Reschedules Mgt Meetings W/Util to 870205 & 0123 at Plant Site to Discuss Restart Program & to Update Summary of Facility Scheduling Issues,Respectively.Meeting Agenda Encl
ML20213A192
Person / Time
Site: Sequoyah  
Issue date: 01/21/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8702030154
Download: ML20213A192 (4)


Text

(Js e.'so-4 JAN211987

'fennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 REVISED Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - SEQUOYAH - DOCKET N05. 50-327 AND 50-328 This confirms telephone conversation between Mr. H. L. Abercrombie of your staff and myself concerning Management Meetings to be conducted at Sequoyah on February 5,1987, at 9:00 a.m. (previously scheduled for January 22,1987),and January 23, 1987, at 8:30 a.m.

We requested the February 5 meeting to discuss the Sequoyah restart program and the January 23 meeting to update the summary of Sequoyah scheduling issues.

Enclosed is a proposed agenda for each meeting.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, Original signed by Gary G. Zech, Director Division of TVA Projects

Enclosures:

Proposed Meeting Agenda for 1/23/87 and Proposed Meeting Agenda for l

2/5/87 cc w/encls:

H. L. Abercrombie, Site Director Sequoyah Nuclear Plant P. R. Wallace, Plant Manager R. W. Cantrell, Acting Director i

l Nuclear Engineering R. L. Gridley, Director l

Nuclear Safety and Licensing M. R. Harding, Site Licensing i

Manager l

i l

bec w/encls:

J. N. Grace, RII H. R. Denton, NRR

' 8 H. L. Thompson, NRR J E J. M. Taylor, IE ruga. B. B. Hayes, 0I oo S. R. Connelly, 0IA S8 K. P. Barr, RII NRC Resident Inspector uno NRC Document Control Desk g8 State of Tennessee io re R$

RII L

RII,/'<f

/g ~

ca.a.

qvv FMcCoy/87 4

J ver 01/w 0;/

87 gg 01/1l 87

J A N 211987 REVISED NOTICE OF SIGNIFICANT MEETING Name of Licensee: Tennessee Valley Authority Name of Facility: Sequoyah Units 1 and 2 Docket Nos.: 50-327 and 50-328 Date and Time of Meeting: January P3, 1987, at 8:30 a.m.

February 5, 1987, at 9:00 a.m. (Previously scheduled for January 22)

Location of Meeting: Sequoyah Nuclear Plant Purpose of Meetings: January 23 - Update the Summary of Sequoyah Scheduling Issues February 5 - Discuss the Sequoyah Restart Program NRC Attendees: G. G. Zech, Director, Division of TVA Projects R. H. Wessman, TVA Projects, NRR B. J. Youngblood, Project Director, NRR R. L. Spessard, Deputy Director, Inspection Programs, IE J. A. Holonich, Project Manager, NRR K. P. Barr, Chief, TVA Projects Branch, DTVAP F. R. McCoy, Section Chief, TVA Projects, DTVAP K. M. Jenison, Senior Resident Inspector, DTVAP Licensee Attendees: H. L. Abercrombie, Site Director M. R. Harding, Site Licensing Manager M. Burzynski, Regulatory Staff Supervisor G. Kirk, Compliance Staff Supervisor M. Cooper, Licensing Engineer NOTE:

Attendance by NRC personnel at this Management Meeting should be made known by 2:00 p.m.,

February 3,1987, via telephone call to R. E. Carroll, FTS: 242-5543.

Distribution:

J. H. Sniezek, DEDR0GR l

J. Lieberman, Director, 0GCE J. Taylor, Director, IE l

J. Axelrad, Director, Enforcement C. Stahle, Senior Project Manager, DPL-A, PD#1, NRR T. Novak, Acting Director, Division of PWR Licensing J. Partlow, Director, Division of Inspection Program l

l I

l l

Notice of Significant Meeting 2

JAN211987 bec: J. N. Grace, RII R. D. Walker RII G. G. Zech, RII H. R. Denton, NRR H. L. Thompson, NRR J. M. Taylor, IE B. B. Hayes, 01 S. R. Connelly, 01A K. P. Barr, RII All NRC Attendees Personnel Management Specialist Receptionist J

T

~

ch r

01/2 /87 01/zt/87 01/p/87 1/qa/87

.+.1-a---

u-u.-.

a B

PROPOSED MEETING AGENDA JANUARY 23, 1987 SEQUOYAH SCHEDULING ISSUES 1.

Employee Concerns Program 2.

Allegations 3.

Welding 4.

Design Control 5.

Electrical Design 6.

Equipment Qualification 7.

Operational Readiness 8.

Cable Tray Supports 9.

Technical Specification Revisions

10. Wrongdoing, Intimidation ar.d Harassment 11.

Corporate Activities

12. QA Program 13.

OIA Technical Referrals 14.

Superheat Transient Following HELB 15.

Cable Pulling 16.

OTC Employee Concerns 17.

Technical Specification Surveillance 18.

NSRS Concerns and SWEC Concerns

19. Other Technical Issues 1

11

-- -~ - -

+

PROPOSED MEETING AGENDA FEBRUARY 5, 1987 SEQUOYAH RESTART PROGRAM I.

Operational Readiness Review II, Restart Program Restart Operatino Instruction Hold Points Startup Testing III.

NRC Restart Inspection Organization IV.

NRC/TVA Interfaces

.