Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213D039 + (08:33:49, 4 December 2024)
- ML20213D033 + (08:33:50, 4 December 2024)
- ML20213D022 + (08:33:51, 4 December 2024)
- ML20213D019 + (08:33:52, 4 December 2024)
- ML20213D009 + (08:33:53, 4 December 2024)
- 05000336/LER-1986-011, :on 861004,fire Watch Log Indicated That Area Requiring Hourly Insp Not Logged & on 861012,inoperable Fire Damper Reported.Caused by Personnel Error.Involved Fire Areas Inspected + (08:33:56, 4 December 2024)
- ML20213D007 + (08:33:56, 4 December 2024)
- ML20213D004 + (08:33:57, 4 December 2024)
- ML20213D002 + (08:33:58, 4 December 2024)
- ML20213C995 + (08:33:59, 4 December 2024)
- ML20213C999 + (08:33:59, 4 December 2024)
- 05000352/LER-1986-049, :on 861009,unplanned Isolation of Valve in RWCU Sys Occurred During Surveillance Test.Caused by Mild Contact Between Hand of Technician & Adjacent Relay.Isolation Reset & RWCU Sys Restarted.Related Correspondence + (08:34:01, 4 December 2024)
- ML20213C992 + (08:34:02, 4 December 2024)
- ML20213C990 + (08:34:02, 4 December 2024)
- ML20213C980 + (08:34:04, 4 December 2024)
- ML20213C978 + (08:34:05, 4 December 2024)
- ML20213C977 + (08:34:05, 4 December 2024)
- ML20213C976 + (08:34:06, 4 December 2024)
- ML20213C972 + (08:34:07, 4 December 2024)
- ML20213C974 + (08:34:07, 4 December 2024)
- ML20213C971 + (08:34:08, 4 December 2024)
- ML20213C967 + (08:34:09, 4 December 2024)
- ML20213C964 + (08:34:10, 4 December 2024)
- 3F0986-11, Forwards Semiannual Radioactive Effluent Release Rept Suppl for Jan-June 1986. Suppl Contains Changes to Offsite Dose Calculation Manual Inadvertently Omitted from + (08:34:11, 4 December 2024)
- ML20213C959 + (08:34:12, 4 December 2024)
- ML20213C957 + (08:34:13, 4 December 2024)
- IR 05000282/1986010 + (08:34:15, 4 December 2024)
- ML20213C947 + (08:34:16, 4 December 2024)
- FVY-86-102, Responds to 861020 Request for Results of Review of Single Failure Scenarios Re RHR Pump Impeller Wear Rings.One Scenario Identified Involved Failure of Diesel Generator. Other Scenarios Bounded by Availability of Core Spray + (08:34:17, 4 December 2024)
- ML20213C935 + (08:34:18, 4 December 2024)
- ML20213C940 + (08:34:18, 4 December 2024)
- ML20213C933 + (08:34:19, 4 December 2024)
- ML20213C929 + (08:34:20, 4 December 2024)
- ML20213C930 + (08:34:20, 4 December 2024)
- U-600907, Responds to NRC Re Violations Noted in Insp Rept 50-461/87-04.Corrective Actions:Field Verification of All 120 safety-related Protective Relays Identified Nine Relays Requiring Calibr + (08:34:21, 4 December 2024)
- ML20213C926 + (08:34:22, 4 December 2024)
- ML20213C923 + (08:34:22, 4 December 2024)
- ML20213C920 + (08:34:23, 4 December 2024)
- ML20213C916 + (08:34:24, 4 December 2024)
- ML20213C919 + (08:34:24, 4 December 2024)
- ML20213C913 + (08:34:26, 4 December 2024)
- ML20213C908 + (08:34:27, 4 December 2024)
- ML20213C911 + (08:34:27, 4 December 2024)
- ML20213C906 + (08:34:28, 4 December 2024)
- 05000333/LER-1987-007, :on 870409,during Pipe Support Program Insp, Reactor Vessel Head Vent Piping Found Inoperable & Pipe Anchor Installed But Not Welded to Piping Per Plant Drawings.Caused by Const Personnel Error + (08:34:31, 4 December 2024)
- ML20213C904 + (08:34:32, 4 December 2024)
- 3F0986-20, Advises That PE Griffith & Ta Miller Successfully Completed Accelerated Requalification Training,Including Reexam Following Failure of 1986 Annual Requalification Written Exam + (08:34:33, 4 December 2024)
- ML20213C902 + (08:34:33, 4 December 2024)
- 05000529/LER-1986-032-01, :on 861013,discovered That Two Consecutive Hourly Fire Watch Rounds Not Performed on 861002.Caused by Personnel Error.Employee Removed from Further Fire Watch Duties + (08:34:35, 4 December 2024)
- ST-HL-AE-1776, Submits Revised Section 2.2.1.2 of Util 850628 Response to Generic Ltr 83-28 Re Atws.Rev Required Since Master Parts List Under Development.Until List Developed & Approved, Evaluations Will Be Performed Each Time Parts Ordered + (08:34:36, 4 December 2024)
- ML20213C891 + (08:34:37, 4 December 2024)