Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214G419 + (07:06:52, 4 December 2024)
- ML20214G418 + (07:06:53, 4 December 2024)
- ML20214G417 + (07:06:54, 4 December 2024)
- ML20214G414 + (07:06:55, 4 December 2024)
- ML20214G415 + (07:06:55, 4 December 2024)
- ML20214G413 + (07:06:57, 4 December 2024)
- ML20214G412 + (07:06:57, 4 December 2024)
- ML20214G408 + (07:06:58, 4 December 2024)
- ML20214G406 + (07:06:59, 4 December 2024)
- ML20214G405 + (07:07:00, 4 December 2024)
- ML20214G404 + (07:07:01, 4 December 2024)
- ML20214G401 + (07:07:02, 4 December 2024)
- ML20214G403 + (07:07:02, 4 December 2024)
- ML20214G397 + (07:07:04, 4 December 2024)
- ML20214G395 + (07:07:05, 4 December 2024)
- ML20214G393 + (07:07:05, 4 December 2024)
- ML20214G390 + (07:07:06, 4 December 2024)
- ML20214G387 + (07:07:07, 4 December 2024)
- ML20214G384 + (07:07:08, 4 December 2024)
- ML20214G370 + (07:07:10, 4 December 2024)
- ML20214G366 + (07:07:11, 4 December 2024)
- TXX-6447, Responds to NRC 870408 Request for Addl Info Re Violations & Deviations Noted in Insp Repts 50-445/86-15 & 50-446/86-12. Failure of Overview Insp to Note Inconsistency Was Oversight.Overview Inspector Received Addl Training + (07:07:11, 4 December 2024)
- ML20214G364 + (07:07:12, 4 December 2024)
- ML20214G365 + (07:07:12, 4 December 2024)
- ML20214G363 + (07:07:13, 4 December 2024)
- 05000321/LER-1987-007-01, :on 870418,isolations on Valve Groups 3 & 4 Occurred.Caused by Surveillance Procedure Not Containing Complete List of Links to Open & Jumpers to Be Installed to Prevent Actuations.Procedure Revised + (07:07:15, 4 December 2024)
- ML20214G351 + (07:07:16, 4 December 2024)
- ML20214G357 + (07:07:16, 4 December 2024)
- ML20214G348 + (07:07:17, 4 December 2024)
- ML20214G342 + (07:07:18, 4 December 2024)
- ML20214G346 + (07:07:18, 4 December 2024)
- ML20214G340 + (07:07:19, 4 December 2024)
- ML20214G337 + (07:07:20, 4 December 2024)
- ML20214G338 + (07:07:20, 4 December 2024)
- ML20214G335 + (07:07:21, 4 December 2024)
- ML20214G327 + (07:07:22, 4 December 2024)
- ML20214G331 + (07:07:22, 4 December 2024)
- ST-HL-AE-2174, Forwards One Oversize Drawing Containing safety-related balance-of-plant Setpoints.Setpoints Determined Using Westinghouse Setpoint Methodology Submitted in Util + (07:07:23, 4 December 2024)
- PNO-I-87-043, on 870514,during Reactor Trip Breaker Response Time Testing,Reactor Trip Occurred.Steam Generator Feedwater Isolation Pressure Transient Resulted in Failure of Two Lines to Thermal Relief Valves.Cause Under Investigation + (07:07:24, 4 December 2024)
- ML20214G321 + (07:07:25, 4 December 2024)
- 05000454/LER-1987-010-05, :on 870419,Tech Spec 3.0.3 Entered Due to Two Trains of Main Control Room Ventilation Being Inoperable. Caused by Drift of High Differential Pressure Switch. Differential Pressure Switch Recalibr + (07:07:26, 4 December 2024)
- ML20214G317 + (07:07:27, 4 December 2024)
- ML20214G315 + (07:07:28, 4 December 2024)
- ML20214G314 + (07:07:29, 4 December 2024)
- ML20214G313 + (07:07:30, 4 December 2024)
- ML20214G310 + (07:07:31, 4 December 2024)
- ML20214G305 + (07:07:33, 4 December 2024)
- ML20214G304 + (07:07:34, 4 December 2024)
- ML20214G301 + (07:07:35, 4 December 2024)
- ML20214G294 + (07:07:36, 4 December 2024)
- ML20214G295 + (07:07:36, 4 December 2024)
- ML20214G284 + (07:07:38, 4 December 2024)