Partially Withheld Ltr Confirming Dates of 870518-22 for NRR Equipment Qualification Insp of Plant.Insp Will Include Review of Implementation of 10CFR50.49 Program,Documentation Files & Physical Insp of Plant Equipment
ML20213C930
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/29/1987
From: Merschoff E
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8705140152
Download: ML20213C930 (5)


Text

_ _ _

~

[4p run 'o UNITED STATES g

)

[

g NUCLEAR REGULATORY COMMISSION

,g WASHINGTON, D. C. 20556

\\*****/

April 29, 1987 Docket No. 50-344 Portland General Electric Company ATTN: Mr. D. W. Cockfield Vice President, Nuclear Division 121 S. W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

SUBJECT:

EQUIPMENT QUALIFICATION INSPECTION OF TROJAN NUCLEAR PLANT (INSPECTION NO. 50-344/87-13)

This letter confirms the dates of May 18 through 22, 1987 for the NRC equipment qualification (EQ) inspection for Trojan. These dates were established during previous telephone conversations with your staff by Mr. S. D. Alexander of this office. The inspection will take place at your corporate engineering offices in Portland on May 18-22, 1987 and at at the plant site May 20, 1987.

A management entrance meeting is scheduled for 3:00 p.m. on Monday, May 18, 1987 at your corporate engineering offices in Portland.

A management exit meeting is tentatively scheduled for 10:00 a.m. on Friday, May 22, 1987 also at the Portland engineering offices. A plant walkdown inspection is planned for Wednesday, May 20, 1987.

l The inspection will include the following:

1.

Review of your implementation of a 10 CFR 50.49 program including preser-vation of the qualified status of qualified equipment.

2.

Review of your implementation of Technical Evaluation Report / Safety Eval-uation Report EQ corrective action commitments.

3.

Review of EQ documentation files.

4.

Physical inspection of selected plant equipment and selected field wiring.

8705140152 870429 PDR ADOCK 05000344 l

G PDR

I Portland General Electric April 29, 1987 Company ~

Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this inspection, please contact Mr. John Burdoin of NRC/RV at (415) 943-3852 or Mr. Stephen Alexander (Lead Inspector) of NRC/NRR at (301) 492-7480.

Sincerely,

  1. Ellis W. Merschoff, ng Chief N

Vendor Inspection E ranch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosure:

Inspection Team Roster 1

cc:

C. A. Olmstead, Plant Manager Trojan Nuclear Plant P. O. Box 439 Ranier, OR 97048 E. L. Davis, Chief Electrical Engineer PG&E 121 S. W. Salmon Street Portland, OR 97204

- - ~,

Portland General Electric Company Enclosure EQUIPMENT QUALIFICATION INSPECTION TROJAN NUCLEAR PLANT (50-344/87-13)

May 18 - 22, 1987 INSPECTION TEAM ROSTER NAME/0RGANIZATION CITIZENSHIP CLEARANCE SOCIAL SECURITY NO. BADGE NO.

ALEXANDER, Stephen D./NRCNRR US NRC-Q A-3492 P0TAPOVS, Uldis/hRCNRR_

US NRC-Q A-3091 BURD0lN, John F./NRCRV US NRC-Q A-058 STROMBERG, Howard M./INEL US DOE-L 00E-45295 TROJ0VSKY, Mike /INEL US DOE-L 00E-44001 JACOBUS, Mark J./SNL US DOE-Q A-08957 '--

i i

i

F t'

Portland General Electric April 29, 1987 Company, Distribution:

NRC PDR_.

Local PDR HRR Docket Files (50-344)

DRIS Reading VIB Reading RStarostecki JPartlow BGrimes EMerschoff UPotapovs SAlexander TChan, NRR/PD5 REGION V DISTRIBUTION:

JMartin, ADM, RV(LTR ONLY)

DKirsch,(A)D:DRS&P RPate,(A)C:RSB,DRS&P SRichards, C:ES, RSB AChaffee, C:RPB, MMendonca, C:RPS1, RPB JBurdoin, RPS1, RSB Robert C. Barr, SRI Trojan Nuclear Plant Box 0 Ranier, OR 97048 OFC

VIB:DRIS
SC/VIB:DRIS
ABC/VIB:DRIS:

_____:______________:....fp......:.___gp____:___________.:.___________:____________:_______

NAME :SAlexander

UPota ovs
EMersthoff :

c

_____:______________:___________,7e ___________:____________:... ________: ___________:. _____.

DATE 4 /f)/_87

4/2787 1 : 4./27,87 l

.)

Portland General' Electric April 29, 1987 Company -

Distribution:

NRC PDR Local PDR NRR Docket Files (50-344)

DRIS Reading VIB Reading RStarostecki JPartlow BGrimes EMerschoff UPotapovs SAlexander TChan,NRR/PDS REGION V DISTRIBUTION:

JMartin,ADM,RV(LTRONLY)

DKirsch,(A)D:DRS&P RPate,(A)C:RSB,DRS&P SRichards, C:ES, RSB AChaffee, C:RPB, MMendonca, C:RPSI, RPB JBurdoin, RPS1, RSB Robert C. Barr, SRI Trojan Nuclear Plant Box 0 Ranier, OR 97048

0FC :VIB:DRIS
SC/VIB:DRIS :ABC

_____:______________:.__.fp______:-__/VIB:DRIS:. gp _ _ _. :....... _ _ _ _. :... _ _ _ _

NAME :SAlexander
UPot )ovs
EMersthoff :

!DATE 4 /f)/_87

4-/2787 g_4/2787 a..___:______________:___________

.