UNITED STATES l'
NUCLEAR REGULATORY COMMISSION e
{,
,I wAsnimarom. o. c. zoons
/
NY8 Igp J
Billie Pirner Garde, Esquire Government Accountability Project Midwest Office IN RESPONSE REFER 4
104 E. Wisconsin Avenue TO F01A-86-A-98 l
Appleton, WI 54915-8605 (FOIA-85-59)
Dear Ms. Garde:
This is in further response to your letter dated June 23, 1986, in which you appealed Mr. Donnie H. Grimsley's letter dated May 22, 1986~, which denied occuments in whole or in part that were subject to your Freedom of Information Act (FOIA) request for documents related to the NRC t
Comanche Peak Task Force. My letter to you dated April 10,1987, addressed the agreement which was the basis for deleting certain
)
information in the requested documents. This letter will address those portions of 85 documents listed on Appendix H which were initially denied
{
pursuant to an FOIA exemption.
I j
Acting on your appeal, I have carefully reviewed the record in this case and have determined that the previously withheld information in the 85 documents will continue to be withheld from public disclosure pursuant i
toExemption(5)oftheFOIA(5U.S.C.552(b)(5))and10CFR9.5(a)(5) j of the Commission's regulations. Your appeal is, therefore, denied.
~
i As stated in Mr. Grimsley's letter dated May 22, 1986, the withheld portions of these 85 documents relate to the subject of potential violations. The withheld portions were predecisional to the issuing of the enforcement action on Comanche Peak.
Exemption (5) shields from L
mandatory disclosure information generated in the deliberative process j
that precedes most decisions'of government agencies.
i This is a final agency action. As set forth in the FOIA (5 U.S.C.
(
552(a)(4)(B)) Judicial review of this decision is available in a I
district court of the United States in the district in which you reside, j
have your principal place of business, or in the District of Columbia, i
Sincerely, l
\\g'y, f i
VfctorStell J
fxecutiveDirec r for Operations i
i
}
l 6
i 0700140159 D70 DOS PDH FDIA CARDE86-A-98 PDR
?
=
[ cwt %'o
'g UNITED STATES NUCLEAR REGULATORY COMMISSION o
J,
.I wAssiNorow. o. c. 20sss
\\...../
mm as t
Docket Nos. 50-445/50-446 Ms. Billie Pirner Garde. Director Environmental Whistleblower Clinic Government Accountability Project l
1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER l
Washington, DC 20036 TO F0!A-85-59
Dear Ms. Garde:
This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March 1984.
We are now placing into the NRC Public Document Room (PDR) one additional box of records (box number seven) in the QA/QC category, covering Appendix H records numbered 1 through 257.
Portions of the records identified at numbers 79 through 93, 95 through 98,100 through 112, 145 through 149, 199 f
through 201, 203 through 236, 238 through 247, and 249 are being withheld from public disclosure and 10 CFR 9.5(a)(pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5))
- 5) of the Comission's regulations. The withheld portions contain the advice, opinions, and recommendations of the staff concerning potential violations. The nonexempt portions of the Appendix H records are being placed in POR file F01A-85-59 under your name.
We are not disclosing the records identified at numbers 2,125 through 128, 136 through 139,141,142,152,162, and 253 and portions of the records identified at 4 through 9, 14, 15, 18 through 22, 75 through 79, 94, 99, 106, 111, 125 through 135, 140, 202, 211, 213, 216, 225, 233, 234, 236, 237, 240 through 243, 245, 248, and 249. We are not invoking an FOIA exemption regarding these records in light of the agreement reached between you and the NRC staff at a meeting held on May 8,1985. This agreement was sumarized in a letter to you from Joseph M. Felton, dated May 15, 1985. The information that has been deleted from these records consists of names and other identifying information concerning allegers, interviewees, and other individuals.
i Pursuant to 10 CFR 9.9 of the Comission's regulations, it has been determined that the information withheld pursuant to Exemption (5) of the FOIA is exempt from production or disclosure and that its production of disclosure is contrary i
to the public interest.
The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation.
This denial may be appealed to the Executive Director for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Executive Director for Operations. U.S. Nuclear Regulatory Comission. Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
D ' O L A Q 0/0 4 n. --l &n i
T_) U* v v wm 1I
- .I
Ms. Garde.
