, 4 December 2024)
- ML20213A263 + (08:40:52, 4 December 2024)
- ML20213A256 + (08:40:53, 4 December 2024)
- ML20213A252 + (08:40:54, 4 December 2024)
- ML20213A250 + (08:40:55, 4 December 2024)
- ML20213A248 + (08:40:55, 4 December 2024)
- ML20213A247 + (08:40:56, 4 December 2024)
- 05000275/LER-1986-020-01, :on 861228,reactor Trip Occurred Due to Steam Flow/Feedwater Flow Mismatch Signal Coincident W/Low Steam Generator Level Signal.Caused by Steam Line Pressure Transient Due to Opening of Steam Dump Valves + (08:41:00, 4 December 2024)
- ML20213A236 + (08:41:01, 4 December 2024)
- ML20213A231 + (08:41:03, 4 December 2024)
- ML20213A222 + (08:41:04, 4 December 2024)
- ML20213A218 + (08:41:05, 4 December 2024)
- ML20213A216 + (08:41:06, 4 December 2024)
- ML20213A213 + (08:41:07, 4 December 2024)
- PNO-I-87-033, on 870420,AECL Theratron 80 Co-60 Teletheraphy Began to Rotate While Patient Positioned to Have Anterior Neck Treatment.Treatment Using Unit Ceased.Unit Will Be Examined on 870421 + (08:41:08, 4 December 2024)
- ML20213A210 + (08:41:08, 4 December 2024)
- ML20213A208 + (08:41:09, 4 December 2024)
- NRC-87-0003, Forwards Confirmatory Analysis of Effects of Blasting Activities at Rockwood Stone,Inc Quarry & Design Calculations & Detailed Evaluation for Offsite Blasting in Relation to Unit 2,in Response to + (08:41:10, 4 December 2024)
- ML20213A204 + (08:41:11, 4 December 2024)
- ML20213A205 + (08:41:11, 4 December 2024)
- ML20213A202 + (08:41:12, 4 December 2024)
- ML20213A194 + (08:41:13, 4 December 2024)
- ML20213A196 + (08:41:13, 4 December 2024)
- ML20213A192 + (08:41:14, 4 December 2024)
- ML20213A186 + (08:41:15, 4 December 2024)
- SNRC-1309, Forwards Rev 7 to Emergency Preparedness Plan.Replacement to Fill Role of Walk in Local Emergency Response Organization Requested.Util Contends That Emergency Broadcast Station Not Required for Onsite Emergency Plan,Per NUREG-0654 + (08:41:15, 4 December 2024)
- ML20213A182 + (08:41:16, 4 December 2024)
- ML20213A180 + (08:41:17, 4 December 2024)
- ML20213A177 + (08:41:18, 4 December 2024)
- ML20213A176 + (08:41:19, 4 December 2024)
- B12394, Application to Amend License DPR-21,revising Tech Specs to Delete Ref to Switchyard Batteries.Fee Paid + (08:41:20, 4 December 2024)
- ML20213A173 + (08:41:20, 4 December 2024)
- ML20213A169 + (08:41:21, 4 December 2024)
- ML20213A165 + (08:41:22, 4 December 2024)
- ML20213A163 + (08:41:23, 4 December 2024)
- ML20213A159 + (08:41:24, 4 December 2024)