Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J248 + (06:54:50, 4 December 2024)
- ML20214J245 + (06:54:51, 4 December 2024)
- ML20214J243 + (06:54:52, 4 December 2024)
- ML20214J242 + (06:54:52, 4 December 2024)
- TXX-6456, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr for Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Next Rept Will Be Submitted by 870721 + (06:54:53, 4 December 2024)
- ML20214J239 + (06:54:53, 4 December 2024)
- ML20214J235 + (06:54:54, 4 December 2024)
- ML20214J233 + (06:54:55, 4 December 2024)
- ML20214J231 + (06:54:55, 4 December 2024)
- ML20214J228 + (06:54:56, 4 December 2024)
- ML20214J224 + (06:54:57, 4 December 2024)
- ML20214J223 + (06:54:57, 4 December 2024)
- ML20214J220 + (06:54:58, 4 December 2024)
- ML20214J212 + (06:54:59, 4 December 2024)
- ML20214J215 + (06:54:59, 4 December 2024)
- ML20214J206 + (06:55:01, 4 December 2024)
- TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424 + (06:55:01, 4 December 2024)
- ML20214J201 + (06:55:02, 4 December 2024)
- 05000269/LER-1986-012, Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120 + (06:55:03, 4 December 2024)
- ML20214J199 + (06:55:03, 4 December 2024)
- ML20214J189 + (06:55:06, 4 December 2024)
- ML20214J185 + (06:55:07, 4 December 2024)
- ML20214J184 + (06:55:07, 4 December 2024)
- TXX-6108, Interim Deficiency Rept CP-86-12 Re Commodity Installations at Secondary Wall Design Gaps.Initially Reported on 860227. Relative Movement Criteria Will Be Included in Insp Procedure to Ensure Min Separation.Next Rept by 870123 + (06:55:08, 4 December 2024)
- ML20214J181 + (06:55:08, 4 December 2024)
- ML20214J180 + (06:55:09, 4 December 2024)
- ML20214J179 + (06:55:10, 4 December 2024)
- ML20214J177 + (06:55:10, 4 December 2024)
- ML20214J174 + (06:55:11, 4 December 2024)
- ML20214J169 + (06:55:12, 4 December 2024)
- NRC-87-0049, Forwards History of Instrument & Miscellaneous Connection Problems Pertaining to Main Steam Instrument Line Repairs, Per NRC Request Made at 870428 & 29 Meetings + (06:55:13, 4 December 2024)
- ML20214J166 + (06:55:13, 4 December 2024)
- 05000341/LER-1986-041, :on 861021,plant Allowed to Operate W/Drywell Sump Flow Monitoring Sys Inoperable.Caused by Inadequate Procedure Which Resulted from Cognitive Personnel Error. Surveillance Procedure Revised + (06:55:15, 4 December 2024)
- ML20214J161 + (06:55:15, 4 December 2024)
- ML20214J159 + (06:55:16, 4 December 2024)
- ML20214J157 + (06:55:17, 4 December 2024)
- NL-87-616, Informs of Status of Ongoing Effort to Resolve NRC Open Items.Encl Rept Includes List of Items Completed Since Last Rept,Dtd 870331,as Well as Summary Status of All Priority a, B & C Items + (06:55:18, 4 December 2024)
- ML20214J153 + (06:55:18, 4 December 2024)
- ML20214J151 + (06:55:19, 4 December 2024)
- ML20214J144 + (06:55:20, 4 December 2024)
- ML20214J142 + (06:55:20, 4 December 2024)
- 05000416/LER-1986-036, :on 861016,Tech Spec Limiting Condition for Operation Not Met When on 861015,channel Ventilation Exhaust Monitors B & C Removed from Svc by Opening & tagging-out Supply Breakers to Support Mod Work + (06:55:22, 4 December 2024)
- ML20214J137 + (06:55:23, 4 December 2024)
- ML20214J135 + (06:55:23, 4 December 2024)
- ML20214J134 + (06:55:24, 4 December 2024)
- ML20214J131 + (06:55:25, 4 December 2024)
- ML20214J133 + (06:55:25, 4 December 2024)
- ML20214J130 + (06:55:26, 4 December 2024)
- ML20214J128 + (06:55:26, 4 December 2024)
- ML20214J126 + (06:55:27, 4 December 2024)
- ML20214J117 + (06:55:28, 4 December 2024)
- ML20214J123 + (06:55:28, 4 December 2024)