A separate set of the released records is being made available for public i
inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library. 701 South Cooper Street, Arlington, Texas.
Additional boxes of records in the 0A/QC category are currently under review and will be placed in the PDR and LPDR in the coming weeks.
i Sincerely 7
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosure:
As stated 1
l 4
l
]
t
Re:
APPENDIX H Box 7 - QA/QC l
DATE TITLE PAGES 1.
11/4/83 Oliver B. Cannon - Department 2
Correspondence Letter to:
File from:
R. B. Roth,
Subject:
l Meeting 11/3/83 TUSI
(
2.
11/9/33 Calendar Notes - Exhibit 1 35 i
3.
11/28/83 Oliver B. Cannon - Memo from:
12 R. B. Roth to:
R. A. Trallo,
Subject:
Coating Overview Task
~
Group Report 4,
8/14/84 U.S. NRC - Certificate of 2
Service, CASE's Motion Regarding AN! Documents Docket Nos. 50-445-1 and 50-446-1 5.
8/14/84 CASE letter to Gary Mizuno, Esq 2
from: CASE Subject CPSES Units 1 and 2, Docket Nos. 50-445 & 50-446 6,
8/14/84 US NRC Atomic Safety & Licensing 8
Board, CASE's Motions Regarding ANI Documents, Docket Nos. 50-446-1
& 50-446-1 7.
10/19/85 US NRC Transcript of License 198 presentation 8.
10/26/85 US NRC-Case Brief-Docket #
13 50 445-2 & 50-446-1 l
9.
10/26/84 Govt. Accountability Project 14 Letter to Harold Denton i
l from: GAP,
Subject:
CPSES Program Plan, October 8, 1984
Re: F0!A-85-59 APPENDIX H (Continued) l Pages l
l
- 10. 10/28/84 Departmental Correspondence 4
to:
R. B. Roth, from: A11eger
Subject:
Texas Utilities Services Letter dated, October 27, 1983
- 11. 10/28/84 Govt Accountability Project 1
Letter to: Vince Noonan from: GAP,
Subject:
Request for Non-Disclosure of Relevant Alleger Documents & Request for O! Investigation
- 12. 10/29/84 Govt. Accountability Project 2
Letter to: Ben Hayes from:
Louis Clark
Subject:
Comanche Peak
- 13. 11/5/84 US NRC Memo to Distribution 2
from: Vince Noonan
Subject:
Transmittal of Documents for Information 14.
11/7/84 CASE Transcript - Technical Interview 92 15, 11/7/84 Technical Interview 91
- 16. 12/18/84 ASLB Memorandum 82 (concerningweldingissues)
In PDR, ANO 8412190322 50-445G
- 17. No date Attachment A - Recommendations 4
for TRT Reorganization i
l
- 18. No date ANI Reports -- Design, etc 11
- 19. No date ANI Reports - Minimum Wall 3
- 20. No date ANI Reports -- Training 8
- 21. No date ANI Reports - Document Control 12
- 22. No date ANI Reports - Prompt Identi-13 l
fication & Correction of l
Nonconformances l
2 I
i L-
.-_~ -
Re:
FOIA-85-59 4
APPENDIX H (Continued)
Pages j
23, 5/31/79 CPSES/FSAR 1
l 24, 10/14/82 SIS Report 11-006 5
- 25. 10/14/82 SIS Record for Monitoring 3
i 0A/0C Programs #314
- 26. 11/11/82 SIS Record for Monitoring 4
j 0A/0C Programs #322A j
- 27. 11/18/82 SIS Record #327 6
i
- 28. 12/20/82 SIS Report 016 3
29,1/10/83 SIS Report 005 7
f
- 30. 1/13/83 SIS Record - #334 2
1
- 31. 3/1/83 SIS Record - #339 2
l
- 32. 3/8/83 SIS Record - #341 2
- 33. 4/21/83 SIS Record - #346 5
f
- 34. 4/21/83 SIS Report 9-002A 4
l
- 35. 4/21/83 SIS Record #347 2
j
- 36. 4/21/83 SIS Record #347 TRT 2
j Copy l
- 37. 5/26/83 SIS Report G-044 2
)
- 38. 6/2/83 SIS Record #353 2
l
- 39. 6/7/83 SIS Record #355 3
- 40. 6/22/83 SIS Report 4-003-2 5
j
- 41. 6/29/83 SIS Report G-051 9
l 42,6/30/83 SIS Report 10-022 3
43,7/1/83 SIS Record #356 2
)
j 44,7/2/83 SIS Record #357 TRT Copy 3
45,7/2/83 SIS Record #357 3
- 46. 7/11/83 CPSES/FSAR Amendment 41 3
- 47. 8/3/83 SIS Record #362 A 7
48,8/11/83 SIS Record #361 A 7
49,8/18/83 SIS Record #363 A 32
{
- 50. 8/18/83 SIS Record A TRT Copy 34 i
3 l
Re: F01A-85-59 APPENDIX H (Continued)
Pages
- 51. 8/23/83 SIS Record #364 7
- 52. 9/27/83 SIS Report 16-009 4
53, 10/5/83 SIS Report 10-024 2
- 54. 10/7/83 SIS Record #365 2
l
- 57. 11/9/83 SIS Record #369 4
- 58. 11/18/83 SIS Record #367-B 7
- 59. 1/5/84 SIS Report 10-030 3
- 60. 1/23/84 Brown & Root Memo 4
to B. Walker from l
J. T. Blixt,
Subject:
CPSES 35-1195 SIS Report 5-002
- 61. 1/24/84 SIS Report 10-031 2
62, 2/6/84 SIS Record 371 4
- 63. 2/17/84 SIS Report 10-032 4
- 64. 4/13/84 SIS Report 10-033 2
- 65. 4/18/84 SIS Report 10-034 3
66, 1/15/85 NRC Memo to Darrell 2
Eisenhut from Vince Noonan,
Subject:
Nov.
14-16, 1984 trip report to Comanche Peak
- 67. 2/5/85 Handwritten Memo to Vincent 2
Noonan from H. Livermore
Subject:
CASE letter to Gary Mizuno regarding ANI Reports at l
Comanche Peak l
- 68. No date Attachments List 7
4
Re:
F0!A-85-59 APPENDIX H (Continued)
Pages
- 70. No date ANI Reports - Violation of 3
Hold Points
- 71. No date ANI Reports - Intimidation 3
1
- 72. No date ANI Reports - Tests 2
- 73. No date Handwritten Notes - No title 8
18-005 1028 also 334 1029
- 74. No date Handwritten Notes - No title 1
i
- 75. 1/18 CYGNA Energy Services 17 Independent Verification Programs Grand Gulf - ENRICO FERMI - 2 Comanche Peak
- 76. 7/26/84 US NRC Letter to M. D. Spence 20 From CASE, RE: Dockets:
50-445/84-08 50-446/84-08
- 77. 9/18/84 US NRC letter to M. D. Spence 17
Subject:
Comanche Peak
- 78. 10/8/84 CASE Coments on Applicants 18 10/8/84 Program Plan to Respond to 9/18/84 Technical Review team (TRT) Report
- 79. 10/19/84 SSER Route Sheet SSER AC-24 14 AC-35/CP2 attached
- 80. 10/20/84 SSER Route Sheet SSER Draft 7 14 DCP3 concrete voids / CAT 4 attached i
- 81. 10/20/84 SSER Route Sheet SSER Draft 8 10 Allegation 10 DCP3 attached
- 82. 10/21/84 SSER Route Sheet SSER Draft 6 6
AC-26/CP3 attached
- 83. 10/21/84 SSER Route Sheet SSER Draft 7-13 6
/CP3 Attached l
i 5
Re: F01A-85-59 APPENDIX H (Continued)
Pages
- 84. 10/21/84 SSER Route Sheet SSER Draft 11 7
CP3 Attached
- 85. 10/21/84 SSER Route Sheet SSER AC-44 6
Allegation 17/CP3 Draft 6 Attached 86, 10/21/84 SSER-Route Sheet SSER Draft 8 8
Allegation 1/CP3 attached
- 87. 10/22/84 SSER Route Sheet SSER Draft 6 4
AQC-10 Category 7 CP1 Attached
- 88. 10/22/84 SSER Route Sheet SSER Draft 5 16 DCP2 Attached
- 89. 10/22/84 SSER Route Sheet SSER Draft 7 11 Attached
- 90. 10/22/84 SSER Route Sheet SSER Draft 5 7
Cat. #14/AE-17 attached 91, 10/22/84 SSER Route Sheet SSER Draft 6 10 4
Attached j
92, 10/22/84 SSER Draft 6 AQC CP2A 7
attached j
- 93. 10/22/84 SSER Draft 9 DCP3 attached 8
- 94. 10/23/84 Executive Sumary 49 Mechanical Piping
- 95. 10/24/84 SSER Route Sheet - SSER Draft 23 5 AC-30 Attached
- 96. 10/26/84 SSER Route Sheet - SSER Draft 29 2/CP6 Attached
- 97. 10/31/84 Coatings SSER 7 40
- 98. 10/31/84 SSER Route Sheet AQC-3, 11 etc 12 Attached
- 99. 11/84 Draft - Before Administration 12 Jud es 9
100. 11/1/84 Handwritten Notes - SSER 12 A00-7-14-NCRs attached t
6
F01A-85-59 APPENDIX H (Continued)
Pages 101. 11/6/84 Handwritten Notes SSER Parts 14 of BNL-14, 25, etc. attached 102.11/6/84 Handwritten Notes SSER - CP 33 Coatings 3 attached 103, 11/8/84 SSER Test Program 1 & 2 18 104. 11/8/84 SSER Test Program 4 7
105. 11/8/84 SSER Allegation AT-14 8
106. 11/8/84 SSER Test Program 7 5
107. 11/8/84 SSER Test AT-15 14 108. 11/13/84 Draft 2 40 109, 11/14/84 Handwritten Notes SSER 7
Comanche Peak Input Cont. Attached 110. 11/21/84 SSER - Electrical 1,2,3,AE-17,5, 6,7,8,9 92 111. 11/08/84 AT-18 Test Program Category 8 6
112. 11/08/84 SSER Test Program 3 4
113. 8/31/84 NRC Electrical & Instrumentation 14 Technical Review Team - Summary Review of Aliegations for CPSES 114 10/1/84 US NRC Before Administrative 4
Judges Docket N. 50-445 446 Application for Operating License 115. 10/22/84 SSER Route Sheet SSER Draft 6 4
Category No. 16/CP3 116. 11/2/84.
Routing Slip - to Vince Noonan 9
from Lawrence C. Shao,
Subject:
i Potential Open Issues of Comanche Peak TRT Review In Mechanical Piping 117. 11/8/84 CPSES NRC TRT - SSER Coatings 79 4 Coating Procedures - Draft 1 118. 11/25/84 TUGC0 Letter 10/1/84 17 7
Re:
FOIA-85-59
[
. APPENDIX H (Continued)
Pages
- 119, 1/18/85 Scope of Civil / Structural 13 Allegations 120. 1/18/85 Status Report in Mechanical 19 Piping Area 121. No date V. Miscellaneous Area 7
122. No date Dockets 50-445 446, Draft letter 22 to Texas Utilities Electric Company to M. D. Spence from Darrell-.Eisenhut
Subject:
Comanche Peak Review 123. 11/30/84-Draft Supplement 7 to SSER 33 124. No date Handwritten draft of Executive Summary of Civil and Structural Team Summary 13 125. 5/1/84.
Statement of Alleger 7
126. 05/08/84 Statement of Alleger 2
127. 08/01/84 USNRC TRT - Technical Interview 78 128. 08/01/84 Alleger Interview 3
129. 08/07/84 Documents Control Allegation 4
130. 08/21/84 Alleger I~nterview 3
131. 08/21/84 Telecon with Alleger 3
132. 08/22/84 Telecon with Alleger 3
133. No date Issues of Alleger partial 11 134. No date Issues of Alleger partial 3
135. No date Issues of A11eger partial 136.- No date Issues of-Alleger partial 1
4 136a.No date Issues of Alleger partial 8
137. No date Issues of Alleger partial 11 138. No date Issues of Alleger partial 6
139. No date Affidavit of Alleger Partial 1
140. No date Issues of Alleger 11 141. No date-Statement of Alleger 6-142. No date Affidavit of Alleger 11 k
1
Re:
F01A-85-59 APPENDIX H (Continued)
Pages 143, 8/2/84 Comanche Peak Non Conformance 1
Report 144, 8/2/84 Comanche Peak Non Conformance 1
Report 145, 8/28/84 SSER Route Sheet - SSER Electrical 11 8 Attached 146. 8/28/84 SSER Route Sheet - SSER Electrical 17 1 Attached 147, 8/28/84 SSER Route Sheet - SSER 6
Electrical 9 attached 148. 8/28/84 SSER Route Sheet - SSER 11 Electrical 5 attached 149. 8/3/84 SSER Route Sheet - SSER Electrical 100
- 1, 2, 3, CP1/AE-17. Electrical 6, 10/CP1, 13/CP3, 15/CP2, 16/CP1 150. 9/19/83 US NRC In the Matter of Texas 33 Utilities Applicants Reply to CASE's Answer to Applicants Motion for Summary Disposition Regarding Consideration of Friction Forces 151. 9/28/84 Comanche Peak - Response to CFR 4
i 50.57 (c) 152. No date Partial - IV Factual Background 12 153. 5/31/79 CPSES/FSAR 17.1.16 Corrective 2'
Action 154. 8/7/81 CPSES/FSAR - Partial 1
155, 1/27/82 NRC Policy and Planning Guidance 16 156, 7/11/83 CPSES/FSAR Amendment 41 1
Partial from Nunzio J. Palladino 9
~
Re:
F01A-85-59 APPENDIX H (Continued)
Pages 157. 5/1/84 US NRC In the Matter of Duke 25 Power Co., Et Al, Catawba Nuclear Station, Units 1 and 2 - Docket Nos. 50-413/50-414 158, 6/84 TRT Guidance 19 159. 6/15/84 Control of Reportable 5
Deficiencies Report 160. 6/29/84 TUGC0/CPSES - Records and 44 Records Retrieved 161. 6/29/84 US NRC In the Matter of Texas 62 Utilities Electric Co. - Applicants' Response Concerning Records Retrieval 162. 8/84 CPSES - Alleged Climate of Intimi-49 dation 163. 8/3/84 US NRC Motion for Authorization to 29 Issue a License to Load Fuel &
Conduct Certain Precritical Testing 164. 8/24/84 US NRC Memo Request for Evidence 3
Relevant to Fuel Loading 165. 8/27/84 NRC TRT Comanche Peak Units 1 & 2 3
Electrical Allegations & Categories i
Cross reference 166. 9/7/84 US NRC Note for H. Livermore, 36 L. Shao, R. Bangart from Annette Vietti 167. 9/10/84 US NRC Memo to M. D. Spence from 30 from L. Bangart In Rei y Refer to: Docket:
50-445/
l 84-16 10
-Re: F01A-85-59 APPENDIX H i
(Continued)
Pages 168. 9/13/84 US NRC-In The Matter of Texas 41 Utilities. Electric Co. et al CPSES Units 1 and 2 - Applicants' Supplement to Motion for Authorization Pursuant to 10 CFR and 50.57(c) 169. 9/19/83 US NRC Memo to Office 30 Directors Regional Adminis-trators from William J. Dircks-
Subject:
Proposed NRC Manual Chapter 0517, " Management of Allegations" 170. 10/1/84 US NRC Application for Operating 4
License in the Matter of Texas Utilities j
171. No date Miscellaneous Pages - No specific 13 title l
172. No date CPSES Document Control Center Chart 2
173. No date CPSES Document Control Activities 2
Milestones 174. 5/8/79 Brown & Root Drawing #FSE 00159 I
175. 8/28/79 Brown & Root Drawing #FSE 00159 1
176. 11/14/80 Drawing Mark #CT-1-013-014-S32K 2
177. 11/19/82 Brown & Root Drawing.- Mark 2
- AF-1-01-001-S338 i
178. 8/24/84 Cat. #8 As-Builts 1
L 179. 9/13/84 Paint Removal from Welds 1-180. 9/20 Handwritten Notes - Misc.
1 181. 9/21/84 CPSES TRT Telephone 1
Memorandum Between Rick Carlson & W. C. Wells 6
11
Re: F01A-85-59 APPENDIX H (Continued)
Pages 182. 9/21/84 Handwritten Listing of Hanger 4
Numbers 183. 10/4/84 Summary TRT - QA/QC Cate. #8 3
As-Built Field Review of Pipe Supports 184. 10/4/84 Summary TRT - QA/QC Cate. #8 3
As-Built Field Review of Pipe Supports 185. 10/4/84 Summary TRT - 0A/QC Cate. #8 2
AS-Built Field Review of Pipe Supports 186. 10/4/84 QA/QC As-Built Group Review 4
of Pipe Supports 187. 10/10/84 Electrical CTH & C Hangers
& Supports 188. 10/11/84 Electrical CTH & C Hangers 8
& Supports 189. No date CTH 6742 Notes & drawings 2
190. No date Handwritten notes of Inspection 1
191, No date Sequence of Events for TRT 2
As-Built Group 192. No date As-Built Review 2
193. No date Inspection List QA/QC 1
194. No date In Progress Summary 5
195. No date Supports Subject to Repairs 1
196. No date Safeguards Building - System AF 5
197 No date QA/QC As-Built Group Review 1
of Pipe Supports 198. No date QA/QC As-Built Group Review 1
of Pipe Supports 199. 9/17/84 SSER - Draft 2 CP3-AB-4, 5, 6, 18 8, 9, 10, 14, ABQ-1, 2 200, 9/19/84 SSER AP-4/CP2 23 12
~
Re: F0IA-85-59 APPENDIX H (Continued)
Pages 201. 10/22/84 SSER Category 5 - AW-44/CP3 4
202. 10/23/84 US NRC Memo to D. Eisenhut from 28 Vince Novnan,
Subject:
Comanche Peak Action Items AN0 8601170254 203, 10/24/84 SSER - Draft 3 - AP-6 CP5 8
204. 10/26/84 SSER - Draft 6 - CP2 AW-68 4
SRT-8 205. 10/26/84 SSER DCP3 Draft 5 Mechanical 2
and Piping Cat. 6 206. 10/28/84 SSER Draft 5 CP4 AW-39, 50, 58 57, 64, 53 APQ-22 207. 10/29/84 SSR CP2 AW-48 6
208. 10/30/84 SSER Draft 6 AB-12 CP4 13 209. 10/30/84 SSER Draft 7 AW-56, AQW-24 17 CPSES Issues 210. 11/1/84 SSER Draft 6 AB-11 CP2 3
211. 11/1/84 SSER Draft 8 DCP2 AW-31 13 213, 11/2/84 SSER Draft 4 AQW-75 CP2A 6
214. 11/2/84 SSER DCP5 AM-11 13 215. 11/2/84 SSER AQP-23 CPS 14 216. 11/3/84 SSER CP4 - AH-4 AH-21 11 217. 11/3/84 SSER Draft 5 DCP4 AP-11 4
218. 11/3/84 SSER DCP4-Mech Piping Cat. 23 5
219. 11/3/84 SSER Draft 5 DCP4 AW-52 AW-59 8
AW-62 220. 11/3/84 SSER Draft 3 CP5 AQW-9, AQW-8, 9
AQW-79 221, 11/5/84 SSER Draft 3 CP5 A AQP-2 10 222. 11/5/84 SSER Draft 4 DCP6 AM-29 6
13
Re:
F01A-85-59 APPENDIX H (Continued)
Pages 223. 11/5/84 SSER Draft 3, DCP5 AP-7, 10 AP-15, AP-16 224, 11/6/84 SSER DCP5 AW-43, 60, 65, 73, 18 AGW-77 Draft 5 225. 11/6/84 SSER DCP5 AW-49, 51, 55 Draft 4 15 226. 11/6/84 SSER DCP2A AW-63, Drft 8 4
227. 11/7/84 SSER CP5 SRT-1, SRT-2, SRT-3, 6
Draft 5 228, 11/7/84 SSER CP4 AP-5, AP-8, AP-10 7
Draft 6 229. 11/7/84 SSER DCP-7, Task AV-5 Draft 6 5
230, 11/6/84' SSER Draft 5 CP5A AP-12, AQ-32, 10 AQW-33 231. 11/8/84 SSER DCP2, AQW-67, 25, 29, 67, 72 7
Draft 4 232. 11/8/84 SSER DCP2 SSER Allegation 30 6
Draft 4 233. 11/9/84 SSER Draft 3 (CP2) AP-26, AP-27 7
234. 11/9/84 SSER Draft 4 AP-24, AP-25/CP2 8
235. 11/9/84 SSER DCP4 AQP-3 Draft 3 3
236. 11/9/84 SSER Draft 6 AH-8 Intimidation /
3 CP2 237. 11/9/84 US NRC Memo to Darrell Eisenhut 31 from Vince Noonan,
Subject:
Comanche Peak Action Items -
Update 238, 11/9/84 SSER Draft 4 AQW-7, CPS 5
239, 11/13/84 SSER CP3 Allegation A0W-1, 12 Draft 6 240. 11/14/84 SSER DCP4 AH-3-7, ADW-71 14 Draft 4 14
Re:
F01A-85-59 APPENDIX H (Continued)
Pages 241. 11/15/84 SSER AQW-5 CP3 - Draft 5 6
242. 11/15/84 SSER Draft 6, AH-6, etc./CP3 14 243, 11/16/84 SSER DCP2A Allegation AH-5, 8
Draft 4 244. 11/16/84 SSER DCP5 Draft 3, SRT-4, 8
SRT-6 245. 11/16/84 SSER AQW-74, DCP2 4
246. 11/19/84 SSER DCP2 AW-34, 35, 38 10 Draft 6 247, 11/27/84 SSER CP8C - Hubbard Draft 5 24 248. 12/5/84 US NRC Memo to Darrell Eisenhut 32 from Vince Noonan,
Subject:
Comanche Peak Action Items -
Schedule Update 249. No date No title - SSER 76 250. No date No title - Partial 2
251. 09/24/84 Notes - Robert Harbour 1
252, 10/23/84 US NRC Memo to Darrell Eisenhut 17 thru Vince Noonan from R. C. Tang
Subject:
NRR Procedure / Guidance for Conducting Close-out Interviews with Allegers Regarding CPSES 253. 01/03/84 SSER AQP-1, AQH-2, AQP-17 CP4 2
.l Draft 4 254. 11/06/84 Memo for Darrell Eisenhut 62 from Vince Noonan,
Subject:
NRR/TRT Procedure for Conducting Closeout Interviews with Allegers Regarding Comanche Peak 15 t
=
Re:
F01A-85-59 APPENDIX H
' ~
(Continued)
Pages 255. 11/21/84 TUGC0 Letter to Darrell Eisenhut 32 from Michael Spence
Subject:
Program - Plan and Issue Specific Action Plans - Revision 1 256, 11/23/84 US NRC Memo for Comanche Peak 4
Technical Review Team Group Leaders from Vince Noonan,
Subject:
Finalizing SSERs for Publication 257. 1/14/85 US NRC Memo for Darrell Eisenhut 2
from Vince Noonan,
Subject:
Comanche Peak Staffing 1
1 i
16
\\
i EDVERNMENT ACCOUNTADILITY PROJECT V$35 Connectic t Avenue. N.W Soire 202 Washington, D.C 20036 (202)232 8550 G:85:104 January 21, 1985
/
FREEDOM OF INFORMATION ACT REQUEST FliEdDUM OF INFOfiMATION ACI REQUESI W A~$ $
Director Office of Administration k&& g8/~g-)Q Nuclear Regulatory Commission Washington, D.C.
20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOI A"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, i
notebooks, books, telephone messages, cortputations, voice recordings, computer runoffs, any other data compilations, interim and/or final reports, status reg ports, and any and all other records relevant to and/or generated in connection with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since Ja'nuary 18, 1985.
1 This request includes all agency records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 3 9.3a(b) and the NRC Manual, supra, and covered by this reques.t have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public " 5 U.S.C. 5 552(a)(4)(a).
GAP is a non-profit. non-partisan public interest organization concerned with honest and open government. Through.public outreach, the Project promotes whistleblowers as agents of government accountability.
Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and
- intervenors in the central Te'xas area concerning the construction of the Comanche Peak nuclear power plant.
85.10151090
~
Qirector Office of Administration Page Two j
We are requesting the above information a's part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.
977 (1974).
We look forward to your response to this request within ten days.
Sir:cerely, 1
'LW Billie Pirner Garde Citizens Clinic Director l